Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Effect of horizontal stress on shallow coalmine slopes

    By I Canbulat, A Mcquillan

    This paper presents a parametric analysis showing the impact of virgin in situ stresses on a shallow (less than 100 to 150 m) high slope in a jointed sedimentary rock environment. Slope stability is a

    Nov 29, 2022

  • AUSIMM
    State-of-the-art of electroslag refining and challenges in the control of ingot cleanness

    By G Stovpchenko, G Jianjun, L Medovar

    Electroslag remelting (ESR) today and into the future, will still be the main process for producing high-quality ingots by suppressing segregation, not just refining chemical composition from impuriti

    Jun 19, 2024

  • AUSIMM
    Applications of Advanced Remote Sensing Systems during a Mine Life

    By B P. Banerjee, S Raval

    In the recent past there have been dramatic advancements in the development of remote sensing platforms (satellite, aircraft and unmanned aerial vehicles – UAVs) as well as sensor systems (multispectr

    Jun 28, 2016

  • AUSIMM
    Direct observation of the fayalite slag formation behaviour from large SiO2 grains

    By S Natsui, Y Goto, S Kawanishi, J Takahashi, H Nogami

    The demand for copper increases yearly, and further improvements in copper smelting efficiency using flash furnaces are required. This study was conducted to understand and promote the interfacial rea

    Jun 19, 2024

  • AUSIMM
    The Floatability Characterisation Test Rig as a Pilot Plant for Flotation Testing ù An OperatorÆs Viewpoint

    By J-P Franzidis, M Esvelt, E V. Manla

    The Floatability Characterisation Test Rig (FCTR) is a self-contained, highly instrumented, mobile pilot plant that is able to treat up to 2 tph solids. It consists of a bank of six 130 L WEMCO« Smart

    Jan 1, 2003

  • AUSIMM
    Adapting to Geotechnical Change – a Case Study of the Carina Open Pit Mine

    By R Jaine, D Strang, M Fowler

    "This paper presents a case study demonstrating active geotechnical pit slope management at the now completed Carina Iron Ore Project operated by Mineral Resources Ltd (MRL). The site is located 105 k

    Nov 15, 2016

  • AUSIMM
    How the Use of Market-Based Risk Metrics can Undervalue Good Mining Projects and Overvalue Poor Ones

    By T Y. Dube

    In this paper current net present value (NPV) based mine valuation techniques that take into account market and private risk are discussed and analysed. Potential pitfalls that arise from the applicat

    May 24, 2012

  • AUSIMM
    The development of optimised pulp lifter design for the Ahafo SAG mill using discrete element method modelling

    By E Asakpo, S Chaffer, A Heath

    Newmont has had continuous production at their Ahafo operations, Ghana, since 2006. In 2013, Ahafo initiated an efficiency programme to improve mill performance and reduce energy consumption. Followin

    Aug 29, 2018

  • AUSIMM
    An initial review of conceptual alternative layouts for production areas in Kiirunavaara mine

    By F K. Altuntov

    The study presented in this paper is based on the Kiirunavaara underground mine located in the northern part of Sweden. The deposit is mined using the sublevel caving (SLC) mining method. This paper b

    Mar 29, 2023

  • AUSIMM
    A risk-based approach to drainage design standard selection for mine rehabilitation and relinquishment

    By A Densten, C Gimber

    Surface water management and drainage is a key aspect of mine rehabilitation and closure planning. In the authors’ experience, drainage related problems are amongst the most common forms of failure in

    Jul 25, 2018

  • AUSIMM
    Jaguar Base Metals Project Case Study – Has Reality Reflected the Study?

    By R Jacobs

    "The Jaguar project is relatively unique in that it was evaluated, financed, built and operated to completion within the last ten years, providing the opportunity to holistically review and reconcile

    Mar 8, 2016

  • AUSIMM
    Evaluation of the impact of modifying froth launders in an industrial flotation bank using novel flotation models

    By A Yáñez, P Vallejos, R Grau, J Yianatos

    In flotation cells, especially in large flotation units, froth management is a crucial variable that should be considered during the design phase or optimised to improve the performance of existing fl

    Aug 24, 2022

  • AUSIMM
    Predicting Finished Product Properties in the Mining Industry from Pre-Extraction Data

    By J E. Everett

    An essential requirement of product quality control in the mining industry is to be able to reliably predict key quality properties of finished product from the data available before the extraction of

    Sep 5, 2011

  • AUSIMM
    Dilution optimisation in sublevel open stoping operations

    By A Vakili

    Dilution is associated with considerable direct and indirect costs in underground open stoping operations. As shown in previous works, an improved ability to predict dilution enables the economic risk

    Mar 29, 2023

  • AUSIMM
    Concentrate Thickeners Feedwell Replacement

    By M Thompson

    "The Jaguar concentrator, 60 km north of Leonora, Western Australia (WA), consists of a standard closed circuit semi-autogenous grinding (SAG) and ball mill producing a float feed of approximately 60

    Oct 10, 2016

  • AUSIMM
    Cape Lambert Port B Shiploading, Sampling and Analysis

    By M Graham, R Brunning, C Andringa-Bate, S Westergren

    In 2010, Rio Tinto Iron Ore’s operations commenced the planning and design of a sampling and analysis system for the new 50 Mt/a Cape Lambert Port B (CLB) facility. Current sampling systems at the por

    Jul 29, 2014

  • AUSIMM
    Cost-Effective Means for Identifying Acid Rock Drainage Risks - Integration of the Geochemistry-Mineralogy-Texture Approach and Geometallurgical Techniques

    By D J. Bradshaw, B Lottermoser, A Parbhakar-Fox

    "Best practice for acid rock drainage (ARD) risk assessment still relies solely on the geochemical properties of sulfidic rocks and mineral processing products, despite the fact that a rockÆs tendency

    Sep 29, 2013

  • AUSIMM
    Automating Communications between Laboratories and Mines – A Case from the Coal Industry

    By S Mundell, J Armstrong, M Evans

    "Automation is a common goal within the coal industry for reasons such as efficiency, reliability and sustainability. However, it requires standards and frameworks so business systems can communicate

    Aug 18, 2014

  • AUSIMM
    New Methods for Quantifying Geology and Geological Engineering Risk in Large-Scale Deep Tunnelling – Both in Design and in the Build Phase

    By D FitzGerald

    A critical component of any new tunnel design in a complex geological setting is the development of an integrated three-dimensional (3D) geology model with a full set of geotechnical properties of the

    Mar 8, 2011

  • AUSIMM
    Getting it right from the beginning – ESG in mineral exploration

    By L H. G McClean

    Environmental, social and governance (ESG) factors have always been important to the minerals industry and is now considered one of our most important opportunities (and risks). Getting it right from

    Sep 1, 2024