Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Construction Considerations For Ground Modification Projects ? SynopsisBy J. P. Welsh
Ground Modification construction is rapidly evolving in the United States. An assessment of the construction status of Ground Modification methods with their dates of introduction and general acceptan
Jan 1, 2010
-
Mini-Piling And Soil Anchors ? IntroductionBy Martin C. Jones
This paper outlines the development of small diameter grouted piling, to deal with foundation problems in difficult soils conditions and in very restricted access areas. A number of applications are o
Jan 1, 1987
-
Design Parameter For Jacked PileBy Sugie Prawono
Jacked pile is the only piling system in which the load capacity of the pile, at any penetration depth, could be monitored directly during its installation process. Each installed pile could have a gr
Jan 1, 1999
-
List Of ExhibitorsA technical exhibition was held in conjunction with the 4th DFI International Conference on Piling and Deep Foundations, Stresa. The exhibition was located in the ground floor of the Conference Hall.
Jan 1, 1994
-
Capitol Area East End Complex Blocks 171 Through 174 Sacramento, California: A Case History Involving The Application Of APGD And APG Piling Methods ? IntroductionBy Brian R. Zuckerman
The Capitol Area East End Complex is currently being constructed under contract with the State of California Department of General Services on two sites adjacent to the grounds of the California State
Jan 1, 2002
-
Static Alternating Cyclic Horizontal Load Tests On Driven Steel Pipe Piles Of Foundations For Highway BridgesBy Kouichi Tomisawa
Two bridges were constructed for extension work of Central Hokkaido Connection Road in 2005 at two different sites. Pile group foundations were employed for the foundations of abutments of the two bri
Jan 1, 2006
-
Load Testing Of Steel Sheet Piling Driven With A Vibratory HammerBy Drew Floyd
Five full-scale pile load tests were performed on pairs of PZ-22 sheet piles installed with a vibratory pile driving hammer. The sheet piling was installed in several locations in soil generally consi
Jan 1, 1989
-
Soil-Cement Pile Foundations For A Large Storage Tank And Retaining Wall - Case History - SummaryBy Roy A. Bell
A 200-foot diameter, 72-foot high petroleum storage tank was built in a hillside ravine where a portion of the site contained soft clay fill. Soil-cement piles, 40 inches in diameter and up to 38 feet
Jan 1, 1997
-
Load Test On A Model Pile Driven Into Sand ? SummaryBy A. Mazzucato
This paper presents the experimental results of driving and load tests on an instrumented pile driven into a test pit filled with fine homogeneous sand.
Jan 1, 2010
-
The Design And Formation Of Bored Displacement Piles - A United Kingdom PerspectiveBy David J. Baxter
Use of bored displacement piles has experienced significant growth in the UK piling market sector, largely due to their environmental advantages over other piling methods and through cost benefits. Bo
Jan 1, 2006
-
Earth Retention Using Augered Cast-In-Place Piles - A. Introduction - 1. ApplicationsBy William S. Heckman
a. When to use: high surcharges, vertical capacity required, limit noise and eliminate vibrations, low headroom, eliminate vibration induced settlements. b. Advantages: eliminates impact noise and
Jan 1, 1997
-
Plastoelastic Analysis Of Bearing Capacity For Soil AnchorBy Hui Yongning
This paper presents a simulating test of constitutive relation of soil anchor in laboratory and puts forward a new plastoelastic mechanical model, on which a new calculating formula of elastic and pla
Jan 1, 1991
-
In Luxembourg-Walferdange 2 Problems Concerning The Geodynamic Motions Of The Planet Earth Are Studied Since 1963 - A) The Earth TidesBy experience we know about the natural event of ocean-tides. In geophysics we say that the earth-tides phenomenon is the elastico-viscous response of the earth's body to the attraction potential
Jan 1, 1987
-
I-470 Mine RemediationBy Sheryl D. Gallagher
The project consisted of filling an abandoned underground limestone mine to facilitate construction of a new entrance ramp to I-470 in Lee?s Summit, Missouri. Due to collapse of mined areas near the
Jan 1, 2009
-
A Theoretical Study Of Underpinning Of Rigid Circular Foundations By Piles ? SynopsisBy M. Makarchian
Existing buildings sometimes experience excessive settlement under their design loads, or due to increased foundation loading, if a change of building use is required. One of the oldest and widely num
Jan 1, 1996
-
The Synergy Between Theory And Practice In Geo-EngineeringBy Bas R. Hemmen
GeoBrain is a facility at GeoDelft with the purpose to provide society with all relevant geo-engineering knowledge and experience in a structured way. On the basis of the available knowledge and exper
Jan 1, 2006
-
Water Tightness Of Diaphragm WallsBy Radianto Elprama
For the realisation of the underground railway line RandstadRail in the city area of Rotterdam a bored tunnel is under construction. Diaphragm walls up to a depth of about 40 m were used to construct
Jan 1, 2006
-
Applicability of Wet Grab Sampling to Quality Assurance of Deep Mixing MethodBy Masaki Kitazume
"Abstract The wet type and dry type of deep mixing methods have been developed and widely applied for on-land and marine constructions in Japan. The quality assurance (QA) of the methods has been usua
Jan 1, 2014
-
Design Of Foundation On Granular Piles For Five Storeyed Esidential Complex At Nazira, Assam - SynopsisBy B. N. Hira
A multistoreyed residential complex was at the penultimate stage of construction by ONGC at Nazira, Assam. The site was situated at high earthquake zone. The subsoil was very weak and contained soft t
Jan 1, 1996
-
Application Of Neurofuzzy Approach To Estimate Duration And Evaluate Delay For Diaphragm Wall And Barrette ConstructionBy Thoedtida Thipparat
The diaphragm walls and barrettes are very important to the constructions of multi-storeyed buildings, elevated expressways, subway railway stations, etc. Uncertainties particularly increase in accord
Jan 1, 2006