Dilution Control While Maximizing Fragmentation in Gold Mines with the Use of Tracking Microchips Benjamin CebrianBy David Flores, Benjamin Cebrian
This paper describes extensive engineering approaches to achieve both dilution control while not hurting fragmentation in the very hard, massive ore sections of a mine case study. Ore Tracker microchi
Feb 1, 2020
-
The Mitigation Effects of a Barrier Wall on Blast Wave PressuresBy Nathan Rouse
This blast mitigation study examined the effects of a barrier wall on explosively driven pressures. This area of blast mitigation is of interest due to the many different applications involved in prot
Jan 1, 2012
-
Precision Presplitting: Explosive Load Variations with SpacingBy Calvin Konya, Anthony Konya
Presplitting is a form of blasting that when executed properly will create a smooth wall that will minimize secondary conditioning. In recent years, presplitting has become a popular technique to be u
Jan 1, 2017
-
Improving the Amount of Material Cast at Highvale Mine Using Electronic DetonatorsBy Robert Slivinski, Kyle Hobbs, Michael Stern, John Willox, Brad Jewson
Prairie Mines & Royalty Ltd. produces over 12 million tonnes annually of thermal coal for TransAlta’s Sundance and Keephills power stations from the Highvale Mine. This opencast mine is next to a lake
Jan 1, 2008
-
Merging an Open Pit with an Underground MineBy Charles L. Greening
MARTIN MARIETTA CEMENT at Martinsburg, West Virginia, has been and presently is engaged in coupling present open pit with old underground workings. Various drilling and blasting techniques have been i
Jan 1, 1982
-
Optimized Drilling Through AutomationBy Eric C. Gerst
"In this current era of soft commodity and coal prices the mining industry is turning towards optimizingall levels of production to reduce operating costs. Part of this trend includes the automation o
Jan 1, 2017
-
Close-In Construction Blasting -- Impacts and Mitigation MeasuresBy Andrew F. McKown
This paper will discuss the mechanisms of potential damage from close-in construction blasting, concentrating on two mechanisms: elastic ground vibrations and non-elastic (permanent) ground deformatio
Jan 1, 1991
-
Blasting For A Lokotrack SystemBy Roger L. Keller
Cautious, productive blasting is employed in the adaptation of a mobile crushing system extending into a highway through cut. In Hong Kong's final chapter of infrastructure development in preparation
Jan 1, 1998
-
Precision Blasting in the Nation's Captial: A Case History Showing the Use of a Seismograph as a Tool to Control Blasting VariablesBy Bill Rose, Alan Foster
This paper will outline blasting as undertaken at the Flour Mill project in the Georgetown area of Washington, D.C. It will discuss the vibration and blasting problems found in blasting in high risk a
Jan 1, 1979
-
Testing Environmental Guidelines for Subaqueous Blasting OperationsBy A Lance McAnuff, Andrew Curic
Until relatively recently, underwater blasting operations for channel deepening, dock construction and pipeline crossings of lakes, rivers and streams were conducted without much regard for the potent
Jan 1, 1997
-
Production Drilling and Blasting Techniques at the Escalante Silver MineBy Eddie L. Catbagan
The Escalante silver-bearing deposit, consisting of a relatively wide and continuous quartz vein, contains openings ranging from minute to a few feet wide on the footwall and hanging wall. These openi
Jan 1, 1983
-
Optimized and Calibrated Migration to HXNBlast at Minera San CristóbalBy Javier Castaneda, Luis Zozaya, Noel Huarachi, María Rocha
The objective of the project was to implement and calibrate drill and blast models supported by Geotechnical and Geological models as well as the mine and operation characteristics. The models would t
Feb 1, 2020
-
Single Round Blasting of 10 Food Diameter x 65 Foot Depth Emplacement Shaft Collars at the Mercury, Nevada Test SiteBy Tom Short, Bill Beam
Some of the weapons testing shafts at Mercury, Nevada require depths of 1000ft and diameters of 10 feet. The top 40 feet to 65 feet is drilled, blasted and excavated by Large caisson type augers in or
Jan 1, 1991
-
Deltadet System from Delta CapBy Kevin Dunfield
The Deltadet System is composed of: The Deltadet II electronic Detonator. A Field Terminal to create, modify or simply execute an existing blasting sequence. The radio remote controlled option is comp
Jan 1, 2004
-
Blasting in the Lower Shaft Station of Atomic Energy of Canada Limited's Underground Research LaboratoryBy P A. Lang, J G. Ayotte, R W. Humphries
Atomic Energy of Canada Limited (AECL) has the responsibility for research, and development of technologies, for the safe and permanent disposal of Canada's nuclear fuel wastes. As part of this compre
Jan 1, 1986
-
Improving open-pit blast design through rock hardness estimation and prediction based on Measurement-While-Drilling data: Applications in large copper mines in Chile.By Sebastián Seria, Jorge Álvarez, Diego Cáceres
The capacity to break the rock into adequate size fragments and in a cost-effective way is one of the main challenges in large open pit copper mines in Chile. That capacity is often compromised by the
Jan 26, 2026
-
Use of Corrtex to Measure Explosive Performance and Stem Behavior in Oil Shale Fragmentation TestsBy Gerald G. Schmitt, Richard D. Dick
Continuous Reflectometry for Radius vs Time Experiments (CORRTEX) was used to monitor several conditions of blasts such as the detonation velocity of the explosive column, the functioning of different
Jan 1, 1985
-
Post-Blast Generation of Explosive Gases in Large Diameter Non-Breakthrough Bore HolesBy R W. Bellenie, P N. Blakey
The phenomena of post detonation gases in muckpiles is reasonably well known. It causes the 'rumbling' noises occasionally heard after a blast in open pits or quarries and is thought to occur due to i
Jan 1, 1980
-
Application of Full-Face Round by the Sequential Blasting Machine in Tunnel ExcavationsBy Young-Dong Cho, Han-uk Lim, Bok-Ki Park, Sang-Eun Lee
Many methods and techniques have been developed to reduce ground vibrations. Some of them are an adoption of electric millisecond detonators with a sequential blasting machine and an improvement of in
Jan 1, 1995
-
Safe, Easier, Economican - SEEBy John C. Didlinger
How do you measure the highwall? Why do you even need to know the highwall measurement? Why is it important? The importance of this measurement is to help keep a level floor and to help control vibrat
Jan 1, 1997