Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Metamorphism Of Precambrian Massive Sulfide Terrain At Bagdad, Arizona

    By Daniel E. Collins

    Massive banded Fe-Zn-Cu-Pb sulfide deposits in the Bagdad are associated with metamorphosed eugeosynclinal mafic volcanic and intrusives rocks Precambrian age. The geologic environment is very similar

    Jan 1, 1977

  • SME
    Effect of additives on drilling in hard rock (Technical Paper)

    By R. Haecker, S. Gupta, P. Somasundaran

    Rock disintegration processes are usually inefficient and costly operations in mineral beneficiation, mine development and oil well preparations. Thus, there is a strong need for improving the energy

    Jan 1, 2000

  • SME
    Thermal Exposure Limit in a Simulated Refuge AlternativeMining, Metallurgy and Exploration

    By C. D. Ashley, X. P. Garzon-Villalba, R. M. Lopez, T. E. Bernard

    Federal standards for refuge alternatives (RAs) mandate that they not exceed a Steadman apparent temperature (AT) of 95 °F (35 °C) at an assumed metabolic rate of 325 W, a limit that appears to be arb

  • SME
    Thermal Exposure Limit in a Simulated Refuge AlternativeMining, Metallurgy and Exploration

    By C. D. Ashley, X. P. Garzon-Villalba, R. M. Lopez, T. E. Bernard

    Federal standards for refuge alternatives (RAs) mandate that they not exceed a Steadman apparent temperature (AT) of 95 °F (35 °C) at an assumed metabolic rate of 325 W, a limit that appears to be arb

  • SME
    Unprecedented In-Tunnel Diameter Conversion of the Largest Hard Rock TBM in the U.S. - NAT2022

    By Evan Brinkerhoff, Steve Chorley

    The largest hard rock TBM ever to bore in the USA, an 11.6 m diameter Robbins Main Beam TBM, recently underwent a planned in-tunnel diameter change to a more compact 9.9 meters. The first-of-itskind c

    Dec 1, 2022

  • SME
    Full-Panel Screen Testing: More Realistic but what Changes?

    By T. M. Klemetti, T. J. Batchler, T. J. Matthews

    How representative are partial-panel screen tests of the in situ response of screen to roof and rib deterioration and displacements? Can a more representative procedure that tests up to two full scree

    Jan 1, 2019

  • SME
    The Use And Misuse Of Geology In Computer-Generated Resource Estimations: Some Case Histories

    By S. J. Ristorcelli

    Historically, geologic data has not been adequately considered in resource estimation. More recently, with the use of computers and sophisticated estimation algorithms and geostatistical justification

    Jan 1, 1994

  • SME
    A Case Study Of Ground Control Problems Related To Multiple Seam Mining In The Pittsburgh And Sewickley Coalbeds

    The Bureau of Mines, U.S. Department of Interior, is currently investigating strata interactions associated with the mining of multiple coalbeds. Strata interactions due to subsidence are a result of

    Jan 1, 1985

  • SME
    Intelligent Sensor Data Analysis Using A1 Based Techniques

    By Paul J. A. Lever, Robert H. King

    Human operators, geological conditions, equipment changes, mining sequences, and roof conditions are some of the continually changing operating conditions that drive a dynamic mining environment. Thes

    Jan 1, 1993

  • SME
    Solubility of Some Metal Ethyl Xanthates

    By P. J. M. van Heteren

    The flotation system is usually distinguished from other physical chemical systems by the importance of interactions at the solid-liquid and solid-gas interfaces. In recent years, numerous quantitativ

    Jan 1, 1958

  • SME
    Conditioning Of Florida Phosphate Rock Using Gravity Flow Mixer

    A conventional paddle-type mixer and a gravity flow mixing device were evaluated for conditioning of phosphate ore with fatty acid and fuel oil, and for acid scrubbing prior to cationic flotation. Gra

    Jan 1, 1987

  • SME
    Abatement Of A Failure In Piping Soil Above An Abandoned Mine, East St. Louis, Illinois ? Introduction

    By R. A. Cummings

    From before the turn of the century until as recently as the 1950s, relatively shallow coal reserves near the margins of the Illinois Basin were extracted by room- and pillar methods. Subsequent devel

    Jan 1, 1985

  • SME
    Selection Of Mining Machinery Based On Mechanical Delay Statistics: An Application Of Goal Programming To Capital Budgeting

    By Robert L. Grayson

    An application of goal programming (GP) in evaluation of proposed purchases of major mining machinery is presented. It incorporates historical operating data compiled on mechanical delays to productio

    Jan 1, 1982

  • SME
    Building Response And Mitigation Measures For Building Damages In Illinois

    By James W. Mahar

    The following paper summarizes our observations on building response to mine subsidence and techniques for mitigation of building damage. The subsidence cases are located in Illinois. The general desc

    Jan 1, 1982

  • SME
    SME Annual Conference features more than 120 sessions, 6,300 attendees

    By Georgene Renner, Chee Theng, William Gleason

    "More than 6,300 people attended SME’s 2016 Annual Conference & Expo in Phoenix, AZ and many of them made the trip to the conference to take part in the excellent technical sessions that are presented

    May 1, 2016

  • SME
    The Base Metal Industry In Mexico Its Current Status And Implications For The Future ? Introduction

    By R. M. Campoy

    Mexico's mineral wealth has long been recognised and indeed has played a historically significant role on a world scale. The dynamics of the Mexican mineral industry have experienced a dramatic t

    Jan 1, 1985

  • SME
    Technical Note: Proposed Method For Estimating Leach Recovery From Coarse Ores

    By W. J. Schlitt

    Introduction A major uncertainty in assessing the potential for heap-and dump-leach projects is how to determine the extraction-rate curve for the recovery of the mineral values from coarse ore. Su

    Jan 1, 1998

  • SME
    Tarp North Branch Tunnel Leg – A Case History

    By Joseph P. Sobanski, Michael P. Bruen

    The North Branch tunnel segment of the Tunnel and Reservoir Plan Mainstream System consists of 14,075 m (45,885 ft) of 9.2 m (30.2 ft) finished diameter and985 m (3,232 ft) of 2.5 m (8.25 ft) finished

    Jan 1, 1999

  • SME
    Unique Challenges for the Construction of PATH’s Exchange Place Cross-Passage Tunnel - NAT2022

    By Todd Kilduff, James Grillo, Shrey Arora

    In efforts to improve ingress/egress from the existing subway platforms in PATH’s Exchange Place Station, a new 18-foot horseshoe cross-passage tunnel was constructed by Walsh Construction who retaine

    Dec 1, 2022

  • SME
    Use Of Satellite Imagery In The Study Of Geologic Structure And Roof Stability Relationships

    By Thomas A. Simpson

    Heretofore, underground coal mines in Alabama have operated under only 60 to 360 meters of cover: however, new mines (at least 5 in the early opening or development stages) will be operating under cov

    Jan 1, 1975