New Insights into Driven Pile Vibrations using Novel Data Management and Visualization ToolsBy Mark Zablocki, Dakarai McCoy
Ground vibrations are an unavoidable effect of driving piles and may pose a risk to nearby infrastructure and the comfort of adjacent occupants. Driven-pile-induced ground vibrations are known to vary
Sep 8, 2021
-
Adjacent Top-Loaded Bi-Directional Test And Conventional Bidirectional Load Test Results – Site IiBy Patrick J. Hannigan, Seth Robertson, Rozbeh B. Moghaddam
The Top-Loaded Bi-Directional Test (―TLBT‖) and the conventional Bi-Directional Load Test (―BDLT‖) are full-scale static load test methods. In both methods, the test loads are applied bi-directionally
Oct 1, 2022
-
Drilled Pier Foundations for Mercedes-Benz StadiumBy Jean Wehbe, Daniel C. Brahana
"The new Mercedes-Benz Stadium (MBS), home of the Atlanta Falcons, is part of a new era of stadium construction in the U.S. These new-age stadiums are larger and have more amenities than their predece
Jan 1, 2016
-
Nicholson In The Neighborhood: Virginia’S North Hill ProjectBy Dominic Ammon, Mark Rothbauer, Paul Landers P. E.
Across the Potomac River from the location of the DFI47 Annual Conference (October 2022), in Alexandria, VA, two large permanent anchored walls with a decorative shotcrete face were recently construct
Oct 1, 2022
-
Design, Installation And Performance Of Earth Retention System To Limit Ground Movements Around Sensitive Structures In Washington, DcBy Douglas R. Hardin, Stanley L. Worst, Joanna Mason
A challenging earth retention project presented itself in Washington, DC in the backyard of the historic House of the Temple (The Scottish Rite of Freemasonry, Supreme Council 33°). Located at 15th St
Oct 1, 2022
-
Design and Construction of the Cannelton Hydroelectric Plant Cofferdam and Cut-Off WallBy James M. Tantalla, Dwight Metcalf, Roderic A. Ellman Jr.
"The construction of a new low head hydro-electric plant at the Cannelton Lock and Dam required the design and construction of a cofferdam to accommodate a deep excavation extending approximately 150
Jan 1, 2016
-
Virtual Imaging Technologies as Decision-Making Tools for Geo- HazardsBy Arpana P. Sabu, Themis Vaxevanis, Sissy Nikolaou, Guillermo Diaz-Fanas
Geo-failures from extreme events (landslides, wild fires, earthquakes, floods, etc.) have increased exponentially in recent years around the world and within the USA. When catastrophic failures occur,
Jan 1, 2019
-
Investigations on the Distress to the Pavements/PQC Slab around Monorail Piers, Wadala, MumbaiBy Unnikrishnan Nair, Sandeep S. Nikam, Sanjay D. Patil, Prabir C. Basu
"Mumbai Metropolitan Region Development Authority (MMRDA) entrusted to implement Monorail Systems in various parts of Mumbai Metropolitan Region (MMR) with the objective to supplement the present tran
Jan 1, 2015
-
Cooperative Effort Overcomes Problems With Pier And Cofferdam Construction Caused By Rock SlopeBy Herbert F. ?Buck? Darling
A bridge replacement project in Rochester, NY, encountered difficulties when it was determined that rock below one pier was sloping downward toward the river at an angle of 42 degrees versus anticipat
Jan 1, 2013
-
Excavation-Induced Movement of Adjacent FoundationsBy Hugo Meggitt, Damian R. Siebert, Wystan Carswell
Excavation-induced ground movements are a critical component in the design and construction of deep excavations in urban settings due to the potential adverse effects on adjacent structures and infras
Jan 1, 2019
-
One Seam At A Time: Interactive Quality Assurance To Identify Coal Seams During Foundation ConstructionBy Matthew Runion, Christopher Lawler
The Aeolus – Jim Bridger Transmission Line Project is located in southern Wyoming, home to some of the largest coal seams in the world. Coal seams present unique challenges to underground construction
-
Innovations and Challenges during Urban Development – Shoring and Foundations of Canada’s Tallest Residential BuildingBy Shawna Munn, Nadir Ansari, Toben Jerry
With ever increasing demands on space in urban environments and smaller available footprints, buildings are being designed to increasing heights to meet the need. This case study discusses the increas
Jan 1, 2019
-
A Ten-Year Perspective of Jet Grouting: Advancements in Applications and TechnologyBy Gary T. Brill
In the presentation, the development and new applications of the jet grouting technique in the North America are briefly introduced at first and followed by the outline and advantages of Jet Grouting.
Feb 10, 2003
-
Block 43: Diverse Technologies in Complex Site ConditionsBy John Kvinsland
"The Block 43 Project is the future home of the Paul Allen Institute for Brain Science located just off the southern shore of Lake Union in Seattle, Wash. The South Lake Union (SLU) district experienc
Jan 1, 2014
-
Alameda Corridor-East: San Gabriel Trench ProjectBy David Peterson, Terry Tucker, Rafael Serrano
"The Alameda Corridor-East (ACE) Construction Authority awarded a $172.6 million contract to Walsh Construction Company (Walsh) for the construction of a 2.2 mi (3.5 km) long grade separation includin
Jan 1, 2017
-
Seepage Barrier Mix Design Development, Installation, and EvaluationBy George W. Little, John Councilman
"The selection, evaluation, and modification of contractor mix designs for self-hardening seepage barriers, completed by the slurry trench excavation method, can be one of the most critical and challe
Jan 1, 2016
-
Westlink Projects – Geotechnical Challenges During The Execution PhaseBy Robert Thurner, Albin Norrman, Sami U. Raja
The West Link is a double track railway project currently under construction in Gothenburg, Sweden. The project includes the construction of 8 kms of track, 6 kms of which will be in tunnels. Beside s
May 1, 2022
-
Soil Improvement Using Gravel-Sand Columns for a Highway Project in GermanyBy Schmitz Stefan, Stephan Jee-Sun
"Due to the reunion of Western and Eastern Germany in the late 80’s, a multitude of infrastructure projects had to be executed. A good portion of these projects required improvement of the motorway sy
Jan 1, 2015
-
Transformation From Classical 2D To Digital 3D Thinking Process In The Design Of Geotechnical Structures: Perspective Of A Geotechnical ConsultantBy Harald Vogel, Johannes Lachenski, Friedemann Koetzel, Sebastian Schnell
In this paper, a digital subsoil approach, a work-in-progress, will be presented describing the transformation from a classical 2D to digital 3D thinking process in the design of geotechnical structur
May 1, 2022
-
Willow Island Hydroelectric Project: Taming the Ohio River to Create Green EnergyBy James M. Tantalla, Jr. Ellman
"Construction of the powerhouse for the Willow Island Hydroelectric Project, located at the Willow Island Lock and Dam, required a 120-ft deep temporary excavation inside the limits of a cellular coff