Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Integrated seismic reflection and borehole geophysical studies at Les Mines Selbaie, Quebec

    By E. Adam, B. Milkereit, M. Salisbury, L. E. Reed, G. Perron

    Integrating seismic reflection, borehole geophysical, and physical rock property studies is an effective means of mapping lithological contacts and structures in the crystalline crust. At Les Mines Se

    Jan 1, 1997

  • CIM
    Tile catenary idler as a means of energy absorption and spillage prevention

    By Douglas G. Jay

    "Transfer points on belt conveyors have long been a source of problems for both designers and users. Conveyors are generally given a low priority in new equipment layout, thus designers are often forc

    Jan 1, 1982

  • CIM
    The Princeton Coal Field British Columbia

    By E. R. Hughes

    Introduction Situated 182 miles east of Vancouver, on the Kettle Valley branch of the Canadian Pacific railway, the Princeton coal field is readily accessible to the Coast markets. The area covers

    Jan 1, 1947

  • CIM
    Continuous Improvement Initiatives at the Newmont Ghana Gold Limited Ahafo Gold Mine

    By J. van Huyssteen, M. Cantor

    Newmont Ghana Gold Limited's Ahafo Operation has matured from its project ramp up stage into steady state operations after three years of operation. Management focus has shifted from addressing c

    Jan 1, 2011

  • CIM
    The Line Creek Operation-an update

    By D. A. Riva

    "The Line Creek Project is located in southeastern British Columbia, approximately 25 kilometres north of Sparwood. The design is to produce a total of2.7 million tonnes of coal annually. This is made

    Jan 1, 1982

  • CIM
    The Influence of Large Unit Equipment on Mine Plant Design

    By A. G. Spencer, A. D. Taylor

    This paper discusses some of the advantages and problems associated with the selection of large unit equipment for a metallurgical plant. A given flowsheet and material balance for an iron ore concent

    Jan 1, 1968

  • CIM
    A Study of the Capillary Pressure.-Hydrodynamic Relationship to Soil Accumulation in Stratigraphie Traps

    By Ben Habermann

    "The object of the work described in this paper was to increase the understanding of the relation that capillary pressure of a rock, hydro-dynamics, and accumulation of oil in stratigraphie traps have

    Jan 1, 1960

  • CIM
    First Use of the Double Steel and Concrete Sandwich Lining for Keeping High-Pressure Water Out of a Potash Shaft

    By U. Storck

    "Shaft sinking for exploitation of the deep potash beds in Saskatchewan involved great difficulties from the very first because of the need to exclude from the shaft the high-pressure water encountere

    Jan 1, 1968

  • CIM
    Roof Bolting

    By Edward Thomas

    Note. - Securing mine roof through consolidating thin or otherwise incompetent strata to increase overall thickness of the immediate roof beam is a new method of roof support and control which has ar

    Jan 1, 1950

  • CIM
    Current Research in the Geological Sciences in Canada

    By J. E. Hawley

    This paper constitutes a report from the Committee on Geological Research to the Geology Division of the Institute. Two years have elapsed since a formal report was made containing several resoluti

    Jan 1, 1949

  • CIM
    The Ecstall Story: The Underground Mine .

    By John Ramsay, Frederick A. Edwards, J. Eric Belford, Clarence V. Amyotte

    "DEVELOPMENT of the underground mine is carried out from a main ramp driven from surface to the 800 and 1200 levels and from a shaft sunk to 3050 ft. Sub-levels at approximately 100-ft vertical interv

    Jan 1, 1974

  • CIM
    III.-Rock-Bursts at Lake Shore Mines

    By W. T. Robson

    ONE of the problems encountered in any mine is the effect of increasing pressure manifested by increasing depth. Although the depth at which excessive pressure assumes serious proportion, and the mann

    Jan 1, 1940

  • CIM
    Nuclear Fuel Resources and Price Trends

    By D. D. Bell

    This paper presents the history of uranium procurement and demand, and takes a look at future requirements. The three basic conclusions drawn are: (1) the productive capacity of former and existing pr

    Jan 1, 1967

  • CIM
    An Overview of the Design, Construction, Commissioning and Early Years of Operation of the SAG/Ball Mill Grinding Circuit at Phu Kham Copper, Gold Operation in Laos

    By J. B. Hadaway

    The operation at Phu Kham commenced design and construction in early 2006 and was commissioned in May 2008. This paper will examine and discuss the project from the inception of flow sheet development

    Jan 1, 2012

  • CIM
    Study on the Uniaxial Compressive Strength of Rail Transit Passing Through area in Chongqing

    By Yong-neng Feng, Xiao-ping Chen, Wei Guo

    "While the uniaxial compressive strength of rock has been extensively investigated, the relation between the saturation and natural compressive strength is relatively unexplored. This paper studies on

    Jan 1, 2015

  • CIM
    Pilot Plant Pressure Oxidation of Refractory Gold-Silver Concentrate

    By D. Yuan, L. Yan, R. Kalanchey, M. J. Collins, I. M. Masters

    Pressure oxidation tests have been conducted by Sherritt for a refractory gold-silver project located in China. The feed contained 39 g/t Au and 970 g/t Ag; the major gold-bearing minerals were pyrite

    Jan 1, 2011

  • CIM
    A scoping study method for determining the viability of block caving a hard rock orebody

    "A method is described for determining the viability of hard rock orebody extraction by block caving. Using a very limited amount of geotechnical data, the procedure enhances Laubscher’s empirical sta

    Jan 1, 2002

  • CIM
    Rock Pressure Studies In the Mines of Springhill, N. S. A Progress Report

    By A. Brown

    IN INTRODUCING the subject of rock pressures, it may safely be assumed that mining men are only too familiar with the physical effects of strata stresses that accompany the extraction of minerals. It

    Jan 1, 1956

  • CIM
    Sustainability In Iron & Steel - A Historical Review of U. S. Steel Canada’s Lake Erie Works

    By Jack Young

    U. S. Steel Canada Inc.’s Lake Erie Works is the last green field integrated plant to be built in North America. The plant was designed using the best available environmental technology to develop an

    Jan 1, 2015

  • CIM
    Progress in Coal Mining Technology

    By A. Ignatieff

    This is the first in a series of Coal Technology Reviews being prepared in accordance with a recommendation voted by the Coal Division in session at the Jubilee Meeting, Vancouver, April, 1948, that t

    Jan 1, 1948