    Design and Construction Challenges at the Piney Branch CSO 049 Storage Tunnel in Washington, DC - NAT2024

    By Ritika Kundu, Moussa Wone, Amanda M. Morgan, Tatiana K. Proctor

    The Piney Branch CSO 049 Storage Tunnel (PBST) will be the last major project for the DC Clean Rivers Program. The project includes construction of a 2,200-foot-long, 18-foot-internal-diameter storage

    Jun 23, 2024

  • SME
    Grouting Aggressive Ground in Qatar - NAT2024

    By Hernan Fernandez, Khalid Saif F S Al- Khayareen, Volkan Salepciler, Jacek B. Stypulkowski

    Wakrah and Wukair Drainage Tunnel, WWDT is 13 km long with a 4.5 m ID sewer water tunnel about 50 to 60 m below ground surface. Integral to the project are several adits with provisions for future con

    Jun 23, 2024

  • SME
    Why an Industry Education City for the Tunnelling Sector - NAT2024

    By Ross K. Digby

    The Victorian Tunnelling Centre (VTC) has evolved its purpose from purely training workers, to a tunnelling industry education city. The VTC has now focused its activities on the areas of technology;

    Jun 23, 2024

  • SME
    The Anacostia River Tunnel System in Washington DC: Construction and Performance of One the World’s Largest CSO Reduction Infrastructures - NAT2024

    By Jeffrey Peterson, John Beesley, Martino Scialpi, John Cassidy

    The DC Clean Rivers Project is DC Water's ongoing program to capture and treat combined sewer overflows (CSOs) during rainfall before they reach the District waterways. The Anacostia River system was

    Jun 23, 2024

  • SME
    Shaft Construction in Glacial Overburden and Karstic Limestone on the Lower Olentangy Tunnel Project - NAT2024

    By Jeremy Cawley, Horry Parker Jr., Clint Wilson

    The 5180 m EPBM drive on the Lower Olentangy Tunnel (LOT) is predominantly within glacial overburden. To connect LOT with the existing OARS deep tunnel in limestone bedrock, the upper 15 m inside diam

    Jun 23, 2024

  • SME
    Ground Freezing for Deep Shaft Excavation Shaft 18B-1 New York City Water Tunnel No. 3 New York, New York - NAT2024

    By Andrew Chegwidden, Tara Wilk

    Shaft 18B-1 is the second shaft to be constructed as a part of contract C547A along the New York City water supply system Tunnel No. 3. More complex than Shaft 17B-1, this site has an additional 30 m

    Jun 23, 2024

  • SME
    Fabrication and Installation of Americas First Post Tensioned Pre-Cast Segmental Tunnel Liner - NAT2024

    By Madeline Mello, Michael Low, Nick Karlin, Bryce Scofield

    The LA Effluent Outfall Tunnel is the first tunnel in the United States to incorporate post- tensioning into the precast segmental lining. Several unique components were integrated to ensure that the

    Jun 23, 2024

  • SME
    Repair of a Failed Reinforced Concrete Adit Tunnel with Carbon Fiber Wrap - NAT2024

    By Daniel Willis, Ryan O’Connell

    An 8-foot tall horseshoe adit tunnel located within an abutment of the Mount Morris Dam in Mount Morris, NY required repair of a failed reinforced concrete liner. The adit tunnel is entirely founded w

    Jun 23, 2024

  • SME
    Tunnel Belt Applications for Long Distance Tunnels with Curvy Alignments - NAT2024

    By Marco Sonnenschein

    Belt conveyors for tunnelling are industry standard and key to high performance of TBM drives. Conveyors reduce traffic in the tunnel and increase safety in the tunnelling process. This paper will ill

    Jun 23, 2024

  • SME
    Secant Pile Wall as Support of Excavation and Final Lining of a Major Underground Metro Station - NAT2024

    By A. Bhargava, V. Nasri

    Traditionally, secant piles have been utilized to provide temporary support during excavation for shafts and cut-and-cover tunnels. As an alternative, the secant piles can be included into the permane

    Jun 23, 2024

  • SME
    TBM Breakthrough in Pressurized Conditions—Ship Canal Water Quality Project (SCWQP) - NAT2024

    By Francesco Chiappalone, Marco Invernizzi, Franco Gasperin, Fabrizio Fara

    As part of the Ship Canal Water Quality Project, 2.7-mile Combined Sewer Overflow tunnel is excavated with a 21.5-foot diameter EPB Tunnel Boring Machine. Due to the difficult geological and hydrogeol

    Jun 23, 2024

  • SME
    Parallel Thimble Shoal Tunnel: Challenging TBM Assembly and Launching in an Existing Island - NAT2024

    By Ruben Piqueras, Juan Luis Magro, Jorge Vázquez, Santiago Martínez, Xavier Manjarín

    The Parallel Thimble Shoal Tunnel project involves the construction of a bored tunnel under Thimble Shoal Channel in Chesapeake Bay (VA), between two artificial islands and parallel to the existing tu

    Jun 23, 2024

  • AUSIMM
    Practicalities of the use of fayalite slags for recovery of metals from urban wastes

    By E Jak, J Chen, B Hogg, S Nikolic, S Nicol

    The quantity of post-consumer ‘waste’ materials generated each year is rapidly increasing. These materials can contain significant quantities of critical metals and present an environmental challenge

    Jun 19, 2024

  • AUSIMM
    The effect of iron oxide on sulfide capacities of CaO-based molten slags

    By K Saito, M Hasegawa

    Removing sulfur and phosphorus from molten iron can be expressed by the following reactions, respectively. [S]Fe + (O2-)slag = (S2-)slag + [O]Fe [P]Fe + (3/2) (O2-)slag + (5/2) (FeO)slag = (PO43-)slag

    Jun 19, 2024

  • AUSIMM
    Reduction and melting behaviours of carbon – iron oxide composite using iron carbides and free carbon obtained by vapour deposition

    By R Higashi, D Maruoka, T Murakami, Y Iwami

    The ironmaking industry consumes a large amount of fossil fuel derived carbon as heat source, reducing agent of iron ores and carburising agent of reduced iron. Although the demand for drastic decreas

    Jun 19, 2024

  • AUSIMM
    The possibility of using an autogenous Hydrogen-DRI slag as a raw material for vanadium extraction

    By N Kojola, A Vickerfält, J Huss

    The possibility of using an acidic autogenous hydrogen direct reduced iron (H-DRI) slag as a basis for vanadium extraction is investigated. For a raw material to be suitable for producing high-quality

    Jun 19, 2024

  • AUSIMM
    Reoxidation of Al-killed ultra-low C steel by FetO in CaO-Al2O3-MgOsat.- FetO slag representing RH slag by experiment and kinetic modelling

    By Y-B Kang, W-Y Cha, Y-M Cho

    Molten slag used in the secondary refining process (RH process) for the production of Ultra-Low C (ULC) steel is typically composed of CaO-Al2O3-MgOsat.-FetO with minor constituents. FetO in the RH sl

    Jun 19, 2024

  • AUSIMM
    Mixed alkali effect on structure of Al2O3-based slags

    By S H. Hyun, J W. Cho

    Jun 19, 2024

  • AUSIMM
    Visualisation of calculated thermodynamic properties by integration of FactSage™ with SEM-EDS element maps

    By S Mitra, D O’Dea, N Barrett, T Honeyands, E Copland

    This work describes a novel mapping technique that allows the direct overlay of calculated local phase equilibria on micrographs of the physical system. The technique demonstrated integrates FactSage™

    Jun 19, 2024

  • AUSIMM
    Slag-metal interfacial reactions in pyrometallurgical processing of industrial wastes for recovery of valuable metals

    By J H. Park, R R. Kim, H S. Park, H J. Kim

    This study focuses on the recovery of valuable metals, specifically silver (Ag) and palladium (Pd), from copper-containing sludge (with copper content less than 20 per cent) generated during PCB proce

    Jun 19, 2024