  • DFI
    Augered Cast-In-Place Pile Load Tests On The Cincinnati, Ohio/Northern Kentucky Riverfront

    By Theodore W. Vogelpohl

    Augered cast-in-place piles have proven to be effective, adaptable and economical for projects throughout the Ohio River Valley. Specifically, they have been used extensively for high-rise structures,

    Jan 1, 2005

  • DFI
    Practice Of Large Diameter Stepped Section Bored Pile Foundation Of A Deep Water Bridge

    By Cen Guoji

    The foundation of bored pouring concrete pile have been adopted in the bridge engineering of China since early in the sixties. They demonstrated tremendous technical advantage and achieved notable eco

    Jan 1, 1991

  • DFI
    Innovative Soe Solutions For Shaft Construction: Getting To Depth With Diaphragm Walls At Westerly Storage Tunnel

    By Ryan Sullivan, Lisa Smiley, Jewels Stover

    The Westerly Storage Tunnel (WST) Project is part of Project Clean lake, the North East Ohio Regional Sewer Dist years. When completed in 2020, WST will be nearly 2 miles of 25-ft diameter tunnel 200-

  • DFI
    1785 Massachusetts Ave. NW, Washington, D.C.

    By Daniel Stevenson, Richard Guenther

    "The preservation of historic buildings is not only essential to the understanding of our national heritage, but it is also environmentally responsible to adapt existing buildings to compatible new us

    Jan 1, 2017

  • DFI
    Deep Foundations - Experience & Problems Encountered-Case Study For Second Thane Creek Bridge At Vashi, New Bombay. - Synopsis

    By S. R. Nandargikar

    Construction of open foundations for the Second Thane Creek Bridge was indeed a challenging task. Some major problems were encountered during the construction of foundations for pier No. P22 (S/N), P.

    Jan 1, 1996

  • DFI
    Understanding The Vibratory Pile Driver/Extractor: A Field Man's Perspective - 1. What Is A Vibro Driver/Extractor And How Does It Work?

    By John L. White

    The vibro driver/extractor is a machine that grips to a pile and vibrates it up and down. When the vibrating pile is lowered into the ground, all soil around the pile begins to vibrate. A vibrating pi

    Jan 1, 1990

  • DFI
    Remedial Drilling and Grouting at Abiquiu Dam, Nm and Fluid Losses in the Embankment, A Case History

    By Suzanne R. Hess-Brittelle, Sharon L. Schulz, Tyler J. Quick, Amy F. Ebnet

    "Abiquiu Dam is a rolled earth fill dam with impermeable core located on the Rio Chama in New Mexico. Abiquiu has had a history of excessive seepage through the fractured sandstone abutments since wat

    Jan 1, 2016

  • DFI
    Alternative Deep Foundation Solutions – DMM at LPV-111 in New Orleans

    By Peter Cali, Wesley Schmutzler

    "The Deep Mixing Method (DMM) was employed to raise and support the LPV (Lake Pontchartrain and Vicinity) -111 Levee in New Orleans. Even using innovative technologies, the tight schedule to achieve t

    Jan 1, 2017

  • DFI
    Cutoff Wall Selection for Levee Improvement

    By Louay Owaidat

    The United States Army Corps of Engineers (USACE) Sacramento District awarded a $64 million construction contract in February 2020 to the Maloney Odin Joint Venture for 3 mi (4.8 km) of levee improvem

    Oct 1, 2022

  • DFI
    Cut-Offs in Temporary Coffer Dams As Seepage Barriers for Concrete Dam Construction –A Case Study of Teesta –V H E Project in Sikkim (India)

    By I. D. Dayal, Anil Kumar Jain

    "Cutoff walls are frequently used to slow down or prevent seepage of water through and/or around dams. Cutoff wall is a type of seepage barrier structure designed to reduce the flow of water underneat

    Jan 1, 2016

  • DFI
    Performance Based Excavation Support Design For Challenging Urban Site Geometry In Toronto, Canada

    By Shawna Munn, Carol Dounitch, Erika Acton

    The EQ Bank Tower, a 24-storey office tower with 4 levels of underground parking, is currently under construction at 25 Ontario Street in the downtown core of Toronto, Canada. The tower geometry requi

    Oct 1, 2022

  • DFI
    Producing Sealing Walls And Sealing Slabs By Applying The Soilcrete Process

    By E. W. Raabe

    The paper discusses the increasing role of specialist grouting techniques to form water seals or cut-offs for deep basement construction. Raabe and Toth discuss the various grouting methods available

    Jan 1, 1989

  • DFI
    Piling Framed Tie down Concrete Retaining Wall

    By Saieb Haddad, Henry Pate

    "Building retaining walls in an urban area is becoming more difficult due to right-of-way restraints. Using standard concrete cantilever walls requires a construction easement behind the walls for ins

    Jan 1, 2007

  • DFI
    Piling Framed Tie Down Concrete Retaining Wall (4e2f4102-889f-44e0-a228-adb5cc7c450f)

    By Saieb Haddad, Henry Pate

    "Building retaining walls in an urban area is becoming more diffi cult due to right-of-way restraints. Using standard concrete cantilever walls requires a construction easement behind the walls for in

    Jan 1, 2007

  • DFI
    Improvement Of Bearing Capacity Of Bored Piles By Grouting Method

    By Andrzej Tejchman

    A method of improvement of a subsoil under bored pile base by injection is presented. The method employs a special chamber attached to the reinforcement at the bottom of the drilled borehole. The cham

    Jan 1, 2002

  • DFI
    Rectification Measures And Restoration Of Distressed Pump Foundations

    By V K. Panwar, Sampat Raj

    At a Fertilizer plant located in the southern part of India, 74 numbers of pump foundations have shown non-uniform settlements causing the tilting of pump foundations under self-weight primarily due t

    Nov 1, 2022

  • DFI
    Nailed It! The Great Wall of the Chinese Embassy (dbde4e01-35b2-40e7-b641-e07610069e96)

    By Fred Tarquinio, Giovanni Bonita, Lars Wagner

    "A new embassy for the Peoples Republic of China is under construction in Washington, DC. The 475,000 square feet (44,125 m2) structure has five levels below ground and four above, making it the large

    Jan 1, 2007

  • DFI
    Time-Dependent Increase Of The Bearing Capacity Of Displacement Piles

    By Florian König

    It is well known that the bearing capacity and stiffness of displacement piles may increase significantly with time, a phenomenon usually referred to as set-up. In cohesive soils the set-up is commonl

    Jan 1, 2006

  • DFI
    Vsm And Ofd® Technology: Mechanized Solutions For Deep On- And Offshore Foundations

    By Nils Schneider, Marc Peters, Stefan Frey, Andrea Fluck

    Due to the worldwide population growth, the development of sustainable infrastructure and the exploration of renewable energies plays a key role to handle the rising megacity trends and to limit carbo

    Nov 1, 2022

  • DFI
    A Numerical Model For Load Transfer And Settlement Of Bored Cast In-Situ Piles

    By Joshua R. Omer

    A numerical model is developed for predicting the load transfer and settlement behaviour of vertically loaded, bored cast in-situ piles. Based on analysis of full-scale pile tests, closed-form equatio