Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Modern Tunneling Technology In Deep German Coal Mines Under Difficult Ground Conditions

    By Dietrich F. C. Hudewentz, Alfred H. F. Lücker

    For centuries tunnellers have made use of the experience of miners. In West German coalmining tunnellers have returned the impulses in recent years by giving the miners valuable stimuli with the resul

    Jan 1, 1983

  • SME
    Engineering Geology of Barrick Goldstrike Mines’ Betze Pit

    By Michael R. Smith

    Barrick Goldstrike Mines Inc.’s Betze open pit is located at the north end of the Carlin Trend, in Eureka County, NV. Ten open pit gold mines exist on the trend, which strikes northwesterly, through

    Jan 1, 1994

  • SME
    Cost Calculations for Sublevel Long-Hole Stoping

    By Gordon M. Pugh, David G. Rasmussen

    INTRODUCTION Sublevel long-hole stoping is a large tonnage stoping method that may be used when there is a fairly com¬petent straight vein and the walls will stand with little support. It is a method

    Jan 1, 1982

  • SME
    Geologic Constraints on Mining and Recovering Coal in the Western US

    By Ralph J. Anctil, James E. Palmer

    According to relatively recent estimates by the US Geological Survey and the US Bureau of Mines, there are more than 0.9 Tt (one trillion tons) of remaining identified coal resources in the seven majo

    Jan 8, 1982

  • SME
    Performance Study Of Wagner-Biro ASL Liner System At Pinto Valley ? Introduction

    By Jack V. Hill

    A unique type of grinding mill liner has been developed by Waagner-Biro A.G. of Austria. This liner system, termed an angular spiral lining (.ESL), was, successfully tested by Magma Copper Company&apo

    Jan 1, 1982

  • SME
    Musculoskeletal Disorders Among Dozer Operators Exposed to Whole-Body Vibration in Indian Surface Coal Mines Mining, Metallurgy and Exploration

    By Sandeep Kumar Jeripotula, Govinda Raj Mandela, Aruna Manglapady

    Dozer operators are frequently exposed to whole-body vibration (WBV) during the execution of their work. Occupational exposure to WBV in Indian surface coal mines was evaluated by measuring vibration

  • SME
    Stability analysis for steep-slope mines reclaimed using the forestry reclamation approach - SME Transactions 2013

    By D. Kumar, R. J. Sweigard, J. Silva

    The Forestry Reclamation Approach (FRA) recommends that the upper 1.22 m (4 ft) of spoil material on reclaimed surfaces should be left as uncompacted as possible to facilitate efficient tree root grow

    Jan 1, 2013

  • SME
    Case studies illustrate the need for a new concept of coal pillar design

    By Syd S. Peng

    Introduction The most commonly used ground control design in coal mining is the determination of pillar size by various pillar strength formulae for mine layout (Bieniawski, 1983; Holland, 1973; Hust

    Jan 11, 1986

  • SME
    Shallow Microtunneling below a Critical Runway

    By Matthew Grzelak, Gulsah Erinc, David R. Chapman

    "The third phase of the Bagram Drainage System project at Bagram Air Force Base in Afghanistan included construction of a shallow, 540-m long, 1.8-m inside diameter drainage tunnel. The tunnel penetra

    Jan 1, 2016

  • SME
    Long Haul TBM: Use of a Rebuilt Main Beam Machine at the DigIndy Tunnel System in Indianapolis, IN - NAT2024

    By Christian Heinz, Doug Harding

    TBMs can last for decades and be rebuilt project after project with proper maintenance. How successful can rebuilt TBMs be? At the DigIndy Tunnel System in Indianapolis, Indiana, USA, a rebuilt TBM wa

    Jun 23, 2024

  • SME
    Geotechnical Characterization For Caisson Sinking In Medium Stiff Clay

    By Michael S. Robinson, Serge Moalli

    Construction of the CSO Retention - Treatment Tunnel, Segment 1 in Dearborn, Michigan includes excavation for an overflow Structure with a minimum inside diameter of 15.24 m (finished). The excavation

    Jan 1, 1995

  • SME
    Mechanical Heading Of The Walgau Headrace Tunnel In Austria

    By Eckart Schneider

    PROJECT The Walgautunnel is the heart of a new hydro scheme in Western Austria, which is supposed to go into operation in 1984. With it's length of 21,4 km, a bored diameter of 6,25 m and an i

    Jan 1, 1983

  • SME
    Pre-Excavation Grouting at the Hemphill site — Atlanta WSP Tunnel

    By Konner Horton, Adam L. Bedell, Don Del Nero, Brian Jones

    "The City of Atlanta’s Water Supply Program Tunnel project includes a 7,315-m (24,000-ft) long, 4-m (13-ft) diameter, hard rock tunnel. A complex aspect of the project involves connecting five, blind

    Jan 9, 2018

  • SME
    Laboratory Blasting Tests In Granite Blocks To Assess Permeability Enhancement For Modified In Situ Mining

    By S. A. Rholl

    This paper describes the Bureau of Mines experimental test program which evaluated the effectiveness of using high explosives to enhance orebody permeability. To determine the effect of stress on the

    Jan 1, 1991

  • SME
    Optimization of Costs for Trackless Mining Ventilation and Cooling Systems

    By C. A. Rawlins, P. Rostami

    "Ventilation systems are not only an integral part of any underground mine design but are a significant contributor to the mine’s capital and operating costs. The ventilation and cooling design system

    Jan 1, 2015

  • SME
    New Technology In Shaft Sinking The Craig Project

    By W. M. Shaver, R. Letourneau, W. R. Dengler

    Dynatec Mining Ltd. contracted to sink a 1500-m (4920 ft) concrete-lined shaft for Falconbridge Nickel Mines in Sudbury, Ontario, Canada. The shaft has an inside diameter of 6.3 m (20.5 ft) and is equ

    Jan 1, 1994

  • SME
    Ground Support Systems for Heavy, Squeezing Ground at Burgin Mine

    By Donald O. Rausch, William E. Hawkes, Odin Jr. Strandberg

    INTRODUCTION Kennecott Copper Corp.'s Tintic Div. Burgin mine is a 725 t/d (800 stpd) lead-zinc producer, located in the east Tintic mining district, 5.6 km (3.5 miles) east of Eureka, and 130

    Jan 1, 1982

  • SME
    Recent Chronic Inhalation Study Results And Their Implications On The Respirable Dust Standard

    By Robert Mermelstein, Robert W. Kilpper

    In a long term toxicology study SPF, F-344 rats were exposed 6 hours/day, 5 days/week for up to 24-months to a special test toner at 0, 1 (low), 4 (medium), and 16 (high) mg/m3, or Ti02 at 5 mg/m3, or

    Jan 1, 1991

  • SME
    Case Study: Correcting Mechanical And Control Problems On Essroc?s Multi-Drive Station Horizontally Curved Conveyor ? Introduction

    By A. Jennings

    [ ] In November 2005, Essroc Cement, part of the Italcementi Group, commissioned a long overland conveyor at their Nazareth plant in Pennsylvania. This conveyor, tagged CV-105, was designed to tran

    Jan 1, 2012

  • SME
    Two Tunnels in Totally Different Geological Formations Driven by the Same 7M Double-Shield TBM with an Extremely Thin-Walled Monoshell Honeycomb Segmental Lining System

    By Wolfgang Guetter, Wolfgang Weber

    The upgrading project for two hydropower plants in Slovenia, Europe, requires two new pressure tunnels: Plave II (5.9 km Flysch) and Doblar II (3.6 km Limestone). It is the worldwide largest applicati

    Jan 1, 2001