Cape Lambert Port B Shiploading, Sampling and Analysis

The Australasian Institute of Mining and Metallurgy
R Brunning C Andringa-Bate M Graham S Westergren
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
12
File Size:
1166 KB
Publication Date:
Jul 29, 2014

Abstract

In 2010, Rio Tinto Iron Ore’s operations commenced the planning and design of a sampling and analysis system for the new 50 Mt/a Cape Lambert Port B (CLB) facility. Current sampling systems at the ports consist of automated robotic, mass-based sampling protocols employed at Dampier, and semi-automated, time-based sampling systems operating at Cape Lambert Port A.The new sampling system at CLB has brought together a fully automated sampling and analysis system utilising time-based sampling, with the capacity to sample ore products of medium quality variation as defined in ISO 3082 (ISO, 2009). The CLB system is required to sample at shiploading rates from 6000 t/h to 13 440 t/h and provide full load-port analysis. The sampling approach is to proportionally extend primary increments (of varying mass relative to shiploading rate) to a standard length using variable speed aero-belt conveyor systems. This enables a fixed number of secondary cuts to be achieved for all primary increment masses and to be delivered to the automated cell. The cell is required to be capable of concurrently processing four individual shipments, each containing multiple cargoes.Achieving the target sampling precision for all export cargo sizes has culminated in the planning, design and construction of the largest automated iron ore port laboratory in the world. The CLB sampling and analysis cell was commissioned in Q3 and Q4 2013. This paper discusses the sampling philosophy and commissioning outcomes.CITATION:Brunning, R, Andringa-Bate, C, Graham, M and Westergren, S, 2014. Cape Lambert Port B shiploading, sampling and analysis, in Proceedings Sampling 2014 , pp 79–90 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Citation

APA: R Brunning C Andringa-Bate M Graham S Westergren  (2014)  Cape Lambert Port B Shiploading, Sampling and Analysis

MLA: R Brunning C Andringa-Bate M Graham S Westergren Cape Lambert Port B Shiploading, Sampling and Analysis. The Australasian Institute of Mining and Metallurgy, 2014.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account