Case Study in Rock Mass Behavior: TBM versus Drill and Blast

Society for Mining, Metallurgy & Exploration
Scott Chesman
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
15
File Size:
774 KB
Publication Date:
Jan 1, 2005

Abstract

Increased TBM performance is leading the way for resurgence in tunneling activity in NYC. Tunnels will be excavated in the same geologic formations as previously excavated D&B tunnels whose construction records are providing valuable insight into the prediction of rock mass behavior. This report compares an eight mile stretch of NYC Water Tunnel #2 with the recently excavated eleven mile stretch of the TBM driven Water Tunnel #3. Comparisons of the type and amount of rock support installed as well as water inflows and grout quantities are made. Rock mass characteristics specific to TBM performance are also evaluated.
Citation

APA: Scott Chesman  (2005)  Case Study in Rock Mass Behavior: TBM versus Drill and Blast

MLA: Scott Chesman Case Study in Rock Mass Behavior: TBM versus Drill and Blast. Society for Mining, Metallurgy & Exploration, 2005.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account