Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Controlled Blasting for Civil Construction in an Urban Environment

    By R Domotor

    Brisbane’s Airport Link is Australia’s largest road infrastructure project, worth a total value of A$4.8 billion. The project is using surface and underground blasting to excavate hard volcanic r

    Nov 8, 2011

  • AUSIMM
    Technology change by regulation – a cresting wave?

    By J D. Pease, J M. I Tuppurainen, P D. Munro

    This paper examines how legislation and regulation can be external drivers of technical change in mineral processing and extractive metallurgy and how the industry can respond. Two examples are consid

    Sep 11, 2017

  • AUSIMM
    Instrumented column testing of salt uptake from compacted red mud into a cover

    By Y Zhu, D J. Williams, M O’Neill, C Zhang, X Lei

    A cover of inert material overlain by topsoil is required over compacted, seawater-neutralised red mud, a waste product from the refining of bauxite to produce alumina. The cover is to be revegetated,

    Jul 23, 2018

  • AUSIMM
    Multiphysics modelling and virtual motion simulation to optimise mining systems in extreme conditions – insights from Mars Science Laboratory (MSL) Curiosity Rover

    By S Padekar, C Tapia, D Likhachev, S Harlikar, D Sapkale

    In the quest to access valuable critical minerals, humankind is expanding the frontier into extreme environments like space and deep-sea mining. These ambitious enterprises involve considerable costs

    Sep 1, 2024

  • AUSIMM
    The Role of the Metallurgist in Project Development

    The role of a project metallurgist is diverse and covers input into the resource definition, mining studies, metallurgical test program development, process engineering and plant design, cost estimate

    Jan 1, 2008

  • AUSIMM
    Precharging Sublevel Shrinkage Production Rings in Hot and Reactive Ground with Electronic Blasting Systems

    By B Crowdey, J Wall

    The particular underground operation relating to this paper is a gold producer and has an orebody predominately consisting of rhyolite and marcasites pyrite. The ore has been identified as being react

    Mar 24, 2014

  • AUSIMM
    The Influence of Caving in the Hirst and Bulli Seams on Powered Support Rating

    By Aziz N

    The objective of the paper is to develop an understanding of the influence of caving on powered support rating by examining the geology and support performance at two sites which represent the cur

    Jan 1, 1986

  • AUSIMM
    Plant rejects disposal strategies applied at Caval Ridge open cut coal mine

    By J Li, H Hooi, D Payne

    Caval Ridge Mine (CVM) is one of the newly established open-cut coal mines of BHP in Queensland, where no tailings dam is planned to be built in order to minimise environmental impacts from mining act

    Jul 23, 2018

  • AUSIMM
    A New Magnetic Drum Separator for Superfine Magnetite

    By Z Tong, M Gao, X Wang

    In response to the need for improved magnetic separators for beneficiation of fine grained iron ores that have been finely ground to liberate the iron minerals from the gangue, a series of high effici

    Jan 1, 2009

  • AUSIMM
    Sources of Sampling Error and Implications for Quality Assurance and Quality Control in Surface and Underground Reverse Circulation Drilling

    By J T. Carswell, K Sutton

    Quality control (QC) of reverse circulation drill sampling commonly involves regular duplicate subsampling to monitor the extent of imprecision or random error in the subsampling system. In gold minin

    Jul 29, 2014

  • AUSIMM
    A ‘no tailings dam future’ – preconcentration strategies ‘down the sizes and across the value chain’

    By P Revell, B Adair, D King, L Keeney

    Grade Engineering®, integrated across the mine value chain, has a pivotal role to play in achieving step change reductions in energy and water usage in mine operations. High levels of gangue rejection

    Nov 10, 2020

  • AUSIMM
    A Historical Review of the Treatment of Preg-Robbing Gold Ores - What has Worked and Changed

    By K Afewu, R Dunne, W P. Staunton

    The treatment of preg-robbing gold ores has always been a technical challenge in the gold industry. Early solutions included removal of preg-robbing carbonaceous material by flotation, the addition of

    Sep 26, 2013

  • AUSIMM
    New Discrete Element Modelling Calibration Technology to Facilitate the Increased Efficiency of Ore Handling and Processing Operations

    By P W. Wypych, D Curry, A P. Grima

    The market has become highly competitive for engineering and equipment vendors, who are challenged to reduce costs while improving efficiency and productivity of mine operations through plant improvem

    Jul 13, 2015

  • AUSIMM
    Improving Drive Stability through Efficient Development Blasting Design and Practices

    By P Klaric

    Drive stability is critical in block/panel cave mining. The production levels of these mines are required to remain operational for the entire life-of-mine which can be in excess of 30 years. It is th

    Aug 24, 2015

  • AUSIMM
    Development in Cut and Fill Mining at ISA Mine

    By Jansen N

    Production from the narrow, high grade silver-lead-zinc orebodies below 15 level commenced in mid 1985.Geological, mining research and recent mining experience determined that a mechanised drill, fire

    Jan 1, 1985

  • AUSIMM
    Comparing Different Prediction Techniques, and Field Results From South African Opencast Collieries

    By E de Necker, F D. I Hodg, L-M Cruywagen

    The acid mine drainage (AMD) situation at three opencast collieries in the Witbank Coalfield, South Africa, was evaluated from different perspectives. Twenty-seven test pits were dug into the spoils o

    Jan 1, 2003

  • AUSIMM
    Transition from owner mining to contract mining – a structured tender process using a holistic approach

    By Y G. Anoman

    This paper discusses the operating model within Endeavour Mining Corporation regarding the options of owner mining against contract mining. It’s based on the concept of ‘are we carrying out the most e

    Jun 22, 2022

  • AUSIMM
    Where are the Women? Highly Qualified Women in the Mining Industry

    By M Scoble, C Hughes, M Roberts

    At 14 per cent, the representation of women working in the mining industry is the lowest among primary industry categories in Canada. Despite an increase in research and industry commitment to advance

    Nov 20, 2012

  • AUSIMM
    Ausenco Carbon Reactivation Design Criteria

    By D Preedy, J K. Claflin, S R. J La Brooy

    This paper summarises the lessons learned during a recent carbon reactivation kiln upgrade project at the Sukari Gold Mine in Egypt. The kiln is being replaced to ensure that the plant achieves full v

    Sep 26, 2013

  • AUSIMM
    Managing Geotechnical Risk Through Non-Destructive Rock Reinforcement Testing Trialled at the George Fisher Mine, Mt Isa

    Corrosion affects the performance of rock support and reinforcement at various underground mines, including the George Fisher Mine, where recent studies showed that this risk to mining operations is g

    Nov 25, 2010