Search Documents

  • NIOSH
    RI 3866 Recovery of Cobalt from Manganese Ores in the Production of Electrolytic Manganese 1. Cobalt Content of Manganese Ores. By David Schlain 2 Seperation and Electrodeposition of Manganese and Cobalt from Manganese Electrolytes

    By R. G. Knickerbocker, David Schlain, F. K. Shelton, J. H. Jacobs

    "Many manganese ores contain from 0.1 to several percent cobalt. If such ores arc used for the production of ferromanganese, the cobalt is lost; on the other hand, if they are used for the production

    Apr 1, 1946

  • SME
    Design And Construction Service Tunnels On Palm Jumeirah Island

    By Ben Hayes, Michael Ryjevski

    The Palm Jumeirah is the smallest of the three Palm Islands (Palm Jumeirah, Palm Jebel Ali and Palm Deira). It is located on the Jumeirah coastal area of the emirate of Dubai, in the United Arab Emira

    Jan 1, 2007

  • IIMP
    Ocurrencia de cuerpos mineralizados en yacimientos vetiformes del batolito de Pataz

    By Milton Camino Ramos

    MARSA forma parte de los yacimientos vetiformes de la franja metalogenética aurífera del Batolito de Pataz, y políticamente se encuentra ubicado en la provincia de Pataz, La Libertad. En este sentido,

    Sep 12, 2011

  • IOM3
    Effect of ladle additions on chemical composition of metallurgical-grade silicon

    By R. M. Cooper, H. K. Herbert, D. N. Phillips

    A study was carried out to determine the effects of adding CaCO3, Fe, Al and CaSi2 to the ladle, rather than to the raw materials, in order to increase the concentration of Ca, Fe and Al in the final

    Jun 19, 1905

  • CIM
    Gouging Abrasion Resistance of Materials for Oil Sands Service

    By Rees J. Llewellyn

    Improved product development, assessment methods and evaluation studies of materials for oil sands applications have traditionally focused on low and high stress abrasion and slurry erosion resistance

    May 1, 2004

  • DFI
    Behavior Of Excavation And Pile Foundations In Soft Bankok Clay

    By D. T. Bergado

    The uppermost subsoil profiles of the Bangkok plain can be divided into four layers, namely: weathered clay, soft clay, stiff clay, and dense sand layers. The soft Bangkok clay is a normally consolida

    Jan 1, 2010

  • DFI
    Earth Retention Using Augered Cast-In-Place Piles - A. Introduction - 1. Applications

    By William S. Heckman

    a. When to use: high surcharges, vertical capacity required, limit noise and eliminate vibrations, low headroom, eliminate vibration induced settlements. b. Advantages: eliminates impact noise and

    Jan 1, 1997

  • AUSIMM
    Recovery of the Undercutting Front in a Mine with Conventional Panel Caving – Case Study at North Reserves Sector, El Teniente Mine

    By N Rivera, A Music, C Cisternas

    In an underground mine operated with panel caving and subjected to high stresses, geotechnical events such as collapses or rock bursts are fairly recurrent. Both situations can involve risks for peopl

    May 9, 2016

  • SME
    Leaching Of Sarcheshmeh Copper Oxide Ore In Sulfuric Acid Solution

    By H. Razavizadeh

    The recovery of copper from oxide ores containing from 2% to 4.1% acid-soluble copper from the Sarcheshmeh mine in Kerman province of Iran was investigated by agitation leaching in sulfuric acid media

    Jan 1, 2008

  • SME
    Robbins 10M Double Shield Tunnel Boring Machines On Srisailam Left Bank Canal Tunnel Scheme, Alimineti Madhava Reddy Project, Andhra Pradesh, India

    By William Brundan

    INTRODUCTION The Srisailam Left Bank Canal (SLBC) Tunnel Scheme is part of the Alimineti Madhava Reddy Project in Andhra Pradesh, South India. This scheme has been planned since 1983 and will provide

  • SME-ICGCM
    Analysis of Extensometer Data from a Room Widening Experiment Designed to Induce a Roof Fall

    By Dennis R. Dolinar

    Roof falls, even of supported roof, still constitute a major hazard in underground mines. However, associated with any fall or instability is a pattern of roof movement. Therefore, the National Instit

    Jan 1, 1997

  • CIM
    Gold Alloy Deformation Processed Metal - Metal Matrix Composite Wire

    By Timothy W. Ellis

    Wire Bonding is the dominant IC interconnection process presently used in the semiconductor assembly industry (1). The flexibility, adaptability and cost of wire bonding will continue to keep it as th

    Oct 1, 2003

  • DFI
    Execution And Evaluation Of High Capacity Caisson Load Tests In Glacial Deposits

    By Franklin M. Grynkewicz

    As part of the Boston Harbor clean up project, the new 1,000 mgd Deer Island Sewerage treatment plant includes ten 240 feet high egg-shaped "residuals" tanks. Contract documents called for these struc

    Jan 1, 1992

  • AUSIMM
    Some New Ideas on the Age and Origin of the Etheridge Goldfield, Queensland, and their Exploration Implications (495c9435-8309-4f05-8133-4703aafde3c7)

    Close spatial relationships between the deposits of the Etheridge Goldfield (23 000 kg of bullion) and various regional geological and geophysical features suggest that genesis of the ore deposits was

    Jan 1, 1981

  • CIM
    The evolution and future of overburden dewatering at Highland Valley Copper (ccb710cb-32e0-4645-ac2a-8a63f54a56a6)

    By P. A. Witt

    "Highland Valley Copper is a conventional truck-shovel mining and flotation concentrator operation located 75 km southwest of Kamloops, British Columbia (Fig. 1).The ore is situated within a porphyry

    Jan 1, 2005

  • SME
    Can The Toxicity Of Asbestos Be Reduced? - Preprint 09-124

    By F. Habashi

    Asbestos, an extremely useful natural resource, has been studied extensively mineralogically and for industrial application. Its extraction from ores has been greatly improved with respect to safety i

    Jan 1, 2009

  • AUSIMM
    Modern Prospecting on an Industrial Scale

    MR. W. E. WAINWRIGHT occupied the chair, and in introducing the lecturer said, on account of the absence of the vice-president, it fell to his lot to introduce the lecturer. Mr. Tennberg, he said, was

    Jan 1, 1930

  • SAIMM
    The Design Of Stable Pillars In The Bushveld Complex Mines: A Problem Solved? - Synopsis

    By D. F. Malan

    This paper gives an overview of the difficulties associated with determining the strength of hard-rock pillars. Although a number of pillar design tools are available, pillar collapses still occur. Re

    Jan 1, 2011

  • AIME
  • SME
    Handling The Impacts Of Blasting On Grand Central Terminal For The MTA?s East Side Access Project

    By A. J. Thompson

    The Metropolitan Transportation Authority (MTA) East Side Access project (ESA) will, when it is complete, provide a new link to the east side of Manhattan from Long Island, NY that, linked with the Se

    Jan 1, 2012