Seismoacoustic Effects Of Driving Large Diameter Piles ? Summary
By Barry C. Roth
Driving of large piles in water can impact marine wildlife. Bubble curtains can mitigate these adverse effects. The procedures for and preliminary results of monitoring airborne, waterborne and ground
Jan 1, 2001
-
Seven Mile Dam Retrofit - A Global Challenge
By Arvindh Gupta
BC Hydro proposed to improve the stability of the existing Seven Mile Dam with 54 corrosion protected, re-stressable anchors comprising 92/0.6? strands each, in phase 2 of the program. Being globally
Jan 1, 2004
-
Dynamic Characterization Of Drilled Shafts On Doremus Avenue Bridge
By Martina Balic
Dynamic properties of the drilled shaft foundations supporting Doremus Avenue Bridge were determined by forced vibration testing. The main objectives of the substructure testing at Doremus Avenue Brid
Jan 1, 2004
-
Implementation Of Alternative Deep Foundation Systems
By Ray Zelinski
Caltrans sponsored a research project in 1992 which incorporated proprietary and generic pile types. The piles were subjected to axial tensile/compressive loads in deep, soft soils. Descriptions of va
Jan 1, 1993
-
Ground Improvement By Stone Columns At Formosa Plant Taiwan And Its Earthquake Response
By Wolfgang G. Brunner
Mai- Liao, in Yun Lin province of Taiwan, which was once a remote area on the coast of the South China Sea, has been developed into an offshore industrial complex. Approximately 100 million m3 of impo
Jan 1, 2002
-
Effect of Axial Compression on Lateral Pile Response: Laterally Loaded Test Pile Comparison
By David S. Graham, Joseph D. Bailey, Paul J. Axtell, Michael K. Muchard
"Two instrumented test piles were simultaneously subjected to a static lateral load test by jacking the piles apart. One of the piles was loaded in axial compression via kentledge during the lateral l
Jan 1, 2017
-
Rammed Aggregate Pier System Provides Uplift Resistance At University Ice Arena
By John G. DiGenova
The Allwell Center Ice Arena at Plymouth State University, Plymouth, New Hampshire is located in the flood plain of the Pemigewasset River. To maintain the arena near the level of the surrounding are
Jan 1, 2011
-
Helical Piles With Grouted Shafts - A Case History
By Shawn Downey
A helical pile with in-situ grouted shaft was used to underpin the existing slab of a large retail store in the Edmonton, Alberta Canada area. The existing structural slab did not have the capacity to
Jan 1, 2003
-
Heating and Cooling Structures with Steel Pile Foundations - Closed Loop Standing Column Well Technology (df25801f-7df6-457c-ab18-569c2a6ce07f)
By Paul Suver
"The closed loop standing column well (CLSCW) system uses a closed circuit of water to develop the same thermal heat exchange characteristics that are achieved from traditional open circuit standing c
Jan 1, 2017
-
Compaction-Induced Lateral Earth Pressures And Vertical Shear Forces Acting On Non-Moving Retaining Walls
By George M. Filz
Restrained basement walls and unrestrained but massive concrete walls on rock foundations experience very small movements in response to lateral earth pressures. Such walls are often designed using at
Jan 1, 2003
-
Observational and Numerical Evaluation of Defects in Deep Mixing Method Columns Used for LNG Process Train Structural Foundation Support (30cbb62b-9335-4a4e-8105-e672f3e82ba5)
By Paul Summers, Kevin Richardson, Willem (Billy) Villet, Paul J. Sabatini, Edward C. Clukey
"Between 2008 and 2009, more than 6,000, 23-m long deep mixing method (DMM) elements were constructed to support 124 concrete mats comprising the foundations for the process trains for an LNG facility
Jan 1, 2017
-
On The Ultimate Capacity And Radial Stress Distribution Of Driven Piles In Sands
By E. Ulrich Klotz
It is difficult to predict accurately the capacity of driven piles in sand. In practice, this uncertainty either leads to conservative designs if the capacity is under-predicted, or worse, if the cap
Jan 1, 2002
-
Wick Drain Guide Specification (Method)
"1.0 DESCRIPTIONThis work consists of furnishing all necessary labor, equipment, and materials to install prefabricated vertical (wick) drains in the ground in accordance with the Plans and as specifi
Jan 1, 2014
-
Drilled Displacement Rigid Inclusions Support Port-Based Cement Facility
By Morgan NeSmith
The Port of Palm Beach is a full-service landlord port in Riviera Beach, Florida. The port and its tenants process more than $14 billion in commodities. About 80% of these are exports, which makes the
Apr 1, 2023
-
Field Testing of Energy Piles at Virginia Tech (eec8519c-b3f5-4281-8615-91be67ef6c77)
By C. Guney Olgun, Charles Elks, Sherif L. Abdelaziz, James R. Martin, Christopher Fox, Pier Luigi Iovino, Fatih Catalbas, Pierre Gouvin
"Energy piles are a new innovative renewable energy technology to access and exploit the relative constant temperature of the ground for efficient heating and cooling of buildings. Examples of energy
Jan 1, 2017
-
Stabilizing A 100 Ft Rock Slope With Limited Access And Tight Construction Tolerances Using Observational Method And Real-time 3d Modeling
By Travis A. Shoemaker, Mitchell S. Youmans, Nancy T. Chin, Michael S. Senior
A geologic assessment and stability analysis of the right abutment of Boundary Hydroelectric Dam in Pend Oreille County, Washington was completed in May 2017. The stability analyses identified a poten
-
Remedial Work On Large Pile Deviation In The Very Thick Marine Swamp Clay Deposit
By Wanchai Teparaksa
Pile deviation generally can happen after installation of driven pile particularly in soft soil layers. In this case study, all 242 diameter 0.8 m spun piles were deviated from 20 to 820 mm. The large
Jan 1, 2002
-
Difficulties In Caisson Construction
By Ronnie W. Sisk
1. Troubles start early - Inadequate Geotechnical Data A. Owners think they are saving money by allowing limited soil borings at their site. This places a high gamble on the bidders and the Lump Sum
Jan 1, 1988
-
Silver Star Motors “Tackles” Brownfield Site and Adjacent NYCT Subway
By Dharmil Patel, Michael J. Chow
"Construction progress is nearing completion at a Brownfield Site for a 100,000sf mixed-use 10 story building plus cellar for Silver Star Motors including a two-floor pre-owned Mercedes Benz showroom;
Jan 1, 2016
-
Cut-Offs in Temporary Coffer Dams As Seepage Barriers for Concrete Dam Construction –A Case Study of Teesta –V H E Project in Sikkim (India)
By I. D. Dayal, Anil Kumar Jain
"Cutoff walls are frequently used to slow down or prevent seepage of water through and/or around dams. Cutoff wall is a type of seepage barrier structure designed to reduce the flow of water underneat
Jan 1, 2016