Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Numerical Modeling for Increased Understanding of the Behavior and Performance of Coal Mine Stoppings
By Lisa Burke
In underground coal mines, concrete block stoppings are widely used to control mine ventilation. Although stoppings are not intended as roof support, they are subjected to roof to floor convergence, a
Jan 1, 2004
-
Effect of the Approaching Longwall Faces on Barrier and Entry Stability
By Klaus-Dieter Beck
RAG American Coal Holding, Inc. affiliates operate two longwall mines in the Pittsburg seam in Pennsylvania, the Cumberland mine and the Emerald mine. A unique situation in longwall operation occurred
Jan 1, 2004
-
Heat-Imaging Experimental Study Of Reducing Local Gas Accumulation By Rotary Radial Jet
By S. Q. Yang
Rotary radial jet improves greatly the pulsing velocity of airflow along each direction everywhere in the entry, intensifies transverse migration of air, eliminates effectively the local gas accumulat
Jan 1, 2004
-
Load And Convergence Measurements In Longwall Faces And Design Guidelines For Face-Support Systems
By Reha Ozel
The stability in longwall faces depends on the interaction beman the roof strata, face supports and floor strata. The load distribution on the other hand, depends upon relative stiffness of the three
Jan 1, 1990
-
Roof Bolt Response To Shear Stress: Laboratory Analysis (01deebbf-0c9c-422b-b7e0-1ccfd8e161d8)
By Ed Mchugh
Recent studies by researchers from the National Institute for Occupational Safety and Health indicate that shear loading contributes significantly to failure of bolts used for rock reinforcement in co
Jan 1, 1999
-
Structure, Strength And Relaxation Of Interbuden For Input Into Highwall Mining Design In The Baralaba Coal Measures Of Queensland, Australia
By Bret E. Leisemann
The geomechanical environment in which highwall mining must operate represents a hybrid between surface and underground operations. Mine design must take into consideration the complexities associated
Jan 1, 1993
-
Field Testing of a Real Time Roof Mapping Drilling Display System in a Limestone Mine
By Craig Collins
The objective was to develop a Real Time Drilling Display System for Rotary Roof Bolting using Analyzing Software to display mapped holes as they are being drilled in real time. The Analyzing Softw
Jan 1, 2004
-
Mapping and Application of Roof Joint Patterns for Ground Control inAn Illinois Mine
By Kenny D. Basnett
An analysis of the Roof Falls Data Base (RFDB) for underground coal mines in Illinois for the period 2004?2008 indicated that about 80% of the roof falls occur at intersections and are associated with
Jan 1, 2011
-
New Design Criteria for Roof Bolt Systems
By John C. Stankus
From research started six years ago, a new design criteria has been developed for mine roof bolt systems This design criteria precisely and quantitatively determines parameters such as bolt length, in
Jan 1, 1997
-
Effects of Bolt Spacing, Bolt Length, and Roof Span on Bolt Loading in a Trona Mine
By Steve P. Signer
Researchers from the Spokane Research Laboratory of the National Institute for Occupational Safety and Health installed 39 instrumented, fully grouted bolts at six test sites in a trona mine retreat p
Jan 1, 2001
-
Empirical Approach to Calculate Rock Loads in Coal Mine Roadways
By Erdal Unal
In order to define the support parameters, by use of empirical approaches, it is particularly important to analyze the rock-load height that should be controlled by supports. The controlling mechanism
Jan 1, 1986
-
Monitoring and Prediction of Ground Movements Above Underground Mines in the Eastern United States
By M. Karmis
mining factors and representative ground movement parameters. Based on this analysis, the previously developed prediction methods were modified and tested for their applicability in the Appalachian co
Jan 1, 1987
-
Proposed Criteria for Assessing Subsidence Damage to Surface Structures
By Swapan Bhattacharya
Section 516 of Public Law (PL) 95-87, commonly known as the Surface Mining Control and Reclamation Act of 1977 (SMCRA), requires that underground coal mine operators must 'adopt measures consiste
Jan 1, 1984
-
Economic Evaluation Of Subsidence Damage Mitigation Techniques
By David C. Johnson
Coal mining in Illinois has resulted in many structures being exposed to subsidence damage. Damage mitigation techniques (DMT) applied in the foundation design/construction have proven successful in m
Jan 1, 1993
-
Extraction Ratio In Thin Seams Assuring No Surface Subsidence
By Kot F. v. Unrug
The depletion of thicker coal reserves has resulted in the thinner seams being economically attractive. Surface protection against subsidence limits the extraction ratio to 50% for the room and pillar
Jan 1, 2001
-
Methods of Controlling Hard Roof in a Longwall Face
By Linsheng Xu
When coal seam is under the integral thick sandstone (or conglomerate), the structure of thick sandstone is integral and its strength is rather high. After coal is extracted, the roof is hanging and c
Jan 1, 1986
-
A Novel Ground Control Program at Plateau Mining Company
By Hamid Maleki
A novel ground control program has been developed at Plateau Mining Company through five years of geotechnical investigations. The study was initiated to determine the causes for roof stability proble
Jan 1, 1987
-
In Situ Stress For Underground Excavation Design In A Naturally Fractured Rock Mass
By Andrew J. Hyett
The ISRM commission on testing methods has recently presented Suggested Methods for rock stress determination (Kim & Franklin, 1987). This proposes that even if the magnitude of in situ stress is not
Jan 1, 1989
-
Introducing the New Windows ARMPS-LAM Program
By Keith Heasley, Christopher Newman, Zach Agioutantis
"Previously, in 2013, a laboratory version of the computer code ARMPS-LAM, introduced at the 32""d International Conference of Ground Control in Mining, successfully integrated the laminated overburde
Jan 1, 2016
-
Calibration Of The Analysis Of Longwall Pillar Stability (ALPS) Chain Pillar Design Methodology For Australian Conditions
By Mark Colwell
This paper summarizes the results of a research project whose goal was to provide the Australian coal industry with a chain pillar design methodology readily usable by colliery staff. The project was
Jan 1, 1999