Development in Cut and Fill Mining at ISA Mine

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 6
- File Size:
- 663 KB
- Publication Date:
- Jan 1, 1985
Abstract
Production from the narrow, high grade silver-lead-zinc orebodies below 15 level commenced in mid 1985.Geological, mining research and recent mining experience determined that a mechanised drill, fire and muck cycle would be the most suitable method.Ground conditions are predicted to be worse than in other cut and fill (MICAF) areas at Isa Mine, owing to the increased depth, more variable dip of the orebodies and the increased effect of major geological structures.Mechanised ground support and tight filling techniques feature in controlling these expected adverse ground conditions.