Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Design, Testing, and Production of Steel Fiber Reinforced Concrete Segmental Tunnel Lining for the East Side Combined Sewer Overflow TunnelBy K. Wongaew, R. F. Cook, J. E. Carlson, T. Cleys, C. R. Smith
Steel fiber reinforced concrete segmental rings are the final tunnel lining for approximately 85% of the alignment for a 6.706-meter (22-foot) internal diameter tunnel being built as part of the East
Jan 1, 2007
-
Iron Removal From Turkish Quartz Sand By Chemical Leaching And BioleachingBy V. Arslan
The primary advantage of using oxalic acid is in the formation during leaching of soluble complexes that are both photo-chemically and microbiologically degradable. In this study, chemical leaching an
Jan 1, 2009
-
Columbus Circle Station Complex - History and RehabilitationBy Aram Grigoryan
This paper addresses historical aspects and construction sequencing of the subway complex under Columbus Circle in Manhattan; the structural elements of the rehabilitation and new construction; and th
Jan 1, 2008
-
Statistical Significance Of Some Operating Parameters On Dolomite Removal From Phosphate Using Amphoteric CollectorBy A. M. Elmahdy
An amphoteric collector was tested for dolomite removal from phosphate ore. The effects of some operating parameters and their significance on the flotation of dolomite were studied using statisticall
Jan 1, 2007
-
Applications Of Passive Seismic Imaging In Underground MiningBy Ma. X.
Passive seismic imaging is applied in underground mining to analyze the stress redistribution after the occurrence of a major seismic event. The velocity model is established to be utilized in velocit
Feb 27, 2013
-
Ground Freezing Under the Most Adverse Conditions: Moving GroundwaterBy Paul C. Schmall, Lucian P. Spiteri, Arthur B. Corwin
Moving groundwater is generally recognized as the most adversarial condition for ground freezing. Moving groundwater can occur due to natural or man-induced groundwater flow, but either way may result
Jan 1, 2007
-
Leaching Of Sarcheshmeh Copper Oxide Ore In Sulfuric Acid SolutionBy H. Razavizadeh
The recovery of copper from oxide ores containing from 2% to 4.1% acid-soluble copper from the Sarcheshmeh mine in Kerman province of Iran was investigated by agitation leaching in sulfuric acid media
Jan 1, 2008
-
An American Down Under Living And Working In Australia - IntroductionBy J. G. Pippenger
The mining industry has been Australia?s major economic driver over the past decade, contributing 8% to Australia?s Gross Domestic Product and 26% of Australian Stock Exchange Market capitalisation.
Jan 1, 2011
-
NATM Strategies In The U.S.?Lessons Learned From The Initial Support Design For The Caldecott 4th BoreBy Bhaskar B. Thapa
The design of the Caldecott 4th Bore, located along State Route 24 in Oakland, California, is based on the principles of the New Austrian Tunneling Method (NATM). Typical NATM initial support design p
-
Pressure Sulfuric Acid Leaching of Manganese-Rich Slag with Pyrite as Additive Mining, Metallurgy and ExplorationBy Shanming He, Jinliang Wang, Xiaoming Wang, Chunfa Liao
Large amounts of manganese-rich slag were generated from smelting low-grade manganese ore containing high iron and high phosphorus in electric furnace or blast furnace, which contain 25–40 mass% Mn. T
-
Pressure Sulfuric Acid Leaching of Manganese-Rich Slag with Pyrite as Additive Mining, Metallurgy and Exploration (7db33dda-c50f-417f-8a4f-b58cc9ccfa5b)By Shanming He, Jinliang Wang, Xiaoming Wang, Chunfa Liao
Large amounts of manganese-rich slag were generated from smelting low-grade manganese ore containing high iron and high phosphorus in electric furnace or blast furnace, which contain 25–40 mass% Mn. T
-
Construction of a Mixed Face Reach Through Granitic Rocks and ConglomerateBy John J. Murray, Michael T. McRae, Michael A. Krulc, Kathy L. Schuler
The San Vicente Pipeline Tunnel Project involves the construction of an 8.5-foot-diameter water pipeline in an 11 mile tunnel in San Diego, California. The tunnel is located in extremely variable geol
Jan 1, 2007
-
Using Option Pricing to Predict Market Values of Publicly Traded Mining CompaniesBy Andrew K. Simpson
What will this deal do to the company’s stock price? This question arises when a publicly traded mining company is presented with a new mine project, or business combination. The standard tool fo
Jan 1, 2000
-
Design And Construction Of Norad Expansion Project "Excavation Phase"By Gerald G. Griswold, Allan G. Provost
INTRODUCTION The Norad Expansion Project was located 10 miles southwest of Colorado Springs, Colorado, within Cheyenne Mountain. The expansion areas to be excavated would be adjacent to the existin
Jan 1, 1979
-
Energy Fuels Prepared To Ride Uranium?s ResurgenceThe two candidates in the upcoming presidential election in the United States each say that they have their own solution to the nation?s energy problems - solutions that will increase the amount of en
Jan 1, 2008
-
Transporting A TBM Through A Large City On The East Side CSO Tunnel Project In Portland, ORBy Niels Kofoed
Upon completion of the 6,200 m (20,340 lineal ft; lft) North Tunnel drive for the Portland East Side Combined Sewer Overflow (CSO) Tunnel project in Portland, OR, the slurry tunnel boring machine (TBM
Jan 1, 2011
-
Bleeder Entry Evaluation Using Condition Mapping and Numerical ModelingOne of the most common critical areas of longwall mining in terms of ground stability are the gateroad and bleeder entries. These critical entries provide much-needed safe access for miners and allow
Jan 7, 2020
-
Exploration (2303cc71-ebf3-44eb-bd90-42769f9f3467)By D. R. Wilburn
The worldwide budget for nonferrous, nonfuel mineral exploration was expected to increase by 58 percent in 2004 from the 2003 budget, according to Metals Economics Group (MEG) of Halifax, Nova Scotia.
Jan 1, 2005
-
World?s Largest TBM Keeps Niagara Project On TrackBy Doug Harding
The Niagara Tunnel Project (NTP) is a 10.4-km- (6.5- mile-) long, 14.4-m (47.5-ft) bored tunnel that will run under the city of Niagara Falls from the Upper Niagara River to the Sir Adam Beck power st
Jan 1, 2008
-
Mitigation Measures To Minimize Subsidence Damages Caused By Longwall Mining To Historic Structures & Their EffectivenessBy K. Kohli
A case study involving a historic structure undermined by longwall mining is presented in this paper. The location of this study is in South Western-Pennsylvania; USA. The structure is 150-years old a
Jan 1, 2002