Dehydration of Mine Tailings using Geocontainers (Mactubes). Case Study: Raura Mine - Huánuco ? Peru

Canadian Institute of Mining, Metallurgy and Petroleum
J. Oré
Organization:
Canadian Institute of Mining, Metallurgy and Petroleum
Pages:
10
File Size:
298 KB
Publication Date:
Aug 1, 2013

Abstract

An alternative method for dewatering slurry (tailings) is the use of geocontainers (MacTubes). The practical application of this work was carried out in the concentrator plant of the Raura Mining Company, located in the occidental mountain between Huánuco and Lima in Peru?s central highland. For the development of the research, the MATLAB R2012a software MGeST (v. 1.0) was used (Slurry Geocontainer Maccaferri Treatment). MGeST is used for sizing MacTubes, which allows determination of the most important design parameters, such as height (H), filling residual pressure (P1O ), strength of geosynthetic (T), and dehydration height. Compared with GeoCoPS v. 3.0, there is a maximum difference of 3% between the results obtained. The tailing to be treated in the MacTube have a specific weight of 11.62 kN/m3. After several tests it was determined that a MacTube of an apparent opening size of 0.22 mm was required for this specific weight.
Citation

APA: J. Oré  (2013)  Dehydration of Mine Tailings using Geocontainers (Mactubes). Case Study: Raura Mine - Huánuco ? Peru

MLA: J. Oré Dehydration of Mine Tailings using Geocontainers (Mactubes). Case Study: Raura Mine - Huánuco ? Peru. Canadian Institute of Mining, Metallurgy and Petroleum, 2013.