Use Of High Efficiency Electrical Submersible Pumps For Large Scale Mine Dewatering

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 6
- File Size:
- 1116 KB
- Publication Date:
- Feb 27, 2013
Abstract
A case study is provided that highlights the successful use of high efficiency electrical submersible pumps (ESPs) adapted from the oil and gas industry for a large scale, open pit mine dewatering operation. In this case, the mine is Goldcorp?s Peñasquito Mine, Peñasco and Chile Colorado open pit development areas in Zacatecas, Mexico. At the time of publication (July 2012), there were 18 vertical bedrock dewatering wells producing an average flow rate of 350 liters per second (lps) from the Peñasco and Chile Colorado development areas. Average pumping rate per well was 18 lps, with a maximum of 44 lps. The depth of wells varies from 330 m to 500m, and includes both in-pit and perimeter (ex-pit) pumping centers. A network of 50 piezometers was used to monitor the response of groundwater levels to pumping. Since dewatering operations were initiated in 2007, groundwater elevations decreased overall, from approximately 1950 m above sea level (masl) to around 1625 masl, for a total of 340 m of drawdown. The pit floor elevation was approximately 1655 masl. All of the producing wells were constructed with 16-inch boreholes, completed with 10-inch diameter blank casing and louvered screen sections and equipped with ESPs. The application of ESPs has proven to be highly effective in the case of Peñasquito?s dewatering operations. Noted advantages include the following: ? Small diameter pump allows use of smaller diameter boreholes (16 inches) and casing / screens (10 inches) reducing well drilling and construction costs ? Greater application range for flow rate and total dynamic head ? Variable speed drive systems for greater energy efficiency and flow rate optimization ? Integration of downhole instrumentation into the motor and pump assembly The advantages and benefits of using high efficiency ESPs revolutionized the dewatering program at Peñasquito open pit mine as evidenced by the number of deep vertical well installations and high dewatering flow rates and total dynamic head requirements.
Citation
APA:
(2013) Use Of High Efficiency Electrical Submersible Pumps For Large Scale Mine DewateringMLA: Use Of High Efficiency Electrical Submersible Pumps For Large Scale Mine Dewatering. Society for Mining, Metallurgy & Exploration, 2013.