Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Thermodynamic Analysis Of Gold Leaching By Ammoniacal Thiosulfate Using Eh/Ph And Speciation Diagrams (1b00c1b6-1d3c-49da-aa8d-881dd0b4bd68)

    By D. M. Muir

    Thiosulfate offers a non-toxic alternative to cyanide for processing gold ores. The mechanism of leaching gold using ammoniacal thiosulfate solution is driven by the Cu(II)-Cu(I) redox couple and is c

    Jan 1, 2001

  • SME
    Building Human Resources Through Systematically Designed Instruction

    By R. E. Mclvor

    This is an update of an original dissertation on this topic by Lavallee, McIvor and Stolovitch (1992). A step-by-step, technical procedure used to measure and improve the performance of plant grinding

    Jan 1, 2008

  • SME
    Extraction and Separation of Zirconium Using 1-Octanol Mining, Metallurgy and Exploration) (58a7adb7-21cd-47cb-bca7-f6dd6d33ac42)

    By P. L. Crouse, S. J. Lubbe, M. J. Kabangu

    A selective extraction and separation of zirconium by solvent extraction with 1-octanol is proposed. The process is based on the dissolution of the metal basic carbonates in hydrochloric acid in the p

  • SME
    Update On Deployment Of Gamma Radiation Controls For Surface Coal

    By L. Frederick

    Measurement of gamma radiation occurring in nature to characterize geological formations has been widely recognized in mineral exploration. Different methods and apparatuses have been developed for dr

    Feb 27, 2013

  • SME
    A Robust Water-Balance Method For Sizing Heap Leach Solution Ponds

    By J. R. Kunkel, V. Lishnevsky

    At mine sites, the operational and required storage volumes of solution and water storage ponds and reservoirs are usually calculated based upon a water-balance approach. Many climatological variables

    Jan 1, 2002

  • SME
    Large Flotation Cells In The Copper Processing Industry ? Recent Experiences And Future Considerations (Part 1)

    By D. Govender

    In recent years, economies of scale have continued to drive copper projects to larger throughputs to offset depleting lower grade resources. A decade ago there were only a small number of projects tha

    Feb 27, 2013

  • SME
    Estimating Strain and Stress in Oriented Rock Cores Using a Diametral Deviation Method

    A practical core-based method for estimating in situ stress was tested using 360° measurements of rock core diameter in a laboratory setting. In several mining districts across West Virginia, rock cor

    Jan 7, 2020

  • SME
    The Design, Commissioning And Operation Of The Castle Valley Plant In Wellington, Ut

    By P. J. Bethell

    Background Increasingly complex geological conditions, with the presence of high ash binders in the mining horizon were encountered at the A.C. I. Dugout Mine near Price, Utah. This led to the prod

    Jan 1, 2008

  • SME
    Vari-Stem Blasthole Plugs Improve Blasting Patterns

    In September 2003, a test was conducted to see if a115-mm- (4.5-in.-) diam Mocap Vari-Stem blasthole plug could improve the pattern of explosives using different top stemming material. The test too

    Jan 1, 2004

  • SME
    Snow Tunneling at the South Pole

    By John H. Wright

    The United States Antarctic Program (USAP), through its principal support contractor Raytheon Polar Services Co. (RPSC), has recently completed a three-year project comprising nearly 936 m (3,071 ft)

    Jan 1, 2002

  • SME
    Tunneling for the Eastlink Project, Melbourne, Australia

    By Peter Campi, Harry R. Asche, Ian P. Callow, Edmund G. Taylor, P. Scott Smith

    The US$1,850 million EastLink project is a 39km tollway and includes twin 3-lane,1.5km long, undrained driven tunnels. The hard rock tunnels are being built to avoid passing the motorway through the M

    Jan 1, 2007

  • SME
    Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) —Columbus, Ohio

    By Glen D. Frank, Jeremy P. Theys, Mina M. Shinouda, Gary W. Gilbert

    PURPOSE OF THE PROJECT The Big Walnut Augmentation Rickenbacker Interceptor project began in 1995with the preparation of the Scope of Services for the design of the Rickenbacker Interceptor, with

    Jan 1, 2007

  • SME
    CEET (Comminution Economic Evaluation Tool) (For Comminution Circuit Design And Production Planning)

    By G. Kosick, G. Dobby

    CEET, an acronym for Comminution Economic Evaluation Tool, was jointly developed by MinnovEX Technologies Inc. and 13 major mining companies for the purpose of designing and predicting the performance

    Jan 1, 2001

  • SME
    Improved Leaching Performance Of Chalcopyrite By Microbial Cultures Subjected To Mutation

    By J. Kang

    To obtain microbial cultures with the ability to efficiently leach copper ion from chalcopyrite, microbial samples from acid mine drainage sites were mixed and then subjected to mutation using sodium

    Jan 1, 2008

  • SME
    Manufacturers Should Strive for Quality, Cost Effectiveness to Boost Productivity

    By A. Fred Gelding

    Introduction In preparing this paper considerable time was spent attempting to find some upbeat data about the mining industry, so those of us in the field could feel somewhat better about future pro

    Jan 11, 1983

  • SME
    Lessons and implications from the onshore and offshore gas hydrate field production tests

    By Se-joon Kim, Jong-hwa Chun

    "‘Gas hydrate’ is the common term for a solid material formed from the combination of various gases as ‘guest’ and water as ‘host’. A series of large-scale scientific drilling and coring programmes co

    Sep 1, 2014

  • SME
    8 M Diameter 7 KM Long Beles Tailrace Tunnel (Ethiopia) Bored And Lined In Basaltic Formations In Less Than 12 Months

    By Antonio Raschillà

    On the 2nd of June 2007 SELI S.p.A. started the excavation of Beles Tailrace Tunnel (Ethiopia). The new 8,07 m diameter DS Universal TBM utilized for the tunnel excavation was manufactured by SELI S.p

  • SME
    Risk Management of the Canada Line Transit Tunnels ? Introduction

    By Brendan Henry

    The Canada Line is a 19km long automated light rapid transit system with 16 stations in Vancouver, BC, Canada. The Concession was awarded to InTransitBC to design, build, partially finance, operate, a

    Jan 1, 2008

  • SME
    Geographic Information Systems In Borate Exploration: A Case Study At “Old Borate”

    By J. R. Piper

    “Old Borate,” located in the Calico Mountains east of Barstow, California, lead domestic colemanite production from 1884 through 1907. Mineral exploration at “Old Borate” in the early 1980's, e

    Jan 1, 2001

  • SME
    Safety Framework for Programmable Electronics in Mining (a95116c1-d58d-432f-ad32-8ea419ca1fb8)

    By John J. Sammarco

    Mining has one of the highest annual average fatality rates among major US industries. Health and safety dangers have been inherent to mining since the early days of picks and shovels. Even though mi

    Jan 1, 1999