Abstract

160 numbers of double bulb underreamed piles were constructed based on the safe loads specified in IS code at Tripura. The pile load tests yielded a much lower capacity. A detailed investigation work was carried out to find out the reasons for anomaly. The work included soil exploration followed by extraction of two piles bearing numbers 72 and 151. It was seen that the bulbs were not formed as per specification. Some comments on IS Code have been made at the end.