Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Evaluation of Fracture Resistance of High Strength 7075 and 7050 Aluminum AlloysBy K. Purazrang, P. Sh. Naseri, P. Abachi
In present work, the comparative measurement of aluminum alloys' resistance to the unstable fracture was provided. Besides, the rupture mechanisms of high strength 7075 and 7050 aluminum alloys w
Jan 1, 2006
-
Air and Mine-GasesBy Alex MacEachern
Air is the gaseous substance that envelopes the earth and forms its atmosphere. It is remarkable in the constancy of its composition; for while this is being continually changed as the result of the r
Jan 1, 1930
-
The Effect Of Chemical Interaction In Ni(II Ion FlotationBy F. S. Hoseinian, M. Irannajad, M. Safari
In this study, the effect of chemical interactions of materials used in ion flotation on the removal of Ni(II) ions from low concentration synthetic wastewater was studied. Sodium dodecyl sulfate (SDS
Jan 1, 2016
-
The action of lime in promoting pipeline flow of tailing slurriesBy G. W. Poling, J. R. Hoffert
"A common practice in preventing gravity-fed tailing pipeline from plugging due to sanding is to add lime at relatively high dosage rates. The lime affects the rheology of the slurry ""vehicle"" which
Jan 1, 1985
-
Use of 2D and 3D Large-Strain Consolidation Theory to Solve Tailings DepositionBy Murray D. Fredlund
The consolidation of soil material is central to many types of engineering analysis. Problems such as the building of highway structures, landfills, or buildings over saturated soft clays require appl
Aug 1, 2010
-
Development of Buzwagi Mine in Tanzania Feasibility Study, Permitting & Project ExecutionThe Buzwagi Project is owned by Barrick Gold Corporation and located in the Lake Victoria Goldfields of central Tanzania in the District of Kahama in the Region of Shinyanga. The property is 6 km Sou
May 1, 2009
-
Cyclones at East Malartic Mines Ltd.By J. W. Keyes
"The original grinding circuit at East Malartic consisted of two 8 by 8 C.A.C. mills in closed circuit with two 72 inch Akins Classifiers and an 8 by 10 secondary mill in closed circuit with two 48 in
Jan 1, 1964
-
The application of a total energy system at the Polaris mining projectBy A. Nielsen
"The Polaris mining operation (Fig. I) is located on Little Cornwallis Island in the Canadian Arctic, an area with a very limited shipping season and a hostile climate. The operation consists of the u
Jan 1, 1984
-
Field identification of Cu-Au-Fe-Oxides Bearing Hydrothermal Systems in Undifferentiated Gneiss Complexes of the Grenville ProvinceBy Louise Corriveau
Exploration strategies have traditionally considered felsic gneiss complexes of the Canadian Shield sterile. This paradigm is challenged with the discovery of extensive granulite-facies Cu-Au, Fe oxid
May 1, 2003
-
Structure of Gold Deposits in the Crow River Area, OntarioBy Jas. E. Thomson
PUBLIC attention was first attracted to the Crow River area of north-western Ontario by the discovery of gold in 1928. The first three discoveries were eventually developed into Central Patricia, Pick
Jan 1, 1938
-
A Kinetic Model of Anode Copper Reduction and Comparison with Industrial DataBy Paul E. Mather, Matthew J. M. Krane
Anode or fire refining is the final pyrometallurgical step in the production of copper anode. Part of this process purifies liquid copper by reducing its dissolved oxygen with a natural gas-steam mixt
Jan 1, 2019
-
Monarch and Kicking Horse Mines (e1256bf9-531c-4f9f-a430-d293cf06c4ff)By W. L. Brown
"The properties of Base Metal Mining Corporation are in Yoho Park about 2 1/2 miles northeast of Field; British Columbia; on the main line of the Canadian Pacific railway. There are actually two mines
Jan 1, 1954
-
Development of New Erbia-Doped Yttria Stabilized Zirconia Solid Solutions via Spark Plasma SinteringBy L. Bichler, C. J. Verdon
In this work, the effect of doping yttria stabilized zirconia (YSZ) with 5, 10 and 15 mol% erbium oxide (Er2O3, erbia) was investigated using spark plasma sintering (SPS) technique. Sintering was carr
Jan 1, 2014
-
Rabbit Lake project - milling and metallurgyBy w. w. Milde
"Since its startup in 1975, the Rabbit Lake mill has been modified (0 process both increased tonnage and higher grade ore. Ore initially came from the Rabbit Lake pit . In 1985, a major mill expansion
Jan 1, 1989
-
Case history of Borehole Pulse EM surveys at the Falconbridge Lindsley discovery in SudburyBy D. Crone, T. Watts
"The Lindsley project was a program of deep drilling to test the contact down-dip from two nickel-copper deposits, one uneconomical and the other mined out. The role of Borehole Pulse EM(PEM) was to d
Jan 1, 1992
-
Fine Partice, Liquid and Bubble Size Distribution Measurement in LiquidsBy G. Dodbiba, A. Otsuki, T. Fujita, J. Ponou, A. Shibayama
"The different types of nano to submicron particles, which are well-dispersed nano particles, coagulated nano particles or settled submicron particles, have been measured by the interactive force appa
Jan 1, 2016
-
Bonded-particle simulation of Tunnel Sealing ExperimentBy T. S. Wanne
Tunnel sealing experiment (TSX) was conducted between 1997 and 2004 in the Canadian URL located in Manitoba. In the experiment, a tunnel was excavated parallel to the maximum principal stress directio
May 1, 2009
-
Recycling of Non-Ferrous Metals at Hydrométal, BelgiumBy N. Verbaan, Ph. Henry, S. Lamotte
Hydrometal(lurgy) provides an adequate technology to reintroduce otherwise lost metal units into the industrial cycle, thereby saving resources and energy, while keeping the environment cleaner. Three
Jan 1, 2004
-
Numerical Simulation Of Turbulent Natural Convection Along Vertical Plane ElectrodesBy S. Kawai
Natural convective flow of the electrolyte solution plays an important role in several electrochemical systems. Copper refining electrolysis is the most important industrial process to produce high pu
Jan 1, 2007
-
Long-Term Planning at RaglanBy Lee W. T. Weitzel
This paper reviews the Falconbridge- SMRQ?s Raglan project in northern Quebec and the process that was used in developing its current long-term mine plan. Challenges were many and not only limited to
May 1, 2002