Static Alternating Cyclic Horizontal Load Tests On Driven Steel Pipe Piles Of Foundations For Highway BridgesBy Kouichi Tomisawa
Two bridges were constructed for extension work of Central Hokkaido Connection Road in 2005 at two different sites. Pile group foundations were employed for the foundations of abutments of the two bri
Jan 1, 2006
-
Driven Piles In Glacial Deposits Exhibiting Time Dependent CapacityBy Upendra L. Karna
The pile capacity gain with time evaluated and implemented for the construction of the Route 21 Viaduct in Newark, NJ, U.S.A is discussed in this paper. The project consisted of the replacement of mor
Jan 1, 2006
-
Building Response To Construction ActivitiesBy Marco D. Boscardin
Control and mitigation of building response to construction activities are assuming a greater role in design decisions for underground construction. Alternatives for controlling building response have
Jan 1, 2003
-
Managing SOE Construction Risk through Design-Build SystemsBy Rob Jameson
"The demand for commercial and residential construction has continued to evolve across the United States over the last decade. Our markets demand larger, deeper and inherently more complex structures,
Jan 1, 2017
-
Rapid Lateral Load Testing Of Deep FoundationsBy Dan A. Brown
This paper describes a method of conducting rapid lateral loading tests of deep foundations in which the load is applied to the foundation with a time duration of less than one second. For purposes of
Jan 1, 2007
-
Open Well Caissons Of A 1917 Railroad Bridge: How 19th Century Construction Can Influence 21st Century Construction (f1b0a5f2-b1b8-41d4-bbfb-fab6f395e7a0)By Alan D. Fisher
Amtrak made a decision to replace an aging bascule bridge with a vertical lift bridge for their crossing of the Thames River in New London, Connecticut. The new lift bridge occupies the same alignmen
Jan 1, 2008
-
Construction Of A Deep Slurry Wall In A Restricted City Centre Site Using A Hydraulic Grab And Rotator System.By P. M. Wiltcher
The construction of a deep structural slurry wall in a restricted city centre location is always a challenging prospect. However, when the city is London and the site is bounded on two sides by high
Jan 1, 2006
-
Foundations For Light Buildings On Lime/Cement (L/C) Columns ? SummaryBy Per Eriksson
For light buildings on clay, foundations on L/C-columns is in many cases a competitive alternative to piles when the thickness of the clay is moderate (<20 m). The method is applicable for the above m
Jan 1, 2000
-
Auger Pressure Grouted Displacement Piles Installed & Tested On The Margins Of The San Francisco Bay ? Part OneBy Christian Divis
[ ]
Jan 1, 2002
-
Update Of Aashto Standard Specifications For Highway Bridges: Division II--Construction - Preliminary Draft Final Report Vol. II - Specifications And Commentary - Driven Foundation Piles - 4.1 DescriptionThis work shall consist of furnishing and driving foundation piles of the type and dimensions designated on the plans or in the special provisions including cutting off or building up foundation piles
Jan 1, 1989
-
Tapertube ™ PilesBy Alexander Filotti, Stanley Merjan
"Abstract. The paper shows the benefits and accomplishments of this relatively new but established product on the pile foundations market in the United States. The first part of the paper describes ge
Jan 1, 2014
-
Recent Developments In Secant Bored Pile Wall ConstructionBy D. E. Sherwood
Recent developments in high torque hydraulic rotary rigs has lead to the construction of secant bored pile walls by rotary drilling methods in circumstances where earlier methods were difficult and in
Jan 1, 1989
-
Deep Mix-In-Place Soil/Cement Stabilisation Using Hollow Stem Augers For Excavation At Elland, West YorkshireBy J. A. Elliot
Deep Mix-in-Place soil stabilisation is achieved by forming columns of soil/cement arranged to overlap by secant intersection. Alternate columns are constructed initially and infilled. The cementitiou
Jan 1, 1989
-
Economic and Safe Design and the Execution Standards for the Construction Phase of Deep Foundation Systems in Difficult Soil ConditionsBy Seffen Leppla, Rolf Katzenbach, Matthias Seip
"Abstract The economic and safe design of deep foundation systems in difficult soil conditions is based on a reduction of construction material used, construction time spent, energy consumed and a hig
Jan 1, 2014
-
Hand-Excavated Pier Foundations For A High-Rise Hotel In The City Of Dalian, China ? SynopsisBy A. K. C. Chan
Recent hotel investment projects in China often involve very tight programmes for design and construction. An example given in this paper involves a 24-storey reinforced concrete hotel tower with 460
Jan 1, 2010
-
Site Management Towards Pile Execution At Qurashiya BridgeBy Emad W. Shublaq
Contractual site plans are implemented for executing pile foundations (5 x 5) at segmental concrete bridge. Project schedule demands have forced the contractor to find out the most economical procedur
Jan 1, 1992
-
Evaluation of Crane Pad Performance on Partially Improved Ground Adjacent to a SeawallBy Paul J. Sabatini, Yazen A. Khasawneh
"A Demag CC1800 crawler crane was partially erected on crane mats adjacent to a seawall when settlements near a corner of the crane mat area were observed to be slightly larger than previously assesse
Jan 1, 2017
-
2D and 3D Finite Element Analysis for Cantilever Slurry Walls in Cohesionless SoilBy Mostafa Mossaad, Ali Helwa, Manal Salem
Support of excavation (SOE) design practice tends to model SOE elements using two-dimensional (2D) analyses to avoid the complexity associated with three-dimensional (3D) analyses. Such practice overl
Jan 1, 2018
-
CPT - Guided Installation Of Pressure-Grouted Displacement PilesBy Mark M. Petersen
As part of the addition of eight new combined cycle generating units at the Florida Power & Light Sanford Plant, 2,129 piles were to be installed. The existing plant elements were supported on driven
Jan 1, 2002
-
Design And Construction Of Large Diameter Drilled Shafts For The Bath - Woolwich BridgeBy Andrew Peterson
The Maine Department of Transportation offered this challenging design-build project for a new, 12-span, bridge over the Kennebec River in Bath, Maine. This structure would be built to replace the exi
Jan 1, 1999