                     Modern Tunneling Technology In Deep German Coal Mines Under Difficult Ground Conditions Modern Tunneling Technology In Deep German Coal Mines Under Difficult Ground ConditionsBy Dietrich F. C. Hudewentz, Alfred H. F. Lücker For centuries tunnellers have made use of the experience of miners. In West German coalmining tunnellers have returned the impulses in recent years by giving the miners valuable stimuli with the resul Jan 1, 1983 
- 
                     Engineering Geology of Barrick Goldstrike Mines’ Betze Pit Engineering Geology of Barrick Goldstrike Mines’ Betze PitBy Michael R. Smith Barrick Goldstrike Mines Inc.’s Betze open pit is located at the north end of the Carlin Trend, in Eureka County, NV. Ten open pit gold mines exist on the trend, which strikes northwesterly, through Jan 1, 1994 
- 
                     Cost Calculations for Sublevel Long-Hole Stoping Cost Calculations for Sublevel Long-Hole StopingBy Gordon M. Pugh, David G. Rasmussen INTRODUCTION Sublevel long-hole stoping is a large tonnage stoping method that may be used when there is a fairly com¬petent straight vein and the walls will stand with little support. It is a method Jan 1, 1982 
- 
                     Geologic Constraints on Mining and Recovering Coal in the Western US Geologic Constraints on Mining and Recovering Coal in the Western USBy Ralph J. Anctil, James E. Palmer According to relatively recent estimates by the US Geological Survey and the US Bureau of Mines, there are more than 0.9 Tt (one trillion tons) of remaining identified coal resources in the seven majo Jan 8, 1982 
- 
                     Performance Study Of Wagner-Biro ASL Liner System At Pinto Valley ? Introduction Performance Study Of Wagner-Biro ASL Liner System At Pinto Valley ? IntroductionBy Jack V. Hill A unique type of grinding mill liner has been developed by Waagner-Biro A.G. of Austria. This liner system, termed an angular spiral lining (.ESL), was, successfully tested by Magma Copper Company&apo Jan 1, 1982 
- 
                     Musculoskeletal Disorders Among Dozer Operators Exposed to Whole-Body Vibration in Indian Surface Coal Mines Mining, Metallurgy and Exploration Musculoskeletal Disorders Among Dozer Operators Exposed to Whole-Body Vibration in Indian Surface Coal Mines Mining, Metallurgy and ExplorationBy Sandeep Kumar Jeripotula, Govinda Raj Mandela, Aruna Manglapady Dozer operators are frequently exposed to whole-body vibration (WBV) during the execution of their work. Occupational exposure to WBV in Indian surface coal mines was evaluated by measuring vibration 
- 
                     Stability analysis for steep-slope mines reclaimed using the forestry reclamation approach - SME Transactions 2013 Stability analysis for steep-slope mines reclaimed using the forestry reclamation approach - SME Transactions 2013By D. Kumar, R. J. Sweigard, J. Silva The Forestry Reclamation Approach (FRA) recommends that the upper 1.22 m (4 ft) of spoil material on reclaimed surfaces should be left as uncompacted as possible to facilitate efficient tree root grow Jan 1, 2013 
- 
                     Case studies illustrate the need for a new concept of coal pillar design Case studies illustrate the need for a new concept of coal pillar designBy Syd S. Peng Introduction The most commonly used ground control design in coal mining is the determination of pillar size by various pillar strength formulae for mine layout (Bieniawski, 1983; Holland, 1973; Hust Jan 11, 1986 
- 
                     Shallow Microtunneling below a Critical Runway Shallow Microtunneling below a Critical RunwayBy Matthew Grzelak, Gulsah Erinc, David R. Chapman "The third phase of the Bagram Drainage System project at Bagram Air Force Base in Afghanistan included construction of a shallow, 540-m long, 1.8-m inside diameter drainage tunnel. The tunnel penetra Jan 1, 2016 
- 
                     Long Haul TBM: Use of a Rebuilt Main Beam Machine at the DigIndy Tunnel System in Indianapolis, IN - NAT2024 Long Haul TBM: Use of a Rebuilt Main Beam Machine at the DigIndy Tunnel System in Indianapolis, IN - NAT2024By Christian Heinz, Doug Harding TBMs can last for decades and be rebuilt project after project with proper maintenance. How successful can rebuilt TBMs be? At the DigIndy Tunnel System in Indianapolis, Indiana, USA, a rebuilt TBM wa Jun 23, 2024 
- 
                     Geotechnical Characterization For Caisson Sinking In Medium Stiff Clay Geotechnical Characterization For Caisson Sinking In Medium Stiff ClayBy Michael S. Robinson, Serge Moalli Construction of the CSO Retention - Treatment Tunnel, Segment 1 in Dearborn, Michigan includes excavation for an overflow Structure with a minimum inside diameter of 15.24 m (finished). The excavation Jan 1, 1995 
- 
                     Mechanical Heading Of The Walgau Headrace Tunnel In Austria Mechanical Heading Of The Walgau Headrace Tunnel In AustriaBy Eckart Schneider PROJECT The Walgautunnel is the heart of a new hydro scheme in Western Austria, which is supposed to go into operation in 1984. With it's length of 21,4 km, a bored diameter of 6,25 m and an i Jan 1, 1983 
- 
                     Pre-Excavation Grouting at the Hemphill site — Atlanta WSP Tunnel Pre-Excavation Grouting at the Hemphill site — Atlanta WSP TunnelBy Konner Horton, Adam L. Bedell, Don Del Nero, Brian Jones "The City of Atlanta’s Water Supply Program Tunnel project includes a 7,315-m (24,000-ft) long, 4-m (13-ft) diameter, hard rock tunnel. A complex aspect of the project involves connecting five, blind Jan 9, 2018 
- 
                     Laboratory Blasting Tests In Granite Blocks To Assess Permeability Enhancement For Modified In Situ Mining Laboratory Blasting Tests In Granite Blocks To Assess Permeability Enhancement For Modified In Situ MiningBy S. A. Rholl This paper describes the Bureau of Mines experimental test program which evaluated the effectiveness of using high explosives to enhance orebody permeability. To determine the effect of stress on the Jan 1, 1991 
- 
                     Optimization of Costs for Trackless Mining Ventilation and Cooling Systems Optimization of Costs for Trackless Mining Ventilation and Cooling SystemsBy C. A. Rawlins, P. Rostami "Ventilation systems are not only an integral part of any underground mine design but are a significant contributor to the mine’s capital and operating costs. The ventilation and cooling design system Jan 1, 2015 
- 
                     New Technology In Shaft Sinking The Craig Project New Technology In Shaft Sinking The Craig ProjectBy W. M. Shaver, R. Letourneau, W. R. Dengler Dynatec Mining Ltd. contracted to sink a 1500-m (4920 ft) concrete-lined shaft for Falconbridge Nickel Mines in Sudbury, Ontario, Canada. The shaft has an inside diameter of 6.3 m (20.5 ft) and is equ Jan 1, 1994 
- 
                     Ground Support Systems for Heavy, Squeezing Ground at Burgin Mine Ground Support Systems for Heavy, Squeezing Ground at Burgin MineBy Donald O. Rausch, William E. Hawkes, Odin Jr. Strandberg INTRODUCTION Kennecott Copper Corp.'s Tintic Div. Burgin mine is a 725 t/d (800 stpd) lead-zinc producer, located in the east Tintic mining district, 5.6 km (3.5 miles) east of Eureka, and 130 Jan 1, 1982 
- 
                     Recent Chronic Inhalation Study Results And Their Implications On The Respirable Dust Standard Recent Chronic Inhalation Study Results And Their Implications On The Respirable Dust StandardBy Robert Mermelstein, Robert W. Kilpper In a long term toxicology study SPF, F-344 rats were exposed 6 hours/day, 5 days/week for up to 24-months to a special test toner at 0, 1 (low), 4 (medium), and 16 (high) mg/m3, or Ti02 at 5 mg/m3, or Jan 1, 1991 
- 
                     Case Study: Correcting Mechanical And Control Problems On Essroc?s Multi-Drive Station Horizontally Curved Conveyor ? Introduction Case Study: Correcting Mechanical And Control Problems On Essroc?s Multi-Drive Station Horizontally Curved Conveyor ? IntroductionBy A. Jennings [ ] In November 2005, Essroc Cement, part of the Italcementi Group, commissioned a long overland conveyor at their Nazareth plant in Pennsylvania. This conveyor, tagged CV-105, was designed to tran Jan 1, 2012 
- 
                     Two Tunnels in Totally Different Geological Formations Driven by the Same 7M Double-Shield TBM with an Extremely Thin-Walled Monoshell Honeycomb Segmental Lining System Two Tunnels in Totally Different Geological Formations Driven by the Same 7M Double-Shield TBM with an Extremely Thin-Walled Monoshell Honeycomb Segmental Lining SystemBy Wolfgang Guetter, Wolfgang Weber The upgrading project for two hydropower plants in Slovenia, Europe, requires two new pressure tunnels: Plave II (5.9 km Flysch) and Doblar II (3.6 km Limestone). It is the worldwide largest applicati Jan 1, 2001 