Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Interactive 3-Dimensional Modeling of Anchors at Bluestone DamBy Jamey Rosen, Georgette Hlepas
"Bluestone Dam is a concrete gravity structure with an overall length of 2,060 feet and a maximum height of 165 feet above the streambed. Several major project modification designs have been implement
Jan 1, 2016
-
Real-Time Monitoring During Shaft Contruction For The Sound Transit Ulink I-5 UndercrossingBy Pierre Gouvin
This paper describes the design, installation and monitoring of a state of the art real time geotechnical/structural instrumentation monitoring system to facilitate tunnel construction under Interstat
Jan 1, 2010
-
Deep Compaction Using Vibratory Pile HammersBy Dennis Nottingham
The need for deep compaction of submerged granular soils has led to improvements in this area. In 1971, L.B. Foster Company personnel patented a method of deep compaction using a vibratory pile hammer
Jan 1, 2013
-
Hudson’s Revitalization: The Use of Robotics in the Work PlaceBy Dave P. DeClerck
Hardman Construction was faced with the challenge of completing a large earth retention project on a constricted downtown Detroit site, while maintaining a safe and productive worksite. To do so, new
Jan 1, 2019
-
Stone Column Ground Improvement – A Trial in Silty SandsBy Ana Pereira, Naomi Norris, Donald Bruggers
The city of Christchurch, New Zealand is predominantly founded on alluvial sediments consisting of interbedded layers of loose to medium dense sand, soft to stiff silt and clay mixtures, and pockets o
Jan 1, 2019
-
Vibration Isolation at the Dana-Farber Yawkey Center: OPA FinalistBy David R. Shields, Michael T. Bracher
"The $330 million (U.S.) Dana-Farber Cancer Institute’s Yawkey Center for Cancer Care (Yawkey Center) sits in the heart of Boston’s Longwood Medical Area. The Yawkey Center is a cutting-edge cancer ca
Jan 1, 2012
-
I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Implementation Of Test Results - ImplementationBy Darrell L. Beddard
The test program information provided for some immediate changes on the upcoming contracts and in contract administration for the I-880 Replacement Project. Plan sheet modifications included changes t
Jan 1, 1996
-
Reflections on Tremie Concreting in Deep FoundationsBy Gilbert R. Tallard
"Pouring deep foundations by the tremie pipe method is nowadays such a common process that it has becomes an unspecified practice. Means and methods are almost entirely at the contactor’s discretion.
Jan 1, 2017
-
The Road To Innovation In Geotechnical ConstructionBy Peter J. Nicholson
During my more than 40 years in the practice of underground construction and engineering, the industry has seen progress from the dig down to rock or hardpan or alternatively drive concrete or steel i
-
Case Study: Feather River West Levee Program Cutoff WallsBy Kyle R. Lackner, Jared P. Williams
"The Sutter Butte Flood Control Agency initiated the Feather River West Levee (FRWL) Program in 2010 to bring 35 miles of levee along the Feather River into compliance with applicable Federal and Stat
Jan 1, 2016
-
Settlement Monitoring Of A Building Underpinned With Micropiles And Soil NailsBy Bill Zietlow
A micropile and soil nail underpinning system was installed to support a building immediately adjacent to a 25-ft deep excavation in downtown Salt Lake City, Utah. Both the building and the underpinn
Jan 1, 2008
-
Linking the Installation Response of Screw Piles to Soil Strength and Ultimate CapacityBy James P. Hambleton, Sam A. Stanier
A perceived advantage of screw-type foundations is the ability infer aspects of foundation performance from quantities measured or observed during installation, especially the installation torque. A p
Jan 1, 2019
-
Case History: Comparison of CSL Results to Physical ObservationsBy David S. Graham, Paul J. Axtell
Crosshole Sonic Logging (CSL) non-destructive integrity testing identified anomalous readings near the base of a 6.5-foot diameter drilled shaft rock socket. The anomaly was confirmed to be a defect b
Jan 1, 2019
-
Assessing the Applicability of Thermal Response Testing to Energy PilesBy C. Guney Olgun, Fleur Loveridge, Tracy Brettmann, William Powrie
"Abstract Deep foundations are increasingly being used, not just to carry structural loads, but also to act as heat exchangers as part of a ground source heat pump system. Such foundations, often call
Jan 1, 2014
-
Observational And Numerical Evaluation Of Defects In Deep Mixing Method Columns Used For Lng Process Train Structural Foundation SupportBy Paul J. Sabatini
Between 2008 and 2009, more than 6,000, 23-m long deep mixing method (DMM) elements were constructed to support 124 concrete mats comprising the foundations for the process trains for an LNG facility.
-
New Ground Freeze Method for Groundwater Cutoff below Foundation Excavations in Permeable SoilsBy Daniel W. Mageau, Larry W. Applegate, Aaron K. McCain
"An innovative method of ground freezing was successfully tested to create a “dry” excavation condition for a new building foundation at a site in downtown, Miami, Florida. The subsurface conditions i
Jan 1, 2015
-
Underpinning and Temporary Earth Retention for the ReTRAC Trench in RenoBy K. Ronald Chapman, Claus Ludwig, Doug Jenevein
"In the spring of 2005 Schnabel Foundation Company completed a $15.2 million Design/Build subcontract to underpin 11 structures, and provide 202,800 square feet of earth retention for the Reno Transpo
Jan 1, 2006
-
The Stability Of A Diaphragm Wall ? SynopsisBy X. L. Chen
The diaphragm walling has been recently adopted in one of the largest excavation of deep foundation engineerings in Shanghai, China with dimension of 90m in length, 50m in width and 13m in depth to so
Jan 1, 2010
-
Large Diameter Pile Driving, Acceptance And Soil-Pile Setup New East Span San Francisco-Oakland Bay BridgeBy Saba Mohan
This study presents results based on the Pile Installation Demonstration Project (PIDP) that was conducted as a part of the East Span San Francisco-Oakland Bay Bridge Seismic Safety Project. For the t
Jan 1, 2002
-
Deep Foundations for the Bangkok MRT Chaloem Ratchamongkhon Line Metro ProjectBy Peter A. Thompson, Richard E. Prust
"The Bangkok Mass Rapid Transit (MRT} Chaleom Ratchamongkhon Line project is the first underground subway to be completed in Thailand. It consists of 22 km (14 miles) of twin-bored tunnels and 18 cut
Jan 1, 2005