  • DFI
    Large Diameter Steel Pipe Piles Running Under Self Weight In Soft Clay ' Predicted Vs. Observed Behavior ' Richmond San Rafael Bridge Seismic Retrofit

    By A. R. Dover

    The Richmond San Rafael Bridge (Figure 1) is a 4.3 mile long major toll bridge span across northern San Francisco Bay. Tutor-Saliba/Koch/Tidewater (TSKT) conducted a comprehensive seismic retrofit, wh

    Jan 1, 2006

  • DFI
    Insitu Ground Reinforcement Techniques

    By Peter J. Nicholson

    The methods of reinforcement to be discussed in this paper are all insitu methods, ones that can be used on the soil structure as it exists in the ground, and do not rely on excavation and replacement

    Jan 1, 1991

  • DFI
    Cut-and-Cover Excavation Challenges

    By Sitotaw Y. Fantaye

    "The first segment of the Second Avenue Subway extension is approaching construction completion. The new extension will operate along Second Avenue from 96th Street to 63rd Street, where it will diver

    Jan 1, 2016

  • DFI
    Bluestone Dam Safety Assurance Program: An OPA Runner Up

    By Jeff Hopple

    "Bluestone Dam in Hinton, W.Va., along the New River, is owned and operated by the U.S. Army Corps of Engineers (USACE). Completed in 1949, the dam is 165 ft (50 m) tall, 2,048 ft (624 m) wide, and en

    Jan 1, 2014

  • DFI
    Design and Construction of Driven H-Piles for Landslide Stabilization in Marlboro Clay

    By Charbel Khoury, Kwabena Ofori-Awuah, Kofi B. Acheampong

    "Following heavy rains in spring of 2014, Prince George’s County officials issued a mandatory evacuation for homes in the Piscataway Hills subdivision of Fort Washington, Maryland where a landslide al

    Jan 1, 2017

  • DFI
    Use of Enhanced Pre-Mixed Self-Hardening Grout for an Emergency Cut-Off Wall Intervention in West Africa

    By Maurizio Siepi, Bruno Vingiani, Claudio Asioli

    "The article describes an emergency rehabilitation intervention executed at Buyo Dam, in Ivory Coast, to intercept a significant water seepage occurring through the foundation of this zoned earthfill

    Jan 1, 2016

  • DFI
    Repair Methods For Corroded Steel Piles

    By C. Vipulanandan

    With the aging infrastructure, there is a need to maintain and extend the service life of steel structures in general and steel piles in particular. Steel piles support not only vertical loads but als

  • DFI
    Repair Methods for Corroded Steel Piles (0af709a8-9f1e-4f35-81ea-c69c3ee7fb05)

    By C. Vipulanandan, M. Dawood, Dongmei Pan

    "With the aging infrastructure, there is a need to maintain and extend the service life of steel structures in general and steel piles in particular. Steel piles support not only vertical loads but al

    Jan 1, 2017

  • DFI
    Micropiles in an Urban Setting – TBTA Verrazano Narrows Bridge HOV/BUS Ramps, Brooklyn, NY and Nysdot Kosciuszko Bridge Replacement, Brooklyn, NY

    By M. D. Riegel, Brian T. Felber

    "Construction of foundation elements in an urban environment is often complicated by multiple constraints such as existing foundations, utility conflicts, maintenance and protection of traffic on high

    Jan 1, 2016

  • DFI
  • DFI
    Presentation #5 - The High-Strain Dynamic Load Test (Drop Weight Test) - Contents

    By Frank Rausche

    Why testing What tests can be done Dynamic load testing Loading device Measurements Analysis Examples

    Jan 1, 2001

  • DFI
    Contribution of Inner Frictional Resistance to Bearing Capacity of Open-Ended Piles

    By Janaka J. Kumara, Takashi Kurashina, Yoshiaki Kikuchi, Takahiro Yajima

    "The inner frictional resistance of open-ended piles depend heavily on the degree of soil plugging. Many factors including pile diameter, relative density and end conditions of the piles influence the

    Jan 1, 2017

  • DFI
    Analytical and Field Estimates of Shaft Resistance in Socketed Piles: Bandra-Worli Sea Link, Mumbai

    By Sunil S. Basarkar, Dilip M. Dewaikar, Rajesh H. Gajjar

    "A load transfer program AXPILE was developed for simulation of the loadmovement characteristics of socketed piles of the Mumbai reg ion. This program used empirical relationships for ultimate shaft r

    Jan 1, 2005

  • DFI
    Residual Load Development Case Study In Driven Cast-In-Situ Piles

    By Packer M. L

    Residual load development in driven precast piles has been widely researched in recent decades, however, cast-in-situ piles are often falsely assumed to be unaffected by this mechanism. In contrast to

    May 1, 2022

  • DFI
    Construction Of Foundation Of Power House-IV At W.Y.C., Hydro-Electric Project, H.S.E.B., Bhudkalan, Haryana. - Synopsis

    By D. K. ] [Gupta

    The Foundations of the Shear keys and alround cut off for Power House -IV of the Western Yamuna Canal Hydroelectric Project at Bhudkalan, Haryana were to be laid at a depth of 26M below the N.S.L and

    Jan 1, 1996

  • DFI
    Helical Pile Foundations at Tangier Island Substation

    By Jeff Wilkinson, Brandon Walter

    "A&N Electrical Cooperative provides electrical service to the counties of Accomack and Northampton along Virginia’s Eastern Shore and to Smith Island in Somerset County, Md.A&N recently worked to imp

    Jan 1, 2017

  • DFI
  • DFI
    Design and Delivery of Micropile Installation Leveraging Augmented and Virtual Reality

    By Guilherme L. M. G. Carvalho, Zachary T. Fleming

    In a world of 2-dimensional design documents, envisioning and understanding 3-dimensional interferences for complex foundation construction scenarios can be challenging. Videos and computer models ser

    Jan 1, 2019

  • DFI
    Engineering Successful Dewatering in Arid Urban Areas: Abu Dhabi Dewatering Guidelines

    By M. Melih Demirkan, Juan J. Gutierrez, Raghav Ramanathan

    "As the capital of the United Arab Emirates (UAE), Abu Dhabi is one of the world’s fastest-developing cities. To sustain its significant growth rate, Abu Dhabi must surmount challenging engineering pr

    Jan 1, 2017

  • DFI
    PSC Piles Overcome Challenges for $650m Power Plant

    By Tim Siegel, III Fondren, Billy Camp

    "INTRODUCTIONThe new $650 million power block at Santee Cooper’s Cross Generating Station in Cross, South Carolina is being constructed on driven pre-stressed concrete (PSC) piles. S&ME, as geotechnic

    Jan 1, 2004