Methods of Controlling Hard Roof in a Longwall Face

International Conference on Ground Control in Mining
Linsheng Xu
Organization:
International Conference on Ground Control in Mining
Pages:
11
File Size:
2146 KB
Publication Date:
Jan 1, 1986

Abstract

When coal seam is under the integral thick sandstone (or conglomerate), the structure of thick sandstone is integral and its strength is rather high. After coal is extracted, the roof is hanging and caving is difficult. When the method of full caving is adopted in the longwall working face to control this kind of hard and difficult caving roof, the effect of roof-controlling affects directly the production and safety. In China Datong Coal Mines the extracting coal deposit is Datong Jurassic period. Most of the roof is sandstone and conglomerate. It is hard and difficult to cave. Having used special hydraulic power supports and other special ways to deal with the roof, the hard and difficult caving roof has been controlled.
Citation

APA: Linsheng Xu  (1986)  Methods of Controlling Hard Roof in a Longwall Face

MLA: Linsheng Xu Methods of Controlling Hard Roof in a Longwall Face. International Conference on Ground Control in Mining, 1986.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account