Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    New Developments of Jacked Piles

    By Victor Li, Joley Lam

    "INTRODUCTIONJacked piles are piles that are pressed into the ground, usually by hydraulic jacks. For this reason, jacked piles are also known as pressed in piles. Jacked piles are mainly used for the

    Jan 1, 2004

  • DFI
    DYNA Force-An Elasto-Magnetic Sensor For Force Measuring Of Post Tensioning Ground Anchors

    By Lucian Bogdan

    On many occasions during construction and service life of the structure, it is crucial to know the load in post tensioning tendons and anchors. Although there are many methods to measure the tendon fo

    Jan 1, 2009

  • DFI
    Ground Improvement Using Compaction Techniques on Calcareous Sands and Verification Tests Procedures

    By Vijaya Bhushan Rao, Jason Redgers

    A mixed-use development comprising of multistoried residential towers, retail and associated infrastructure covering an area of 500,000 m2 is under construction in Dubai. The subsoil conditions consis

    Sep 8, 2021

  • DFI
    Ground Improvement Using Compaction Techniques on Calcareous Sands and Verification Tests Procedures

    By Vijaya Bhushan Rao, Jason Redgers

    A mixed-use development comprising of multistoried residential towers, retail and associated infrastructure covering an area of 500,000 m2 is under construction in Dubai. The subsoil conditions consis

    Sep 8, 2021

  • DFI
    RC Harris Water Filtration Plant Expansion Excavation Support Design, Installation And Performance

    By Matthew Janes

    The RC Harris Filtration Plant, which treats the majority of the fresh water for over 2.5 million Torontonians, is a Canadian Architectural Heritage site demonstrating a classic example of Art Deco A

    Jan 1, 2006

  • DFI
    Selmon Expressway, Tampa: Case History of Drilled Shaft Design for Extreme Variability

    By Ross T. McGillivray, David S. Graham, Dan A. Brown, Steven D. Dapp

    "The Selmon Expressway includes an elevated structure extending across several miles of weathered karstic limestone geology, and represents a challenge for design because of the high variability of th

    Jan 1, 2015

  • DFI
    Ultimate Lateral Resistance of Piles in Cohesive Soil

    By Lassaad Hazzar

    The ultimate lateral resistance of piles in cohesive soil is studied using the well-known finite difference code, FLAC2D. The Modified Cam Clay (MCC) constitutive relation is adopted in the analyses t

    Aug 1, 2013

  • DFI
    Deep Foundations - Experience & Problems Encountered-Case Study For Second Thane Creek Bridge At Vashi, New Bombay. - Synopsis

    By S. R. Nandargikar

    Construction of open foundations for the Second Thane Creek Bridge was indeed a challenging task. Some major problems were encountered during the construction of foundations for pier No. P22 (S/N), P.

    Jan 1, 1996

  • DFI
    Quality Control of Pile Installation Using Digital Pile Penetration and Rebound Monitoring System

    By Hee-suk Yun, Dae-jin Hwang, Jeong-woo Seok, Myoung-mo Kim

    "In this paper, the accuracy of the data measured by a newly developed displacement measuring system, DPRMs (Digital Pile Penetration and Rebound Monitoring system) and its applicability as a quality

    Jan 1, 2005

  • DFI
    Design and Construction of Mixed Ground Working Platform for a CCR Surface Impoundment

    By Juan M. Pestana, Jeremy M. Gasser, Cuneyt Gokmen, Paul J. Sabatini, William Tanner, Daniel J. Woeste

    An access pathway and working platform were designed and constructed for equipment access for a Deep Soil Mixing (DSM) pilot study over a coal combustion residual (CCR) surface impoundment (SI). The D

    Jan 1, 2019

  • DFI
    Cased Auger Piles (CAP): An Effective Piling Solution

    By Federico Pagliacci

    Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for

  • DFI
    Cased Auger Piles (CAP): An Effective Piling Solution (With CAP Technique)

    By Federico Pagliacci

    Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for d

    Jan 1, 2017

  • DFI
    Presentation #3 - Cross-Hole Sonic Logging And Single-Hole Sonic Logging - Outline

    By Les R. Chernauskas

    ? What is Integrity Testing? ? Cross-Hole Sonic Logging (CSL) ? Single-Hole Sonic Logging (SSL) ? Typical Specifications ? Case Histories ? Observations and Conclusions WHAT IS INTEGRITY T

    Jan 1, 2001

  • DFI
    The Emerging Technology Of EHDE As Applied To Deep Foundations

    By Jerold Bishop

    The application of the ?electro-hydrodynamic effect? (EHDE) to civil engineering has been made in the construction of drilled piles. Equipment for the commercial application of this process was devel

    Jan 1, 2007

  • DFI
    Improved Drainage by Drilled Filter Drains, Dam Safety Upgrade, Case Study

    By Carl-Oscar Nilsson, Åke B. Nilsson

    "The embankment dam at Storfinnforsen is 23 m high and was completed in 1954. The dam has an impervious zone with timber sheet piles and a support fill of glacial till. The pore water pressure in the

    Jan 1, 2016

  • DFI
    A Case Study, Design Change from Spread Footing to Drilled Shafts

    By Drew M. Kurtz, Jeff L. Rai, Sara F. Frailey, Mohammad Ayub Iqbal

    "This paper presents the foundation changes made for a five-span bridge over the Lehigh River constructed as a design-build project. During excavation within the cofferdam at Pier 2 for the constructi

    Jan 1, 2016

  • DFI
    Integration of Landslide Slope Movement Data for Design of an Anchored Stabilization Wall

    By Paul J. Sabatini, Robert C. Bachus, Terence P. Holman, Panos Andonyadis

    A recent landslide comprising approximately 12 acres (4.86 hectare) and a displaced volume of more than 500,000 cy (382,000 m3) caused the shutdown of a four-lane state highway and two high-capacity f

    Jan 1, 2017

  • DFI
    Extra Deep Cut-Off at 250 m Depth - A Case Study

    By Federico Pagliacci

    "Many existing dams are subject to underwater seepage due to subsoil conditions, like deep alluvial deposits or pervious rocks or karst. Remedial works are necessary in order to install new cut-off wa

    Jan 1, 2017

  • DFI
    Piled-Raft Foundations in Belarus

    By V. A. Sernov

    "One of the ways to increase the bearing capacity of a piled foundation is to take into account soil resistance in the base of the raft. Piled raft is similar to shallow foundation and can transfer si

    Jan 1, 2016

  • DFI
    A Geotechnical Data Base Development And Applying Data Mining Techniques To Extract The Common Trendes Of Offshore Geotechnical Properties Of South Pars Gas Field/ Persian Gulf IR-Iran

    By H. Shiri

    Iran's largest natural gas field is South Pars, geologically an extension of Qatar's 900-Tcf North Field. South Pars was first identified in 1988 and originally appraised at 128 Tcf in the e

    Jan 1, 2006