The Development of a New Cable Cutting DeviceBy Richard B. O'Meara
"The demand by a customer to an Explosives supplier to fulfill a specialised productrequirement was met by a level headed decision to try to satisfy that demand. This paperwill describe the fundamenta
Jan 1, 1993
-
Experimental Investigation on Forced Transition of Gaseous Explosives from Combustion to Detonation in PipesBy Chen Aiping, Wei Banyun, Chen Canchang
"The gaseous explosives consisting of combustible gas and combustion-supporting gas wereused in the opening end of a steel pipe and the ignition was in the closed end of the pipeusing continuous air f
Jan 1, 1993
-
Reducing Underwater Blast Damage with Air-ScreensBy Gregory L. Hempen
"Pressure waves from submerged blasting can have adverse impacts on nearby structuresand on aquatic fauna. Underwater blasting is not allowed for some situations withoutmitigation of these adverse pre
Jan 1, 1993
-
OSM Cost ImpactBy Ronald L. Sanders
The prevailing view of the coal mining industry by government officials is: "Tell everyone you're coming - Don't let anyone know you're there - And remove all evidence you have ever been there". Now t
Jan 1, 1979
-
Screen Analysis of Full-Scale Production BlastsBy R E. Otterness, M S. Stagg
The U. S. Bureau of Mines conducted 22 full-scale blasts to determine the effects of delay and explosive type on fragmentation. The shots were conducted over a period of 7 years in three limestone qua
Jan 1, 1995
-
Potential Limits for Regulation of Environmental Effects of BlastingBy Gerald R. Coonan
Early in the open session of the 1979 SEE Fifth Conference panel discussion, someone asked a question of the panel concerning the future intent of the Office of Surface Mining and the regulatory limit
Jan 1, 1979
-
Importance of Straight Hole DrillingBy Stephen Hamilton
This case history details the issues surrounding the rock drilling industry’s growing demand for straight holes, the importance of straight holes and the introduction of a new production drilling syst
Jan 1, 1999
-
Development of Heat Resistant Emulsion ExplosivesBy Fumihiko Sumiya, Koichi Kurokawa, Yukio Kato, Tetsuya Sawada
In some metal mines, it is a serious problem the decomposition of explosives which occurs suddenly by contact with ore containing pyrites under high temperature conditions. In the present paper, we in
Jan 1, 1992
-
Cumberland Gap Tunnels; Controlled Excavation With Complex GeologyBy Tom Short
The contract to drive twin 4,100 foot (1250.5m) long tunnels under the existing Cumberland Gap highway was awarded to a Joint Venture of S.A. Healy of Chicago, Illinois and Lodigiani USA of Fairfax, V
Jan 1, 1993
-
Improper Spacing; a Major Problem with Surface BlastingBy Richard L. Ash, Calvin J. Konya
Proper selection of the spacing distance between blastholes is fundamental to successful blasting. Its value directly affects the profitability of an operation. It also exercises control over adverse
Jan 1, 1979
-
Burden Velocity Measurement in Cast Blasting Operations at Mount Thorley Mine Using POWERWAVE Face Velocity RadarBy A T. Spathis, J J. Felice, W Klass
Cast blasting has become one of the most efficient ways to move waste rock in open cut coal mining. It is used at Mount Thorley Mine in conjunction with a dragline to move some of the overburden onto
Jan 1, 1992
-
Deep-hole Controlled Blasting in Reconstruction Railway CuttingBy He Guangyi
During rock blasting in extending deep cutting from Jiu Li Mountain to Dong Zhuang Village in Jiao Zhi Railway line, we have drilled deep hole with large scale diving drilling machine and successfully
Jan 1, 1997
-
Blasting Procedures, Veterans Administration Medical Center, Birmingham, AlabamaBy Beau Bryson, Tony Cooley
The following paper is a technical discussion depicting the type of blasting procedures used to control vibration levels. The blast vibration control criteria that was established and the type of moni
Jan 1, 1985
-
Blasting 250 Feet from a Historic StructureA case history is presented where a variance was permitted by the court to change a 500 foot limit to 250 feet for blasting overburden at a surface coal mine in the proximity of a historic structure.
Jan 1, 1991
-
Innovation and Change in Quarry BlastingBy Richard D. Love
Competition in the aggregate industry of the 90's will be an over increasing really. With this in mind a quarry manager should always be comparing new and innovative concepts to increase productivity
Jan 1, 1991
-
Blast Monitoring at Atcom for Improved Blasting EfficiencyBy D J. P Jordan, C V. B Cuningham, A J. Rorke, C G. Ladds, O L. Davey
"During the early stages of the boxcut mining at the Arthur Taylor Colliery, Open Cast Mine(ATCOM), problems were experienced with blasting results. Very large boulders andportions of completely unfra
Jan 1, 1993
-
The Mapping of Vibration Patterns Around a BlastBy D T. Froedge, Michael J. Nutting
A system consisting of an unlimited number of biaxial geophones that measure peak particle velocity and frequency has been developed and utilized at surface mines, quarries and construction sites. An
Jan 1, 1990
-
Signature Hole Blast Vibration Control – Twenty Years Hence and BeyondBy Douglas Anderson
In the early 1980s, a method for controlling blast vibrations other than by modifying the Scaled Distance came into use. Research studies had indicated that blast vibration could be simulated by deton
Jan 1, 2008
-
Development of Low Density Explosives with Wall Control ApplicationsBy C Hunter, K Fedak, J P. Todoeschuck
"Perimeter wall control has a direct effect on the overall grade of any underground miningoperation. Mine management at INCO's Birchtree Mine in Thompson, Manitoba requiresmaximum perimeter wall contr
Jan 1, 1993
-
Blast Vibration Analysis by a Time Series TechniqueBy Francis O. Otuonye
An application of a time series and systems analysis modeling technique to blast vibration data is discussed. The vibration data was taken from a rock support structure and the surrounding rock mass a
Jan 1, 1994