Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Stochastic Modeling Of Stormwater And Receiving Stream ConcentrationsBy R. W. Chappell, M. W. Hills, R. L. Olsen
A stochastic approach was developed and applied to the Butte, Montana Hillside abandoned mining site for modeling stormwater runoff and subsequent receiving stream loadings. This approach enabled cap
Jan 1, 2002
-
A Laboratory Investigation Of Underside Shield Sprays With A Shearer-clearer Water Spray System To Improve Dust Control On Longwall Faces - SME Annual Meeting 2022By S. S. Klima, A. L. Mazzella, J. S. Driscoll, T. W. Beck
Previous testing was performed by researchers at the National Institute for Occupational Safety and Health (NIOSH) to improve longwall dust control using underside shield sprays with a longwall direct
Mar 2, 2022
-
Application of Mining Width‑Constrained Open Pit Mine Production Scheduling Problem to the Medium‑Term Planning of Radomiro Tomic Mine: A Case Study - Mining, Metallurgy & Exploration (2024)By Juan L. Yarmuch, Gonzalo Sepulveda
This article presents a novel approach to address the mining width-constrained open pit mine production scheduling problem in the context of medium-term planning. A mathematical formulation is propose
Mar 28, 2024
-
South Arturo, NevadaBy R. Hipsley, D. Arbonies, P. Dobak
South Arturo is a “Carlin-type”, breccia-hosted, oxide gold deposit located at the north end of the Carlin Trend. The discovery hole was drilled in July 2005 from mine dumps 1,000 feet south of the D
Jan 1, 2007
-
Towards an Understanding of the Use of Disodium Carboxymethyl Trithiocarbonate (DCMT) as an Alternative Depressant in Cu/Mo Sulfide Flotation - Mining, Metallurgy & Exploration (2021)By PEILIN LAN, LEONARD HILL, SIMON TIMBILLAH, BERNARD FOSU, CESAR SOSA-BLANCO
The use of sodium hydrosulfide (NaHS) in most of the operations in by-product molybdenum flotation comes with safety concerns and, in some instances, a high reagent cost. Engineered solutions at the v
Apr 19, 2021
-
Physical Limnology Of Existing Mine Pit LakesBy D. D. Runnells, G. A. Doyle
The quality of water in mine pit lakes depends in part on the physical limnology, including such factors as thermal and chemical stratification, turnover and the development of anoxic conditions with
Jan 1, 1998
-
Ventilation of the Northern Mujsky Railway TunnelBy S. G. Gendler
The choice of ventilation schemes in the Northern Mujsky railway tunnel and definition of the nec-essary quantities of air ensuring regulated radiation conditions in the tunnel system has been accompl
Jan 1, 2009
-
Establishing Fire Hazard Criteria In Trolley Haulage Entries: A Twenty Year History Of Trolley Wire-Induced FiresThis United States Bureau of Mines study is based on a review of U.S. mine fire accidents that occurred from 1970 through 1989. Information on these accidents was obtained through investigative report
Jan 1, 1994
-
Developments In Coal Preparation In ChinaBy S. Deming
Coal is China's main source of energy. In 1988, 76.1% of commercial energy consumption was supplied by coal. To provide a rational utilization of its coal resources, China has paid considerable a
Jan 1, 1991
-
Practical Semiautomatic Stope Design And Cutoff Grade Calculation MethodAn incremental-analysis-based stope design and cutoff grade calculation method was developed for an underground metal mine project. Traditional stope design methods are typically very time consuming a
Jan 1, 2012
-
Use Of Mobile Crushing And Conveying To Reduce Production Costs At Foster Yeoman Limited's Torr Works Quarry Somerset, England, United KingdomBy Kurt M. Larson
Future haulage cost projections led Foster Yeoman Limited into developing a fully mobile crushing and conveying system at its Torr Works quarry in Somerset, England. The purpose-built system has an ef
Jan 1, 1986
-
Virtual Master Rings—Replacing a Tradition - RETC2023By Dieter Loh, Mathias Knoll, Florian Werres
When a new tunnelling project starts, it has been a vital tradition for decades to cast and erect master rings horizontally on a flat surface to demonstrate the compliance with dimensional tolerances.
Jun 13, 2023
-
Connectionist Approach For Modeling The Dry Roll Magnetic SeparatorMagnetic separation is an age-old technique for mineral beneficiation operations. The existing mathematical models for magnetic separators are quite complicated, and it is very difficult to measure th
Jan 1, 2009
-
Can We Mine Yet? Criteria for Grouting Completion in Tunnel Headings - NAT2022By Adam Bedell, Jack Raymer, Brad Crenshaw
Tunnel contracts often include provisions for pre-excavation probing and grouting for areas ahead of the tunnel heading. If grouting triggers are met, tunneling stops, and grouting is performed. There
Dec 1, 2022
-
A Study Of The Impact Of Price Uncertainty To Mining Project ValuationBy M. Zhang, M. Menabde, R. Middleton
Whilst mine planners almost universally assume deterministic forward commodity prices when undertaking valuations of mining projects, historical data well demonstrates that those prices are quite vola
Jan 1, 2007
-
A Comparison Of Geochemical Exploration Techniques In The Carolina Slate BeltBy P. Geoffrey Feiss
The Piedmont province of the southern Appalachians is becoming the focus of interest for many exploration geologists. In the past, only those deposits with significant surface exposure have been explo
Jan 1, 1977
-
Monitoring Used as an Alarm System in TunnelingBy M. Perolo, A. Contini, E. Ramelli, G. Borgonovo, L. Locatelli
This paper presents the ground settlement monitoring system used during the construction of two tunnels bored by two EPB TBMs, beneath the existing and active railway embankment in Bologna (Italy). Th
Jan 1, 2007
-
Inertization as Means for Reducing Down Time and the Explosion Risk in Cases of Spontaneous CombustionBy Walter Hermülheim, Klaus-Dieter Beck
In German hardcoal mining approximately 1 or 2 cases of spontaneous combustion are recorded per 10 million tonnes of saleable output. In approximately every 20th spontaneous combustion case, CH, is ig
Jan 1, 1997
-
Investigation And Modeling Of Longwall Face-To-Face TransfersBy E. Topuz, C. Patrick
Longwall face-to-face transfers can cost more than $100 per minute in lost production potential and $100,000 for personnel and supplies. Such high costs make extensive planning and control of the tran
Jan 1, 1994
-
Pre-Failure Pillar YieldingBy J. F. T. Agapito, R. R. Goodrich
Yield pillars have been used for many years to help reduce stresses near mine openings and improve roof and floor stability. A yield pillar is often defined as a pillar that fails but retains residual
Jan 1, 2001