Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
History Of Chicago Foundation Systems & Underground Construction ? SummaryBy Theodore R. Maynard
The history of foundation engineering in Chicago is a tale of innovation, made necessary in order to keep pace with structural technology which allowed taller buildings with heavier bearing loads, to
Jan 1, 1991
-
Effective Analysis Of Soil-Pile Interaction Under Dynamic LoadsBy Inn-Joon Park
Major problems associated predicting soil-structure interaction behavior are based on the fact that soil is neither homogeneous nor elastic and soil properties are spatially variable. There also exist
Jan 1, 2002
-
The Deep Soil Mixing for the Galataport Project in Istanbul, Turkey.By Federico Pagliacci, Marco Chiarabelli, Salvatore Miranda
The paper describes the adopted technologies and performance controls related to a special geotechnical engineering solution provided within the scope of the Galataport Project, in Istanbul, Turkey. T
Jan 1, 2018
-
Quality Control Of Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Piles ? IntroductionBy Rudolph P. Frizzi
Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is
Jan 1, 2003
-
Underpass Support Using Secant Pile Walls And Cement Deep Soil Mix Bottom SealBy Carole L. B. Mitchell
The South 180th Street Grade Separation underpass in Tukwila and Renton, Washington, USA, permits vehicular traffic to pass beneath Burlington Northern Santa Fe and Union Pacific railroad tracks. The
Jan 1, 2004
-
Evaluation Of Design Methods For Tieback Retaining Walls In Seattle - IntroductionBy John P. Turner
The behavior of tieback retaining walls depends on many factors, including soil properties, groundwater conditions, construction sequence, spacing and stiffness of tiebacks and soldier piles, tieback
Jan 1, 1990
-
Treated Round Wood Piling SpecificationsBy James S. Graham
Specifications for treated round wood piling are presented for the engineers consideration. Included in the text are background information, technical committees, Chellis, quality, treatment, static a
Jan 1, 1992
-
Gallery Towers, Melbourne: Successful Approach To Difficult Piling Contract ManagementBy Mario Aiezza
This paper outlines the results of a relationship developed during the design and construction of the foundations for the Gallery Towers project in Melbourne. Both the builder and the piling contracto
Jan 1, 2002
-
Lessons Learned From Installation Of ACIP Piles In Various Geologic Settings Of The NYC RegionBy Frank J. Arland
Augered-Cast-in-Place piles have been used successfully for many deep foundation applications. The four case studies discussed herein describe ACIP pile projects where problems developed during ACIP p
Jan 1, 2004
-
Non-Destructive Testing, Evaluation And Optimization Of Existing Deep Foundations For Re-Use Along The East CoastBy Matthew E. Meyer
Renovation, rehabilitation, restoration and expansion of existing residential, retail, commercial, hospital facilities and historic structures requires assessment and evaluation of foundation systems
Jan 1, 2011
-
Downtown Seattle Transit Project - International District StationBy Richard K. Sandaas
Start Date: April 4, 1988 Completion Date: Dec. 29, 1989 Contractor: SCI Contractors Past and present transportation centers will come together at International District Station, located at th
Jan 1, 1990
-
Statnamic Load Testing; Overview And Case Histories Of Augered Cast-In-Place PilesBy Mike Muchard
Augered cast-in-place piles are one of the most cost effective deep foundation options available to designers but have been largely underutilized due to skepticism associated with quality assurance an
Jan 1, 2000
-
Current State Of Practice Of Corrision Protective Systems For Tierods And Tiebacks Used In Marine Applications ? IntroductionBy Thomas A. Printz
The wide use of carbon steel in construction and engineering projects makes this engineering material accountable for approximately 85% of the total annual steel production worldwide. Despite the lac
Jan 1, 2013
-
The Application Of The Caisson In ChinaBy Chen Xizhe
The caisson is adapted to the foundation of concentrated heavy building. As there are the flowing sand, boulder or cobble and other serious obstruction, the open caisson can't sink, the caisson c
Jan 1, 1991
-
Regulations Of Construction VibrationsBy Mark R. Svinkin
Regulations are needed to keep construction vibrations in tolerable limits. The existing regulations were developed for low-rise residential structures, but they are incorrectly used for different sup
Jan 1, 2006
-
Installation Of Augered Cast-In-Place Piles - Equipment? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 2003
-
Use Of And Design Parameters For High Capacity Foundation Elements In Boston Bedrock - IntroductionBy Mark X. Haley
Foundation design and construction in Boston has changed dramatically during the past 10 years. Prior to 1985, the primary foundation element in Boston, where deep foundations are required, was driven
Jan 1, 1994
-
Construction Of A Deep Slurry Wall In A Restricted City Centre Site Using A Hydraulic Grab And Rotator System.By P. M. Wiltcher
The construction of a deep structural slurry wall in a restricted city centre location is always a challenging prospect. However, when the city is London and the site is bounded on two sides by high
Jan 1, 2006
-
Deep Mixing Method: An International Overview Of Technology, Testing And ProductBy D. A. Bruce
The Deep Mixing Method is a very valuable tool for combating problems related to in situ soil treatment, improvement, and retention. Many different variations are used throughout the world, and there
Jan 1, 2001
-
Application of Multiple Excavation Support Systems in Brown Field ProjectBy Shuvranshu K. Rout, Anup K. Mandal, Biswajit Das, Manos De
"To adopt new technology advancement in Steel Plant, there is a requirement of shifting of operation process from Coke Wet Quenching (CWQ) to Coke Dry Quenching (CDQ). New CDQ chamber foundation with
Jan 1, 2017