Segmental Lining Design for the Hampton Roads Bridge-Tunnel - NAT2024

Society for Mining, Metallurgy & Exploration
Botond Beno Dave Watson Danny Read
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
18
File Size:
959 KB
Publication Date:
Jun 23, 2024

Abstract

The Hampton Roads Bridge-Tunnel (HRBT) Expansion widens the existing I-64 four-lane bridge-tunnel corridor to eight lanes through construction of two parallel tunnels, interstate widening, and bridge expansions. The design-build contract was awarded to Hampton Roads Connector Partners with HDR and Mott MacDonald retained as lead designers in a Design Joint Venture. This paper will highlight some of the 􀁎e􀁜 challenges related to the design of the twin bored tunnels from spaceproo􀂿ng, tunnel enabling wor􀁎s, segmental lining design and durability considerations.
Citation

APA: Botond Beno Dave Watson Danny Read  (2024)  Segmental Lining Design for the Hampton Roads Bridge-Tunnel - NAT2024

MLA: Botond Beno Dave Watson Danny Read Segmental Lining Design for the Hampton Roads Bridge-Tunnel - NAT2024. Society for Mining, Metallurgy & Exploration, 2024.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account