An Overview of the Design, Construction, Commissioning and Early Years of Operation of the SAG/Ball Mill Grinding Circuit at Phu Kham Copper, Gold Operation in Laos

Canadian Institute of Mining, Metallurgy and Petroleum
J. B. Hadaway
Organization:
Canadian Institute of Mining, Metallurgy and Petroleum
Pages:
13
File Size:
1615 KB
Publication Date:
Jan 1, 2012

Abstract

The operation at Phu Kham commenced design and construction in early 2006 and was commissioned in May 2008. This paper will examine and discuss the project from the inception of flow sheet development and equipment selection, equipment design and manufacture, construction, commissioning and ramp up to full production. The paper will touch on the strategies employed to achieve a short schedule and the efficient use of capital, but with the main emphasis on the grinding circuit. Various challenges during the early years of operation will be discussed including the effect of ore characteristics, including competency, on the performance of the grinding circuit. Actions to overcome these challenges and to enhance performance will also be discussed. Finally, current and future plans to improve the performance of the grinding circuit and the overall plant will be summarised.
Citation

APA: J. B. Hadaway  (2012)  An Overview of the Design, Construction, Commissioning and Early Years of Operation of the SAG/Ball Mill Grinding Circuit at Phu Kham Copper, Gold Operation in Laos

MLA: J. B. Hadaway An Overview of the Design, Construction, Commissioning and Early Years of Operation of the SAG/Ball Mill Grinding Circuit at Phu Kham Copper, Gold Operation in Laos. Canadian Institute of Mining, Metallurgy and Petroleum, 2012.