Hudson’s Revitalization: The Use of Robotics in the Work Place
By Dave P. DeClerck
Hardman Construction was faced with the challenge of completing a large earth retention project on a constricted downtown Detroit site, while maintaining a safe and productive worksite. To do so, new
Jan 1, 2019
-
The Use of Vibratory Driving of Foundation Piles for Offshore Applications - State of the Practice
By Nicolas Moscoso, Gerald Verbeek, Marcel Bielefeld, Rob van Dorp
Upon recently, most offshore foundations were based on a number of driven piles that were installed with an impact hammer. With the increase in offshore windfarms two major developments have occurred:
Jan 1, 2019
-
DFI Collaborates on Risk-Based Panels
By Derrick Dasenbrock
Two DFI committees independently organized two complimentary panel sessions for the recent American Society of Civil Engineers' (ASCE) Geo- Risk 2023 "Advances in Theory and Innovation in Practice" Co
Sep 1, 2023
-
The Berkeley Art Museum: Using Deep Foundations to Repurpose a Historical Building
By Timothy Nelson, Simon Burnworth
"The University of California’s new Berkeley Art Museum and Pacific Film Archive will showcase a collection of art and film in a facility that pairs an existing 1930s-era printing press facility with
Jan 1, 2017
-
Quality Control of Pile Installation Using Digital Pile Penetration and Rebound Monitoring System
By Hee-suk Yun, Dae-jin Hwang, Jeong-woo Seok, Myoung-mo Kim
"In this paper, the accuracy of the data measured by a newly developed displacement measuring system, DPRMs (Digital Pile Penetration and Rebound Monitoring system) and its applicability as a quality
Jan 1, 2005
-
Environmental Considerations Regarding The Danish Landworks For The Fixed Link Across The Øresund - Synopsis
By Uwe Hess
For the Danish landworks for the coming fixed link between Denmark and Sweden across the Øresund the focus has been on the environmental aspects of the construction and operation of the facilities. Th
Jan 1, 1996
-
Metro Sao Paulo, Line 5, Five Shaft Diaphragm Wall for Brooklin Station
By Dario Libano, Franz-Werner Gerressen
"Diaphragm walls are known as underground structural elements commonly used for retention systems and permanent foundation walls or elements. Of course they can also be used as deep groundwater barrie
Jan 1, 2017
-
St. Croix Bridge, Minnesota: The Influence of Construction on the Axial Resistance of Drilled Shaft Foundations in Weak Sandstone
By William G. Ryan, David S. Graham, Dan A. Brown, Rich A. Lamb, Paul J. Axtell
"The St. Croix River Crossing project on the Minnesota-Wisconsin border has been in the process of planning and public debate for two decades, with several changes in alignment. During the course of t
Jan 1, 2015
-
Case Study: Feather River West Levee Program Cutoff Walls
By Kyle R. Lackner, Jared P. Williams
"The Sutter Butte Flood Control Agency initiated the Feather River West Levee (FRWL) Program in 2010 to bring 35 miles of levee along the Feather River into compliance with applicable Federal and Stat
Jan 1, 2016
-
Optimization of Drilled Shaft Design for a Highway Bridge in Arizona Using Load Test Results (0a742001-9cf1-441f-b0fc-5890697ef97e)
By John C. Niedzielski, A. Frances Ackerman
The existing US-70 Bridge over the Gila River at Bylas, Arizona is planned to be replaced due to its current poor condition. The replacement bridge is planned to be a 15-span, 1,904-foot (580 meter) l
Jan 1, 2017
-
Effect of Axial Compression on Lateral Pile Response: Laterally Loaded Test Pile Comparison
By David S. Graham, Joseph D. Bailey, Paul J. Axtell, Michael K. Muchard
"Two instrumented test piles were simultaneously subjected to a static lateral load test by jacking the piles apart. One of the piles was loaded in axial compression via kentledge during the lateral l
Jan 1, 2017
-
Characteristics of Strength Development of Fiber-Reinforced and Cement Improved Soft Clay of Shanghai (c152f4a9-990c-402e-baf3-fbbcafc7e905)
By Mu Chen, Ye-Shuang Xu, Dong-Wei Hou, Shui-Long Shen, Huai-Na Wu
"This paper presents a laboratory investigation on the mechanical behaviors of the cement-clay admixture improved by polypropylene fiber. Cement can significantly improve the clay admixture. The fiber
Jan 1, 2015
-
DFI Europe Monitoring and Instrumentation Committee Objectives
By Rob van Dorp
"AbstractThe Monitoring & Instrumentation Committee (MIC) of DFI Europe has the objective to support DFI members in concern of risk management of geotechnical matters, where monitoring and instrumenta
Jan 1, 2014
-
Cooling Water Intake Shafts for the Oak Creek Expansion
By Edward Jacobsen, Patrick J. Lydon
"The ongoing expansion of the Oak Creek Power Plant in Oak Creek, Wisc., includes a tunnel bored in rock that connects to four vertical intake shafts approximately 1.5 miles (2.4 km) offshore in Lake
Jan 1, 2008
-
Micropiles for Seismic Retrofits
By Rob Jameson
"Although seismic retrofit is recognized as a key micropile application, widely-used reference documents do not clearly address design and testing recommendations for micropiles that are loaded primar
Jan 1, 2009
-
Soil Mixing for the Rio Puerto Nuevo Project in San Juan, PR: A Case History
By Filippo Maria Leoni, Wesley Schmutzler, Matteo Bertoni
"Deep Mixing Method (DMM) for the Rio Puerto Nuevo Project (Project) in San Juan was chosen by the Corps of Engineers to improve the soils adjacent to a 92 inch ID forced sewer main relocation and to
Jan 1, 2015
-
Load Tests On Large Diameter Bored Piles In Cemented Sands
By Nabil F. Ismael
Load tests were carried out to examine the ultimate bearing capacity of short, large diameter bored piles in connection with the construction of a multistory building on the Arabian Gulf in Kuwait.
-
Deep-Sea Quay Wall for Offshore Wind Energy Terminal on Maasvlakte 2 Rotterdam – NL
By Patrick van der Schaaf
"During 2016, foundation piling works were completed to allow for the construction of a production and storage/handling terminal in Rotterdam. It is there that steel foundations will be produced for o
Jan 1, 1900
-
High-Capacity Driven-Pile Foundation for a 33-Story High-Rise in Milwaukee, Wisconsin, USA
By Patrick J. Hannigan, William H. Walton, Ryan C. Rusk, Van E. Komurka
"The project consists of a 33-story building with two levels of below-grade parking across the entire building footprint. Timely and cooperative teamwork among the owner/developer, geotechnical engine
Jan 1, 2017
-
Sonic Drilling and Sensitive Infrastructure
By George Burnhart
"Sonic drilling is a relatively new technology even though it has been in development since the late 1940s. It was initially funded by the U.S. petroleum industry and then, in the late 40s, Russian sc
Jan 1, 2008