    A Comparative Study on Behavior of Bucket Pile in Sand According to Installation Methods

    By Jinung Do, Sung-Ryul Kim, Juhyung Lee

    "Model tests have been performed to investigate the vertical, horizontal and cone tip resistances of bucket pile embedded in sand by different installation methods; suction force by pump and jacking f

    Jan 1, 2016

  • DFI
    Pile Design And Construction Challenges In Partially Thawed Alaskan Soils

    By John D. Thornley

    Alaskan villages typically store a one-year supply of fuel to reduce significant delivery costs. Alaska Village Electric Cooperative (AVEC), an electric utility cooperative providing power to 51 Alas

  • DFI
    Pile Design and Construction Challenges in Partially Thawed Alaskan Soils (f9ca4371-20bf-4196-a495-4aa1bd15a8c0)

    By John D. Thornley

    Alaskan villages typically store a one-year supply of fuel to reduce significant delivery costs. Alaska Village Electric Cooperative (AVEC), an electric utility cooperative providing power to 51 Alask

    Jan 1, 2017

  • DFI
    The Theory Of The Expansion Of Cavities Applied To Pile Installation ? Synopsis

    By D. A. Ponniah

    The installation of a pile is considered analogous to the expansion of a cylindrical cavity of a diameter equal to that of the pile. Using Vesic's theory of the expansion of cavities the effect o

    Jan 1, 1987

  • DFI
    Deep Soil Mixing Ground Improvement for the U.S. Federal Courthouse in Downtown Los Angeles, California

    By Roberto A. Lopez, Eric Lindquist, Jon Bussiere, Dean Iwasa

    "The new 11-story U.S. Federal Courthouse building in downtown Los Angeles demanded a cost effective foundation system capable of attaining a strict total settlement criterion of 0.5 inches (12 mm) un

    Jan 1, 2015

  • DFI
    Estimation Of Compressibility And Consolidation Characteristics Of Lightly Overconsolidated Soils From In-Situ Time Settlement Plots

    By Lenin T., Madhav M. R., Padmavathi V.

    Use of PVDs and preloading on the ground can significantly reduce the time taken for ground to consolidate. Many soils in situ are lightly overconsolidated, with overconsolidation ratios (OCR) ranging

    Sep 1, 2022

  • DFI
    Full-Scale Tests To Evaluate Lateral Pile Resistance At The Edge Of A Slope

    By Artak D. Mirzoyan

    Pile foundations near the edge of a slope are often required to resist lateral loads. This is particularly important for piles at abutments of bridges. However, very few full-scale tests are availab

    Jan 1, 2007

  • DFI
    Unique Foundation Solution For The Shriners Burns Institute Building Expansion - I. Introduction

    By Edmund Cardoza

    In the spring of 1993, construction began on an ambitious building project in Boston, Massachusetts. The Shriners organization committed to offer state-of-the-art adolescent burn treatment and rehabil

    Jan 1, 1994

  • DFI
    Interpretation of Seismic Response Data from Full Scale Helical Pile Tests

    By A. B. Cerato, M. K. ElSawy, A. Elgamal

    "Helical piles are gaining popularity as foundations for new construction as well as retrofitting option for deficient foundations. More recently, large diameter helical piles are used to support stru

    Jan 1, 2017

  • DFI
    Design and Construction of the Cannelton Hydroelectric Plant Cofferdam and Cut-Off Wall

    By James M. Tantalla, Dwight Metcalf, Roderic A. Ellman Jr.

    "The construction of a new low head hydro-electric plant at the Cannelton Lock and Dam required the design and construction of a cofferdam to accommodate a deep excavation extending approximately 150

    Jan 1, 2016

  • DFI
    Applying Reasonable Quality Control and Verification to Soil Mixing

    By David Miller

    "The biggest concern about using soil mixing is the inability to observe physically the final product, which has led to a lack of confidence about what is in the ground. After all, you can’t see it an

    Jan 1, 2017

  • DFI
    2013 OPA Winner: Wolf Creek Dam Rehabilitation

    By Fabio Santillan, Michael F. Zoccola

    "Wolf Creek Dam and Lake Cum berland in Russell County Kentucky is operated by the United States Army Corps of Engineers (USAGE) Nashville District It is a combination 3,940 ft long (1,200 m) non-zone

    Jan 1, 2013

  • DFI
    The Secret to Dewatering

    By Gregory M. Landry

    "There is an old joke at Moretrench that defines dewatering as “that element of an underground construction project, which, when disregarded, will generate the low bidder.” Sigmund Freud wrote that al

    Jan 1, 2017

  • DFI
    Execution of Pile Installation in Environmentally Challenging Sites

    By Dena Morgan, Emre Biringen

    "Abstract This paper discusses the execution of pile installation and design issues at two environmentally challenging industrial sites in North America. Environmental regulations set constraints on t

    Jan 1, 2014

  • DFI
    Wadi Dayqah Dam Curtain

    By Frank Haehnig, Harald Krenn, Harm-Christoph Claassen

    "The Wadi Dayqah Dam Water Supply Scheme represents one of the most important projects implemented by the Sultanate of Oman to ensure sustainability of water resources. The principal components of the

    Jan 1, 2016

  • DFI
    Caisson Foundations For Mississippi River Bridges In The New Orleans Area (2e66a216-6dc8-4479-804e-25f5836f407e)

    By William B. Conway

    This paper will describe the large caisson pier foundations for four of the bridges crossing the Mississippi River in the New Orleans area; and will discuss some of the unusual problems encountered du

    May 11, 2007

  • DFI
    Brightman Street Bridge Replacement Project (fbb13111-569c-48aa-97e7-9bb48f6ec170)

    By Jeffrey M. Taylor, Arturo Ressi di Cervia

    "Construction of the drilled shafts for the Brightman Street Bridge Replacement Project were not only challenging due to working over the water but were also challenged by changed soil conditions, con

    Jan 1, 2004

  • DFI
    Session 7: Grouting Compaction Grouting For Sinkhole Repair at WAC Bennett Dam

    By James Warner

    Investigations of the sinkhole indicated that the loose, disturbed ground was completely encircled by dense competent core. This confinement substantially increased the effectiveness of the compaction

    Feb 10, 2003

  • DFI
    One Seam At A Time: Interactive Quality Assurance To Identify Coal Seams During Foundation Construction

    By Matthew Runion, Christopher Lawler

    The Aeolus – Jim Bridger Transmission Line Project is located in southern Wyoming, home to some of the largest coal seams in the world. Coal seams present unique challenges to underground construction

  • DFI
    Willow Island Hydroelectric Project: Taming the Ohio River to Create Green Energy

    By James M. Tantalla, Jr. Ellman

    "Construction of the powerhouse for the Willow Island Hydroelectric Project, located at the Willow Island Lock and Dam, required a 120-ft deep temporary excavation inside the limits of a cellular coff

    Jan 1, 2016