Construction of the Turin Metro Line 1 Tunnel by N.3 EPB TBMs
By P. Perruzza, R. Grandori, A. De Biase, A. Ciamei, A. Busillo
The Turin metro alluvium soil is mainly made of large boulders, cobbles and gravel , few sand and almost no fines. This grain size curve is out of the range of application for EPB and Slurry TBMs.
Jan 1, 2005
-
Some Thoughts On the Current Situation and A Look Ahead
By Richard J. Stoehr
In his time on earth, man has mined about 93.3 kt (3 billion oz) of gold. About one-half of this has been produced in the past 35 years. Roughly one-third of this gold is held as reserve in Central Ba
Jan 11, 1984
-
Grouting and Segmental Linings—Proceed with Caution
By Thomas Gregor, Brian Garrod
As the popularity of precast concrete segmental linings for tunnels is growing in North America, some problems related to grouting of, and near, these linings are starting to appear. The installat
Jan 1, 2005
-
Rare Earth Elements - SME Statement
It is crucial to reestablish a domestic rare earths minerals production industry to help secure the Nation's clean energy future, reduce the U.S. vulnerability to material shortages related to na
Jan 1, 2011
-
Mineral processing and utilisation of iron ore tailings
The only significant iron ore deposit in Hungary could be found in Rudabánya. The mine was closed in 1986. The area of Rudabánya was always the home of heavy mining activity. In former times, mainly s
Jan 1, 2011
-
Machine Utilization Time Of NATM Method In Metro Tunnels: The Case Of Kadikoy-Kartal Metro Tunnels (Istanbul) ? Introduction
By I. Ocak
Initial investment for mechanical boring of tunnels is found to be high in most cases. Conventional drilling and blasting is not the possible especially in urban area. In these conditions impact hamme
Jan 1, 2011
-
Austrian Method Of Tunnel Building In Very Heavily Squeezing Ground In Mountainous Terrain Theory And Practice
By Horst Pöchhacker
The largest structure along the Tauern highway section between Salzburg and Villach is the 6.4-km-long Tauern Tunnel. The major geotechnical problems that came up surprisingly while driving the headin
Jan 1, 1976
-
Exploratory Fea & Conceptual Design Findings Of Large Diameter Segmentally Lined Shaft
By D. Kruse
Top down constructed large diameter (up to 90 m [300 ft]) shaft design and constructability issues present an interesting suite of challenges and opportunities highlighted in this paper. The study cov
Jan 1, 2011
-
Destruction Of Cyanide In Gold And Silver Mine Process Water
By F. W. DeVries, O. B. Mathre
Addition of Kastone® peroxygen compound and formaldehyde to cyanide gold extraction process effluents, containing at least 5 mg soluble copper per liter, will oxidize acid-dissociable cyanide to leve
Jan 1, 1981
-
GIBE II Tunnel Project?Ethiopia: 40 Bars Of Mud Acting On The TBM ?Special Designs And Measures Implemented To Face One Of The Most Difficult Events In The History Of Tunneling?
By Antonio De Biase
In October 2006, a 7m Double Shield TBM, boring through very poor volcanic formations, was pushed back by fluid mud, which presence had not been detected during previous field investigations, due to t
-
Construction of the Pergau Hydroelectric Power Project, Malaysia
By Patrick J. Doig
In mid-1991, the design/build contractor set to work on the Pergau HEP in a remote corner of Malaysia, armed with only a slim volume of conceptual drawings. The next five years saw roads, power lines,
Jan 1, 2001
-
Optimum Sublevel Height and Drift Spacing in Sublevel Cave Mining Based on Random Medium Theory Mining, Metallurgy and Exploration (6ee2c5d0-4d40-4945-8e70-9bbd8477aa28)
By Fengyu Ren, Ruslan Puscasu, Kunpeng Yu, Gideon Chitombo, Liangliang Kang
Weak rock mass and poor flow of material can cause excessive ore loss and dilution in sublevel caving. This paper proposes a method to establish design parameters for an inclined deposit within a weak
-
DREYER AWARD - How Orebodies are Found
By J. David Lowell
The first part of this article is a review of industry techniques and styles during the past 50 years. It is followed by my career history during the same period. The second part covers my ideas abo
Jan 1, 2000
-
Recovery Of Expanded Polystyrene From Coated Patterns Rejected From Lost Foam Casting (7e824799-4a95-4f4f-bb75-096af0709dc7)
By J. Drelich, J. Pletka
Lost foam casting patterns are foamed polystyrene shapes glued together into the shape of the part to be cast and are coated with a refractory material consisting of a mineral mixture and binders. Pr
Jan 1, 2001
-
T& UC Tunnel Demand
TABLE TUNNEL NAME OWNER LOCATION STATE TUNNEL USE LENGTH (FEET) WIDTH (FEET) BID YEAR STATUS Gateway Tunnel project Amtrak Newark NJ Subway 14,600 24.5 2015 Under study
Sep 1, 2013
-
Mt. Baker Ridge Tunnel: Construction Of A Large Diameter Soft Ground Tunnel By The Stacked Drift Method
By John F. MacDonald
This paper describes the driving of a 400 m long by 25 m diameter highway tunnel through sensitive, overconsolidated silts and clays. The design concept requires the construction of the permanent supp
Jan 1, 1985
-
SAG Mill Pilot Testing Of A High-Clay Silver Ore At Gumuskoy, Turkey
By A. C. T. Bigg, Y. Kocak, N. K. Bodur
The Gumuskoy silver mine, owned by the Etibank, in the province of Kutahya, Turkey, has been operating since 1987 with primary, secondary and tertiary crushers, and two parallel single stage ball mill
Jan 1, 2000
-
Automatic Selection of Fragment Images From a Moving Conveyor Belt
By W. X. Wang
In the mining and quarry industries, rock fragments are often transported by conveyor belt. To estimate the qualities of the rock fragments (i.e., size distribution and shape), an operator must take
Jan 1, 1996
-
Study on the effects of scrubber operation on the face ventilation
For the past four years, the Department of Mining Engineering at the University of Kentucky has conducted a validation study of the CFD Fluent code, by comparing its results against mining-related ben
Jan 1, 2009
-
Reclamation At The Santa Fe/Calvada Mine Breaks New Ground
By Leslie Burnside
Homestake Mining Co. set out to complete final reclamation at a former open-pit gold mine in west central Nevada. The goal was to exceed regulatory standards by satisfying the company's own high
Jan 1, 1999