Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Mineralogical, Fluid Inclusion, and Stable Isotope Study of Wenyu-Dongchuang Gold Deposits in the Xiaoqinling Mt. Area, West Henan, China

    By Jiuhua Xu, Yuling Xie, Fenglei Bie, Neng Jiang

    "Abstract - The Xiaoqingling Mt. area is one of the most productive gold districts in China. The gold-bearing quartz veins are controlled by a series of east-west shear zones within the Archean Taihua

    Jan 1, 1998

  • CIM
    Preliminary studies of the biogeochemistry of silver in British Columbia

    By J. J. Barakso, S. J. Horsky, H. V. Warren

    "A review of past and present biogeochemical studies is given. Early and more recent analytical procedures are described and compared. Tables 1-5 give silver concentrations in various organs of some p

    Jan 1, 1984

  • CIM
    Integrating People, Processes, and Technology in Mining Automation Implementation

    By Laura Mottola

    This paper outlines a framework for ensuring the success of the implementation phase that follows research and development of new mining technologies and systems. It is based upon recent and past less

    Oct 1, 2009

  • CIM
    Investigation of Block Geometrical Properties of the Shale-Limestone Chaotic Complex bimrock of The Santa Barbara Open Pit Mine (Italy)

    By N. Coli

    The exhausted Santa Barbara open pit mine (Tuscany, Italy), owned by the main electric power company in Italy (ENEL S.p.A,) extracted lignite as a fuel for the Santa Barbara thermoelectric power plant

    May 1, 2009

  • CIM
    Computer-assisted mine production planning

    By J. W. Hendry

    "This paper will discuss the application of tools and the evolution of computer-assisted procedures in the production planning process at Quintett e Coal Limited (QCL). In 1986, QCL produced 5.3 Mt of

    Jan 1, 1988

  • CIM
    Improved Iron Recovery at QCM Pellet Plant

    By Guy Chevalier

    The QCM Mount-Wright mine and concentrator complex produces about 14 M tonnes of iron concentrate annually. Approximately 9.5 M tonnes of this concentrate are used to produce iron ore pellets at four

    May 1, 2007

  • CIM
    "Linatex Dewatering Equipment in Selected North American Applications"

    By T. A. Kirk

    "The Linatex Dewatering System is a compact, low capital and maintenance cost matched set of processing equipment suitable for solids recovery, dewatering and desliming sand-like materials in the rang

    Jan 1, 1978

  • CIM
    Potential of Laser Welding and Friction Stir Welding for Joining AA1100-16 VOL.% B4C Metal Matrix Composite

    This work illustrates the potential of two welding processes for joining AA1100-16 vol.% B4C metal matrix composite: laser welding process using a 4 kW Nd:YAG laser and Friction Stir Welding. A compar

    Jan 1, 2011

  • CIM
    25 Years of Collector Development for Sulphide Mineral Flotation

    By B. S. Fee, R. R. Klimpel

    "Froth flotation is the most widely used and economic means of concentrating metal sulfide ores such as those containing copper, lead, zinc, nickel, molybdenum, and pyrite. Also recoverable are other

    Jan 1, 1987

  • CIM
    Stabilization of Lead and Zinc Flotation Circuits at Galmoy Mine, Kilkenny, Ireland

    By Paul Laframboise, Nigel MacDonald, Mike Hallewell, Robert Thorpe

    "Galmoy Mine, owned by Arcon Mines Limited, has operated since 1997, and is one of three operating lead/zinc mines in Ireland. Changes in ore type starting in mid 2002 created challenges to metallurgi

    Jan 1, 2005

  • CIM
    Lead Flotation from Rod and Ball Mill Discharge at Nanisivik Mines Limited

    By J. Goyman, K. R. Rawling

    "1.1 Location and Transportation ServicesNanisivik Mines Ltd. is located at latitude 73°, 3,200 km north of Montreal and 700 km north of the Arctic circle, on the south side of Strathcona Sound, which

    Jan 1, 1984

  • CIM
    Innovative Techniques Employed to Construct Slurry Cutoff Trench for Syncrude's Beaver Creek Dam

    By Michael T. G. Brown

    Syncrude Canada Ltd. has recently completed construction of its ambitious tar-sand mining and processing facilities at Mildred Lake, Alberta. The Syncrude site is approximately 48 km (30 miles) north

    Jan 1, 1979

  • CIM
    Federal budget-food for thought

    By Robert B. Parsons

    "On February 15, 1984 Finance Minister Lalonde presented to Parliament a budget heavily flavoured with the current consultative mood of the Government. Notably absent from the budget was the typically

    Jan 1, 1984

  • CIM
    Study on Effect of Tunnel Excavation in Weathering Alternation Rock on Underground Water

    By Yongquan Zhu, Zhengguo Zhu, Zhichun Liu, Chao Kong, Xinqiang Gao

    "The aim of the study is to have a good understanding of the change in the seepage field during and after the tunnel excavation in weathering alteration rock. Field tests are used to monitor the chang

    Jan 1, 2015

  • CIM
    Silver Flotation from the Kidd Creek Grinding Circuit

    By W. M. Scheding

    "There has recently been a resurgence of interest in unit flotation of mill discharges. At the Kidd Creek concentrator, this technique has been successfully applied to silver flotation in a 3050 mtpd

    Jan 1, 1985

  • CIM
    Gold Deposits, Exploration Realities, and the Unsustainability of Very Large Gold Producers

    By H. R. Bullis

    "Abstract- This paper discusses what appears to be a flaw in the current belief, widely held within the gold mining industry and investment community, that the creation of ever-larger gold mining comp

    Jan 1, 2001

  • CIM
    Lessons Learned from Measuring and Monitoring the Social License to Operate

    By Ian Thomson

    The Social License to Operate ? We are operating in an era where social license in the resource industry is as important ? if not more important ? than mineral potential ? Concept proposed by Plac

    Aug 1, 2013

  • CIM
    Development of a Two-Stage Middlings Circuit at Inco’s Clarabelle Mill Part 1: Laboratory Studies

    By Manqiu Xu, Glen Robertson, Steve Wilson, Pete Quinn

    "The middlings circuit, once called the pyrrhotite rejection circuit, at Inco’s Clarabelle mill was a single flotation stage. It used to process a combined feed consisting of the main flotation scaven

    Jan 1, 2000

  • CIM
    Melt Extraction of Gold Fibers and Precious Metal Doped Fibers and Preparation of Porous Gold Fiber Structures

    By Olaf Andersen

    Crucible melt extraction yields short metal fibers with eqivalent diameters as low as 50 µm from almost arbitrary metals and alloys. Highly porous components can be made from such fibers by suitable d

    Oct 1, 2003

  • CIM
    Dehydration of Mine Tailings using Geocontainers (Mactubes). Case Study: Raura Mine - Huánuco ? Peru

    By J. Oré

    An alternative method for dewatering slurry (tailings) is the use of geocontainers (MacTubes). The practical application of this work was carried out in the concentrator plant of the Raura Mining Comp

    Aug 1, 2013