Search Documents

  • AUSIMM
    The Heavy Media Separation Coal Washing Plant at Lidsdale, New South Wales

    The Heavy Media Separation plant operated at Lidsdale siding, eight miles from Lithgow, by the N.S.W. Mining Co. is a product of the Western Machinery Company, of D.S.A.This mill, designed to use fine

    Jan 1, 1954

  • SME
    Role Of The Tunneling Machine

    By William H. Hamilton

    INTRODUCTION It was not very many years ago that tunneling machine manufacturers spent considerable time trying to convince contractors and mine operators of the advantages of mechanical tunnel bor

    Jan 1, 1997

  • CIM
    Environmental planning in mine waste management — The Huckleberry Mines experience (CIM BULLETIN)

    By H. F. Letient, D. C. Johnson

    At the 25th Annual B.C. Mine Reclamation Symposium in September 2001, Huckleberry Mines Limited received the Jake MacDonald Reclamation Award for its exemplary mine waste management plan, conceived to

    Jan 1, 2004

  • NIOSH
    RI 5989 Effects Of Selected Operating Variables On Continuous-Cell Flotation Of Coal: A Laboratory Study ? Introduction And Summary

    By J. B. Gayle

    Commercial flotation plants operate on a continuous basis that is not simulated closely by the batch testing methods widely used in Bureau of Mines laboratory studies of flotation, Batch methods indic

    Jan 1, 1962

  • NIOSH
    OFR-44-82 Underground Mine Disaster Survival And Rescue: An Evaluation Of Research Accomplishments And Needs ? Overview

    An underground mine disaster is an accident of major proportions that takes a significant toll in human lives. A disaster usually disrupts the normal functioning of a mine and may result in entrapment

    Jan 1, 1981

  • SAIMM
    Re-aligning the cutting sequence with general support work and drafting a support sequence at Simunye Shaft

    By K. Lombard

    "‘Roof support awaiting time’ (RSAT) is a term used at Goedehoop Colliery’s Simunye Shaft to describe the potential production time lost due to the continuous miner (CM) standing idle waiting for roof

    Jan 1, 2015

  • SME
    Simulation Assisted Performance Improvements in Iron Ore Processing Plants (4c3a19f0-0877-40d2-a6da-cdc5ac5ec399)

    By S. Ersayin

    In 1998, the Concentrator Modeling Center was established within the Coleraine Minerals Research Lab to develop models for simulation of iron ore processing plants, and to assist plant operators in im

    Jan 1, 2008

  • CIM
    A Novel Clean Metallurgical Process for Baotou Ore:The Industrial Test Data

    By Y. Bai, J. J. Liu, D. Q. Li, S. Z. Liu, X. T. Wang

    "This paper presents the results of an industrial test using 8 t/d of Baotou concentrate (50% REO) of a clean metallurgical process, which includes: 1. Roasting with H2SO4 at low temperature (220~260

    Jan 1, 2014

  • SME
    The Flotation Chemistry Of Potassium Double Salts: Schoenite, Kainite, And Carnallite

    By M. Hancer, J. D. Miller

    It is known from soluble salt flotation practice that the K, Mg double salts of kainite (KClMgSO43H2O), and carnallite (KClMgCl26H2O) are difficult to float and must be converted to other salts such a

    Jan 1, 2001

  • SME
    Factors in the Variability of Measured Surface Settlements over EPB Driven Tunnels in Soft Clay

    By S. Boone, J. N. Shirlaw

    INTRODUCTION Soft, near normally consolidated clays generally provide ideal conditions for tunneling using Earth Pressure Balance (EPB) shields. It is easy to turn the clay into a low permeability,

    Jan 1, 2007

  • SME
    Drop Shafts for Narragansett Bay Commission CSO Abatement Program, Providence, Rhode Island

    By Rafael C. Castro, Geoffrey Hughes, Fredrick (Rick) Vincent, Philip H. Albert

    Seven pairs of drop and ventilation shafts, between two and nine feet in diameter, will convey combined sewer flow to a 230-foot-deep, 26-foot diameter storage tunnel. This paper will present case his

    Jan 1, 2007

  • DFI
    Case History Of The Support Of Excavation System At The San Diego State University (SDSU) LRT Station

    By Allan Sylvester

    This paper will discuss the design, construction, and performance of the support of excavation on the San Diego State University LRT Station. The vertical elements of the system include drilled secant

    Jan 1, 2002

  • NIOSH
    IC 8213 Refractory-Clay Deposits Of Utah

    By Joel N. Van Sant

    An investigation was conducted to study possible sources of Utah refractory and structural clays that could be used for the manufacture of refractories and light or buff burning heavy-clay products. A

    Jan 1, 1964

  • NIOSH
    OFR-43(3)-77 Mine Fire Protection For Underground Fuel Storage And Transfer Area - Introduction

    It is not uncommon to find large quantities of combustible materials in underground metal and non-metal mines. Support timber is the predominant combustible material. Spontaneous combustion, welding a

    Jan 1, 2011

  • IIMP
    Administración y optimización de operaciones de Heap Leaching haciendo uso de un simulador de procesos en Minera Yanacocha

    By Pedro Condori

    Usualmente, la minera Atacocha está expuesta a grandes precipitaciones pluviales durante una larga temporada húmeda. Por lo que es necesario eliminar gran parte del agua colectada por las lluvias a tr

    Sep 9, 2007

  • DFI
    Driven Piles In Glacial Deposits Exhibiting Time Dependent Capacity

    By Upendra L. Karna

    The pile capacity gain with time evaluated and implemented for the construction of the Route 21 Viaduct in Newark, NJ, U.S.A is discussed in this paper. The project consisted of the replacement of mor

    Jan 1, 2006

  • SAIMM
    Strength and mechanics of fractured rocks under triaxial loadings

    By A. M. Hefny, F. P. Siew, P. G. Ranjith

    Fracture initiation and propagation, being one of the most intensive subjects in rock mechanics; contribute significantly to the deformation of jointed rock masses. An experimental study on fractured

    Jan 1, 2003

  • DFI
    Production And Testing Of 600 Reinforced-Concrete Piles For The Central Bank Of Iraq

    By H. Meseck

    The new building of the Central Bank of Iraq in Baghdad was footed in difficult underground conditions on more than 600 reinforced concrete driven piles, with cross-sectional diameters of 45 x 45 cm a

    Jan 1, 1989

  • AUSIMM
    Mine Planning Information from Photogrammetry Sources at the El Teniente Mine

    By P González, E Córdova, E Faundez

    An integrated mine system must be capable of displaying and reporting valuable information that can be used to easily understand, manage and take action on the key parameters being reported.One of the

    May 9, 2016

  • AUSIMM
    Sulphide-Silicate Reactions During Metamorphism of The Nairne Pyrite Deposit

    The mineralogy of the rocks now observed in the Nairne pyrite deposit developed under conditions of internally-controlled sulphur activity during amphibolite facies metamorphism. In the sulphide-defic

    Jan 1, 1969