Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Improving Machinery Reliability Through Condition Based MaintenanceBy Alan D. Akerman
This paper describes the significant advantages and improvements in operational availability, reduced breakdowns, and overall cost reductions that can be achieved through the application of a Reliabil
May 1, 2002
-
Low-Grade Cu-Au Deposits: Predicting the Relationship between Copper and Gold Performance in Flotation and the Potential for Gravity Gold RecoveryBy Jan E. Nesset, Phillip J. Mackey, Joo Y. Kim, Giovanni Di Prisco, André R. Laplante
Understanding the appropriate gold recovery to associate with copper recovery when assessing laboratory testing on porphyry deposits is often complicated by several factors including variable and/or c
Jan 1, 2005
-
Cyclone Modelling - Case StudiesBy R. N. Murarka
"Hydrocyclone modelling and selection procedure is illustrated. Computerized procedure for hydrocyclone cut size determination for grinding and non-grinding applications is described.A standard proced
Jan 1, 1992
-
Improvements in Gravity and Overall Gold Recovery at NVI Mining Ltd. Myra Falls OperationBy Linda Duncan, Trevor Yeomans, Chris Potorieko, Michael Fullam
"NVI Mining’s Myra Falls Operation is a 4,000 mtpd copper/zinc flotation circuit with by product gold of ~28,000 ounces per year. Gold recovery has historically averaged 40-55%, however, a portion of
Jan 1, 2006
-
Seismic source parameters used to monitor rockmass response at Brunswick MineBy B. Simser
Noranda?s Brunswick mine is a 10 000 t/d producer of lead-zinc-copper-silver ore that has been in operation since 1964. Mining of this multiple lens deposit is primarily by blasthole stoping technique
May 1, 2004
-
Seismic source parameters used to monitor rockmass response at Brunswick mine (5a673da7-13e1-42d4-880a-c4441be71d76)By B. Simser, V. Falmagne
"Noranda’s Brunswick mine is a 10 000 t/d producer of lead-zinc-copper-silver ore that has been in operation since 1964. Mining of this multiple lens deposit is primarily by blasthole stoping techniqu
Jan 1, 2004
-
Island Copper Mine Milling for Copper and MolybdenumBy Chris Brown
"The Island Copper plant was designed and built by Fluor Utah Ltd, in conjunction with Utah design staff, Originally designed to treat 33,000 tons/day (t/d) of ore, the current average milling capabil
Jan 1, 1975
-
Paste Backfill Strength Behaviour Using Different Binding Agents and Binder CombinationsBy Philip A. Dirige
This paper presents the variability of responses of paste backfill specimens that have been prepared with varying binding agent and binder combinations, when subjected to uniaxial compressive strength
May 1, 2006
-
A Technique for Rapid Compass-and-Pace Surveying of StreamsBy P. C. Parsons, G. C. Milligan
"IN FIELD WORK in the Cape Breton Highlands, which are heavily covered with vegetation, it is necessary to run traverses along the valleys of small brooks. We encountered difficulty in closing such tr
Jan 1, 1971
-
Vibration analysis of mining shovelsBy P. N. Saavedra, E. A. Salamanca
"The maintenance strategies in the mining industry are changing from operative and periodic inspection strategies to a condition-based, predictive maintenance strategy centred in vibration analysis pl
Jan 1, 2002
-
Environmental Planning in Mine Waste Management - The Huckleberry Mines ExperienceBy Henri F. Letient
At the 25th Annual B.C. Mine Reclamation Symposium in September 2001, Huckleberry Mines Limited received the Jake MacDonald Reclamation Award for its exemplary mine waste management plan, conceived to
May 1, 2002
-
The Accident Prevention Program at Consolidated Discovery Yellowknife Mines LimitedBy Ralf M. Kleine
THE property of Consolidated 1 Discovery Yellowknife Mines Limited, (Figure I) is situated in the Northwest Territories, approximately 50 air miles north of the town of Yellowknife. The mine is reache
Jan 1, 1962
-
Three Stage of Crushing an Alternative to Sag CircuitsBy Christian Ottergren
"Modern crushers offer double the capacity and performance of classic models. In some cases crushers are replacing SAG circuits, the advantages being smaller investment and lower operating costs. Is T
Jan 1, 2004
-
Effects of Multi Heat-Stable Salts on Corrosion in Amine Treating PlantsBy P. Srinivasan
Corrosion is a major operational problem in amine-treating plants causing significant expenditures each year, Corrosion may become more severe when the amine plants contain process contaminants ? name
Jan 1, 2005
-
The Optical Properties of Mixed Au and Pt Nanoparticle ColloidsBy Daven N. Compton
The optical properties of Au nanoparticles have been known for some time, with both Au colloids and Au nanoparticles embedded in glasses having been extensively studied. In this study, Pt nanoparticle
Oct 1, 2003
-
A mine operator's implementation of geostatisticsBy G. H. Blackwell, N. I. Norrish
"At most operating mines, geostatistical are reserve estimation methods have been implemented by head office or consulting groups . With recent advances in small computer technology it is now possible
Jan 1, 1987
-
The post-failure characteristics of rockBy T. G. Joseph, K. Barron
A strain-softening constitutive relationship is introduced that describes the post-failure stress-strain curve for rock regardless of whether the rock is intact or broken. The core of this relationshi
Jan 1, 2003
-
Using Rock Physics for Constructing Synthetic Sonic LogsBy I. O. Ojala
Detailed knowledge of velocity-depth trends is essential for constructing well-to seismic ties, determining background velocity and generating synthetic seismic traces for interpreting seismic amplitu
May 1, 2009
-
Dust Control at the Cassiar Asbestos Primary Crushing PlantBy F. J. MacPherson, A. C. Caron
"Cassiar Asbestos Corporation Limited is at present B,C.'s only asbestos mining company, and has been actively engaged in the management and operation of the Cassiar Mine since the early 1950's. The C
Jan 1, 1976
-
Rock Pass Operational Problems in Quebec Underground MinesBy Jean-François Lessard
The performance of rock pass systems has a significant contribution to the economics of underground mines. Operational concerns include hang-ups due to arching of material, blockage and degradation of
May 1, 2002