Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Owner Procured Tunnel Boring Machines––A Discussion

    By A. R. Biggart, A. Walters, G. J. E. Kramer

    The Owner Procurement Process or OPP is a proven, viable alternative contract delivery method that is potentially applicable to many tunnel projects. Using the OPP, the owner specifies and procures ma

    Jan 1, 2005

  • SME
    Northwest Mining Association Sparks Glimmer of Mining Hope

    By Steve Kral

    The domestic mining industry may be in the doldrums but there appears to be hope, at least from a regulatory standpoint. At least one US senator believes that the events of Sept. 11, 2001 made man

    Jan 1, 2002

  • SME
    Environmental and Mineral Exploration System Integration: Promoting Capture of Quality Environmental Data from the Outset

    By Tom Dettweiler, Robina Sharpe, Wright. Michael

    The International Seabed Authority and a number of countries have or are in the process of developing environmental impact assessment guidelines and legislation for seafloor mineral development. The f

    Sep 1, 2014

  • SME
    Mineral processing and utilisation of iron ore tailings

    The only significant iron ore deposit in Hungary could be found in Rudabánya. The mine was closed in 1986. The area of Rudabánya was always the home of heavy mining activity. In former times, mainly s

    Jan 1, 2011

  • SME
    Mineralogy and upgrading ability of Mejel valley zircon ore

    By SH. Shahsavari, H. Akbari, M. Noaparast, M. Oliazadeh

    Mejel valley zircon ore in Iran is located in north part of Iran and was sampled to evaluate its concentration. The aim of this project was to define the mineralogy of this zone and separating zircon

    Jan 1, 2005

  • SME
    Underground Mine Stream Crossing Assessment: A Multidisciplinary Approach

    Underground mine designs typically try to avoid extraction beneath streams and rivers of any significant size, especially when the overburden rock thickness between the stream bed and the mine is thin

    Jul 28, 2020

  • SME
    Flue Gas Treatment For So2 Removal With Air-Sparged Hydrocyclone Technology

    By R. Bokotko, J. D. Miller, J. Hupka

    Laboratory results from an initial study on the removal of SO2 from gas mixtures are reported using air-sparged hydrocyclone (ASH) technology. Tap water and alkaline solutions were used for absorption

    Jan 1, 2002

  • SME
    Continuous Surface Mining Equipment: How to Achieve Success

    By Edward DeLilla

    For the past 30 years, surface mines have moved toward more highly mechanized, automatic systems that continuously mine overburden and ore to increase productivity, lower operating costs and minimize

    Jan 1, 1994

  • SME
    Alberta Lake Re-Established After Draining to Mine Coal

    By Sukru Sumer

    East Pit Lake is an artificially created lake that resulted from the remediation and reclamation of surface coal mining operations at TransAlta Utilities' Whitewood Mine in the Wabamun area west

    Jan 1, 1995

  • SME
    Integrated Mixed Face Mining And Support Systems Washington Metropolitan Area Transit Authority Contract No. 1K0011

    By Vinton A. Garbesi

    The construction involved in the Washington Metropolitan Area Transit Authority (WMATA), Contract No. lK0011 (K-1), encompassed some 2,621 meters of single track parallel tube rapid transit tunnels, 3

    Jan 1, 1979

  • SME
    Maintaining Ring Gears in Ball Mills

    By David Kress

    Mill crushing drive systems are essential to cement producers. With the increased emphasis on operating efficiency, it is vital that these systems be dependable and reliable. No one needs the costs

    Jan 1, 2000

  • SME
    Cold-Model Study on the Maximum Penetration Distance of the Injection Lance in a Kaldo Furnace Mining, Metallurgy and Exploration

    By Manuel Pérez-Tello, María M. Salazar-Campoy, Óscar Rodríguez-Hoyos

    A common problem during the operation of the Kaldo furnace is the formation of accretions and blockage of the injection lance due to splashing. This typically occurs during the processing of anodic sl

  • SME
    Cold-Model Study on the Maximum Penetration Distance of the Injection Lance in a Kaldo Furnace Mining, Metallurgy and Exploration (ce6397bf-f438-41da-92c1-b98240259c35)

    By Manuel Pérez-Tello, María M. Salazar-Campoy, Óscar Rodríguez-Hoyos

    A common problem during the operation of the Kaldo furnace is the formation of accretions and blockage of the injection lance due to splashing. This typically occurs during the processing of anodic sl

  • SME
    Design And Installation Of Large Diameter Sub-Sea Connecting Shafts For The Seabrook Station Cooling Water System

    By Jean-Pierre Nossereau, Allen J. Hulshizer

    The main thrust of this paper covers the design, installation techniques and experience associated with the installation of eleven 1.5 m (4'-11") and three 2.87 m (9'-5") diameter shafts in

    Jan 1, 1981

  • SME
    Boart Longyear Coring Bits Pass Field Tests

    Using mines in Canada, Boart Longyear, a leading provider of drilling services and products, has put its Stage 3 Coring Bit to the test and each time the bit has passed the test with great success. A

    Jan 1, 2009

  • SME
    Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) —Columbus, Ohio

    By Glen D. Frank, Jeremy P. Theys, Mina M. Shinouda, Gary W. Gilbert

    PURPOSE OF THE PROJECT The Big Walnut Augmentation Rickenbacker Interceptor project began in 1995with the preparation of the Scope of Services for the design of the Rickenbacker Interceptor, with

    Jan 1, 2007

  • SME
    Numerical Simulation Of Yield Pillar Behavior With Creep Material Model (e3731e33-0b34-4fad-9202-9242771c3a27)

    By C. Sun

    In this study, numerical simulations of yield pillars employing the finite element method with time-dependent Drucker-Prager material model are conducted. The stress control mechanism of yield pillars

    Jan 1, 1999

  • SME
    Simulation Of Water Seepage Through And Stability Of Coal Mine Barrier Pillars (cd82e376-55f5-444d-97a9-eac4b7728369)

    By Y. Q. Zhang, Y. Luo, S. S. Peng, C. T. Holland

    Barrier pillars in underground coal mines could eventually be subjected to a hydraulic pressure head due to the build-up of mine water in the old workings. The pressure head could not only act as a fo

    Jan 1, 2001

  • SME
    29. Golden Grove Discovery Case Histories ? Introduction

    The Golden Grove Project area is located 220 km (137 miles) east of Geraldton in Western Australia (Fig. 1). The project is a joint venture involving Amax Exploration (Australia) Inc. (Amax), Electrol

    Jan 1, 1991

  • SME
    Nanobubble Column Flotation For More Efficient Coal Recovery

    By A. Sobhy

    Froth flotation is a widely used, cost effective coal cleaning process. However, its high process efficiency is limited to a narrow particle size range between approximately 50 to 600 µm for coal and

    Feb 27, 2013