  • DFI
    Ground Improvement By Means Of Stabilising Columns

    By Georg Breitsprecher

    The technique of Stabilising Columns (product names are for example "Stabilisierungssaulen" (STS) or "Coplan Stabilisierungs-verfahren" (CSV)) is gradually becoming well accepted for ground improvemen

    Jan 1, 2006

  • DFI
    Seasonal Strain Distributions In Full-Scale Energy Foundations

    By John S. McCartney

    This paper focuses on the seasonal thermo-mechanical response of two energy foundations installed at the new Denver Housing Authority Senior Living Facility in Denver, Colorado. The two drilled shaft

  • DFI
    Meadowlands Megaproject: 9,000 Piles and Counting

    By Ronald D. Boyer

    "Early in the design stage of Meadowlands Xanadu, the client’s project director informed me that “after construction, nobody is going to come to Xanadu to see the foundations.” My response was, “Well,

    Jan 1, 2009

  • DFI
    The Effects Of A Direct Electrical Current On The a Value Of Metallic Piles In Clay - Synopsis

    By Stephen T. Bloomer

    The application of a direct current electrical potential between a metallic pile and a fine grained soil results in an almost instantaneous change in the magnitude of the forces acting on the pile.

    Jan 1, 1996

  • DFI
    Geosetta: Unearthing Geotechnical Data for the Benefit of All

    By Ross Cutts

    As a public servant geotechnical engineer, I observed how costly and valuable geotechnical field explorations are to the success of every project. Often however, the field exploration is a long and co

    Nov 1, 2023

  • DFI
    Design Of Drilled Shaft Supported Mat Moscow Towers

    By Issa S. Oweis

    Two Towers are currently under construction in Central Moscow in the Russian Federation. Building A is a 96 story tower and Building B is a 65 story tower. The columns in both structures bear on a t

    Jan 1, 2007

  • DFI
    Underwater Concrete In Drilled Shafts: The Key Issues And Case Histories

    By Sam X. Yao

    In construction of drilled shafts under water, placing concrete in the shafts is technically demanding and involves complex construction logistics. Past construction experience has demonstrated that h

    Jan 1, 2013

  • DFI
    Pile Driving Equipment ? The Right Tool For The Job - "How To Avoid First Day 'Down Time' Blues"

    By R. Paul De Bruyn

    A. Crane Check List -- Make -- Model -- Year of Manufacture -- Where is load chart? Is it for this crane? -- Boom style and length -- Boom tip drawing (sketch) for fixed lead connection.

    Jan 1, 1990

  • DFI
    Design Of Bearing Plates For Anchors In Geo-Application

    By Andrew Baxter

    This paper focuses on the design of steel bearing plates to transfer load from tiebacks and tiedowns to a concrete mass. It lists and describes the various available procedures for design of bearing p

  • DFI
    A Seismic Construction Of Piling Head ? Synopsis

    By K. Oshima

    In Japan, earthquakes are experienced frequently. Many buildings and structures in Japan are supported on pile foundations. For these pile foundations, the joint section between the piles and footing

    Jan 1, 2010

  • DFI
    Design And Construction Of Open Cell Sheet Pile® Abutments Under An Existing Bridge

    By Dempsey S. Thieman

    The Kuparuk River Central Channel Bridge on the North Slope of Alaska provides critical access for oilfield service vehicles in the largest oilfield in the United States. The original sloped spill-th

    Jan 1, 2008

  • DFI
    Segmented Prestressed Concrete Piles For Coastal Environments ? Synopsis

    By S. Ahmed

    Critical factors of selection, fabrication, installation, and splicing of prestressed concrete piles are discussed based on experiences with coastal subsurface conditions of the United States of Ameri

    Jan 1, 2010

  • DFI
    Composite Foundations For Uplift And Compression In Soft Soils And Swampy Terrain ? Synopsis

    By H. S. Radhakrishna

    Foundations supporting power transmission and communications towers are subjected to both compression and uplift loads, often of a cyclic nature. Some novel foundations, combining the beneficial featu

    Jan 1, 2010

  • DFI
    Sustainability Simply Makes Sense

    By Gerald Verbeek

    There are certain concepts that seem to invite responses from some, including some in the foundation industry and even some within DFI, that are at best surprising. Business owners and their employees

    Nov 1, 2022

  • DFI
    Settlement Monitoring Of A Building Underpinned With Micropiles And Soil Nails

    By Bill Zietlow

    A micropile and soil nail underpinning system was installed to support a building immediately adjacent to a 25-ft deep excavation in downtown Salt Lake City, Utah. Both the building and the underpinn

    Jan 1, 2008

  • DFI
    Dynamic Load Testing Of Augered Cast-In-Place Piles

    By Garland Likins

    High strain PDA testing has become common for verification of capacity of both driven and bored piles. It is equally applicable to Augered-Cast-in-Place (ACIP) Piles. It also evaluates other aspects o

    Jan 1, 2000

  • DFI
    Novel Methods Of Restraining Embedded Retaining Walls

    By Abid Adekunte

    Traditionally, designers and contractors provide additional external supports to retaining walls through the use of tie-back anchors or braces. Both approaches are known to have their shortcomings; br

    Jan 1, 2010

  • DFI
    Laboratory Validation Of In-Situ Tests - 1. Introduction

    This paper summarizes seven years of Italian ex­perience with the use of large calibration chambers for the calibration, under closely controlled stress and strain conditions, of some in situ testing

    Jan 1, 1987

  • DFI
    A Case Study In Hand-Dug Caissons ? Synopsis

    Caissons hand dug to a depth of about 100 feet were used to underpin three important structures at an industrial site in the State of Utah. The caisson shafts extended through 30 to 40 feet of coarse,

    Jan 1, 2010

  • DFI
    Errata (5268ac87-18a9-458e-b334-4f72060324e3)

    Volume 1 pages 665-671 Title should read as Dynamic pile testing of H-piles at HDB sites J.Wei, Y. S. Heng, C. S. Lok, M. K.Chong Housing and Development Board, Singapore 'tons'

    Jan 1, 1994