Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Middle Rouge Parkway Interceptor Extension—A Case HistoryBy Harry R. Price, Behrooz Tahmasbi, Charles J. Roarty
The 2,408 meter (7,900-foot) long Middle Rouge Parkway Interceptor Extension varies in size from 1.52-meter (5-foot) to 2.36 meter (7-foot 9-inch) inside diameter. Most of the sewer was constructed in
Jan 1, 2007
-
Practical aspects of large-scale conditional simulationsBy M. E. Rossi
All large-scale applications of conditional simulations intend to benefit from the ‘correct’ (or’ accurate’) characterization of uncertainty, adequately describing the variability observed from the da
Jan 1, 2003
-
RI 3802 Analyses of Crude Oils from Some Fields of Oklahoma Ill. Additional AnalysesBy O. C. Blade
"An important function of the Bureau of Mines is promoting the conservation and more efficient utilization of a natural resource. Petroleum is such a resource, and its utilization depends to a conside
May 1, 1945
-
Case Study: Innovative Soil Nail Stabilization Of A 100 Foot High Urban SlopeBy Mike Fabius
The Lakehead Region Conservation Authority is responsible for slopes along the Kaministiquia River, one of the largest tributaries to Lake Superior in Canada. After arresting toe erosion for a mile o
Jan 1, 2006
-
Splash Generation And Formation Of Surface Waves In A Bottom Blown Ferroalloy Refining VesselSplashing and wave formation has been studied experimentally by using one-seventh water model of CLU (Creusot-Loire Uddeholm) reactor with two different tuyere configurations by using paraffin and wat
Jan 1, 2004
-
The DC WASA Anacostia River CSO Control Tunnel ProjectBy David C. Girard, Larry Williamson, Leonard R. Benson, Ronald E. Bizzarri
On the east side of Washington DC, the DC Water & Sewer Authority is developing a Facility Plan for the Anacostia River CSO Control Projects, including 8 to 12 miles of CSO storage/conveyance and floo
Jan 1, 2007
-
Modeling The Influence Of Slurry Temperature On Gold Leach And Adsorption Kinetics At The Fort Knox Mine, Fairbanks, AlaskaBy Eric M. Hill, Daniel E. Walsh, Hsing K. Lin, John T. Hollow
The Fort Knox Mine is located in Alaska’s interior where the average ambient air temperatures range from -24°C in January to 16°C in July. The mill processes a free milling gold ore utilizing both a
Jan 1, 2005
-
Research Advances In Barrettes: Installation Effects And Load-Carrying BehaviourBy Guo H. Lei
Over the last four decades, barrettes have been ever-increasingly adopted as the foundations for tall buildings and heavy infrastructure projects all over the world. Many findings have been gained fro
Jan 1, 2006
-
Effect of Operating Variables in Knelson Concentrators: A Pilot-Scale StudyBy Sunil Koppalkar, A. R. Laplante
"A Pilot Plant was installed in one of the grinding circuits of the Dome Mill, Ontario, Canada. Tests were conducted on a KCCD12 Knelson Concentrator to systematically analyze the effect of operating
Jan 1, 2007
-
The Journal of Explosives Engineering Vol 21 No 3 - Dynamite DazeI was lucky to land a job in the powder business. I was looking for some way to support my wife and first child to be when I saw an ad in the Hercules magazine, “Explosives Engineer” for technical rep
Jan 1, 2004
-
Mathematical Background For The Design Of Rotating Machinery Foundations With Deep Piles ? SummaryBy Marius B. Wechsler
There are considered deep piles which are fixed in blocks of rotating machinery foundations. A mathematical background is developed for determining the behavior of this kind of piles for motions cause
Jan 1, 1987
-
Environmental Aspects Of The Utilization Of Steel Industry SlagsBy A. Hiltunen, R. Hiltunen
The utilization of blast furnace and BOF slags has long traditions and well-known applications in the building and road construction industries and in soil conditioning. The starting point for product
Jan 1, 2004
-
Industrial Minerals 2004 – Bauxite and AluminaBy P. A. Plunkert
Metallurgical-grade bauxite was imported into the United States from 11 countries in 2004. The principal suppliers of this 10 Mt (11 million st) of imported ore were Jamaica (33 percent), Brazil (25
Jan 1, 2005
-
Seismic Design Evaluation of the Bay TunnelBy Yiming Sun
The 5-mile long Bay Tunnel is a major water supply facility to be constructed under the San Francisco Bay and adjacent marshlands between the San Andreas Fault to the west and the Hayward Fault to the
Jan 1, 2008
-
Thermodynamic Properties Of Carbides, Nitrides, And Other Selected SubstancesBy L. B. Pankratz
Thermodynamic data on carbides, nitrides, and other selected substances were reviewed, evaluated, and compiled at the U.S. Bureau of Mines Albany Research Center. Values for Cp°, S°, H° - H°298, -(G°
Jan 1, 1994
-
Bearing Capacity Of Precast Nodular Piles In Tianjin Soft Clayey SoilBy Xu Youzai
Static loading teets of five nodular piles and four non-nodular piles were performed in Tianjin soft clayey soil in which measurements of axial force and movements were made. Distribution of shaft res
Jan 1, 1991
-
Prevalence and cost of cumulative injuries over two decades of technological advances: a look at underground coal mining in the U.S.By S. M. Moore
Technological advances in underground coal mining have reduced fatalities but may not have reduced worker exposure to cumulative injury risk factors. The objective of this study was to evaluate the pr
Jan 1, 2008
-
Dynamic Analysis Of Follower Driven Piles For The Venice Flood Gate ProjectBy Frank Rausche
Without doubt, driven piles are the most economical deep foundation element for a nearshore environment, providing for high bearing capacities and stiffness, quick installation times, assured quality
Jan 1, 2006
-
Avoid Average Design in Processing PlantsThe quantity, quality and detail of project information increases as project development moves from initial scoping level studies, to pre-feasibility and option studies, then definitive feasibility st
Jan 1, 2004
-
Design Analyses for a Large-Span Tunnel in Weak Rock Subject to Strong Seismic ShakingBy Bhaskar B. Thapa
The proposed Caldecott fourth bore will consist of a two lane highway tunnel along California State Route 24 near the City of Oakland. The proposed design and construction sequence for the 15-m-diamet
Jan 1, 2008