Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Laboratory Estimation Of Input Parameters For Simulation Of Long-Term Gas Production Form CoalBy Satya Harpalani
The four most important parameters controlling the flow of gas in coal are the gas content, permeability, diffusion coefficient and cleat characteristics. Estimates of these and, more importantly, a k
Jan 1, 1995
-
Study on Stability Analysis and Treatment of Underground Goaf in Metal Mine - Mining, Metallurgy & Exploration (2023)By Jiawang Hao, Qinglong Zhang, Liang Han, Chuhan Wang, Shenfang Chen, Lan Qiao
The surface collapse and surrounding rock failure caused by goaf instability are the mining disasters that cannot be ignored. It is of great value to evaluate the stability of goaf accurately and trea
Sep 26, 2023
-
A Database Application For Long Term Production Scheduling At LKAB's Kiruna MineBy Mark Kuchta
A new database application for long term production scheduling has been developed for LKAB's Kiruna mine. The scheduler uses a new block data structure whereby the monthly production data for thr
Jan 1, 2002
-
Challenges of Design and Fabrication of Fiber Reinforced Polymer (FRP) Flanges—A Review - SME Annual Meeting 2024By Bruce D. Hebb, Shahin Shadlou
Fiber Reinforced Polymer (FRP) is an excellent material choice for a broad spectrum of corrosive fluids and, in many cases, offers the best value per dollar. FRP Flanges present the greatest design ch
Feb 1, 2024
-
Future Of The Phosphate Industry In The Southeastern United StatesBy J. L. Heaver
All complete plant foods require phosphorus, nitrogen and potassium. And phosphate rock is the primary source for the phosphorus of the inorganic fertilizers. As more and more world food production is
Jan 1, 1978
-
Commodity Agreements In The Elemental Sulfur IndustryBy James M. Barker
No commodity agreements now exist for sulfur and a lack of reference to sulfur commodity agreements exists in the literature. Law (1975) made a passing reference to sulfur as one of a group of commodi
Jan 1, 1985
-
Design and Construction of the NBAQ4 Project— First Urban EPB TBM Tunnel in Metro Manila - RETC2023By Abegail Endraca, Allan Sebastian, Andrew Raine, Allan Patdu
The project involves the construction of a new aqueduct tunnel by an Earth Pressure Balance TBM tunnel for the Novaliches-Balara Aqueduct No 4 (NBAQ4) project in Metro Manila. It comprises a 7.3 km lo
Jun 13, 2023
-
The Application Of Financial Models In Project EvaluationBy James K. Wright
This chapter will discuss the use of financial models as an evaluation tool for various phases of decision making from exploration strategy to the analysis of a producing mine. The text of this ch
Jan 1, 1979
-
Global Resource Utilization And The Global Environment: The Need For Holistic ApproachesBy W. S. Fyfe
The future environment of our planet, with the concept of sustainable development, has moved to centre stage of all future plans for development. This global view is new. It presents great opportuniti
Jan 1, 1990
-
Considerations In Sample Preparation Methods For Cyanide Shake Assay Of Gold: A Case Study Of Laboratory Optimization At The Aurora Partnership -Aurora ProjectBy W. M. Colwell
When it comes to the analysis of gold bearing ore, there are literally dozens of variables that contribute to the final "true value" of a given sample. Initial sample selection, splitting size and met
Jan 1, 1993
-
Technological innovations that capture project value at Peña ColoradaBy R. E. Vivas, J. A. Villa
"Located in the state of Colima, Peña Colorada is one of the largest iron ore operations in Mexico. The project is owned in equal parts by ArcelorMittal and Ternium. Though boasting a production capac
Feb 1, 2017
-
TBM Data and Performance Monitoring on Large Diameter TBM Tunnels Lined with Shotcrete in the Himalayas—A Case Study - RETC2021By Gary Peach, Peter Mason
Planning and estimating progress rates and costs for tunnelling is always best done based on experience and historic precedent. Much precedent is available but the use of data monitoring, data mining
Jun 13, 2021
-
Taking The Guesswork Out Of Equipment Replacement Decisions - SummaryBy J. L. Kearns
The importance of optimizing equipment replacement decisions becomes more critical each year due to the rising costs of buying new equipment versus maintaining old equipment. Replacing equipment when
Jan 1, 1979
-
The Mine Haul Road Optimisation Alliance - An Industry and Academia Collaboration"The Mine Haul Road Optimization Alliance is an Australian industry-academia collaboration which has been developed to support mine haul road operators by fully integrating mine road design research s
Jan 1, 2016
-
The Joint Use Of Metal Ion Hydroxy Complexes And Inorganic Polymers To Depress Pyrite And Ash During Coal FlotationBy D. D. Xu
A novel system for the depression of pyrite and the ash-forming minerals has been developed. A metal ion, including but not restricted to Fe+2, is added to form a hydroxide coating on the pyrite or as
Jan 1, 1994
-
-
Titanium Pigments From Colorado PerovskiteBy J. V. Thompson
The Powderhorn complex as a source of perovskite (calcium titanate) containing about 1.5% rare earths has been examined in several recent feasibility studies. Much promising exploration and process re
Jan 1, 1990
-
Design of Precast Segmental Tunnel Lining for Pawtucket CSO Tunnel Project - NAT2022By Irwan Halim, Seung Han Kim
This paper will describe design of precast segmental tunnel lining for the Pawtucket CSO Tunnel Project in Providence, Rhode Island. The tunnel is 11,700 LF long with 30-foot finished diameter to be c
Dec 1, 2022
-
The Anomalies of the Purple Line Extension, Section 1, Los Angeles - NAT2024By James Corcoran, Richard McLane, Joseph DeMello, Eric Carlson, Hans van de Vrugt
The Los Angeles County Transportation Authority’s Purple Line Extension Phase 1 is a $3.12 billion (USD) design-build, underground heavy rail project, connecting an existing station at Wilshire Boulev
Jun 23, 2024
-
An ad hoc solution to the transition mine problemBy W Medina, G Angulo, A Anani
A current challenge faced by the mining industry is solving the integrated transition mine problem (TMP) that maximizes the net present value (NPV). This study aims to develop an optimization framewor
Jun 25, 2023