Unique Challenges for the Construction of PATH’s Exchange Place Cross-Passage Tunnel - NAT2022

Society for Mining, Metallurgy & Exploration
Shrey Arora Todd Kilduff James Grillo
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
11
File Size:
5501 KB
Publication Date:
Dec 1, 2022

Abstract

In efforts to improve ingress/egress from the existing subway platforms in PATH’s Exchange Place Station, a new 18-foot horseshoe cross-passage tunnel was constructed by Walsh Construction who retained Kilduff Underground Engineering for design of the initial support system and to install and maintain geotechnical instrumentation. The project presented some unique challenges as a result of the proximity to pedestrians on the platform. PATH service remained uninterrupted, limiting the Contractor to mechanical means of excavation to advance the heading. The logistics proved very challenging for the approximate 100-foot-long tunnel excavated in soft Manhattan Schist. This paper will present the design and construction challenges for the project.
Citation

APA: Shrey Arora Todd Kilduff James Grillo  (2022)  Unique Challenges for the Construction of PATH’s Exchange Place Cross-Passage Tunnel - NAT2022

MLA: Shrey Arora Todd Kilduff James Grillo Unique Challenges for the Construction of PATH’s Exchange Place Cross-Passage Tunnel - NAT2022. Society for Mining, Metallurgy & Exploration, 2022.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account