A Database Application For Long Term Production Scheduling At LKAB's Kiruna Mine

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 7
- File Size:
- 343 KB
- Publication Date:
- Jan 1, 2002
Abstract
A new database application for long term production scheduling has been developed for LKAB's Kiruna mine. The scheduler uses a new block data structure whereby the monthly production data for three raw ore products are predetermined on a month-by-month basis for each production area that could be mined within the schedule time horizon. The production schedule is created by assigning the starting dates to the each production area subject to various mining operational constraints such that that the monthly deviations for the production targets are minimized. The system is well integrated into the mine's overall computerized mine planning system.
Citation
APA:
(2002) A Database Application For Long Term Production Scheduling At LKAB's Kiruna MineMLA: A Database Application For Long Term Production Scheduling At LKAB's Kiruna Mine. Society for Mining, Metallurgy & Exploration, 2002.