New Technology In Shaft Sinking The Craig Project

Society for Mining, Metallurgy & Exploration
W. R. Dengler W. M. Shaver R. Letourneau
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
5
File Size:
379 KB
Publication Date:
Jan 1, 1994

Abstract

Dynatec Mining Ltd. contracted to sink a 1500-m (4920 ft) concrete-lined shaft for Falconbridge Nickel Mines in Sudbury, Ontario, Canada. The shaft has an inside diameter of 6.3 m (20.5 ft) and is equipped with steel furnishings. Dynatec used the owner-supplied, 4.6-m (15.1 ft) diam, double-drum hoist to sink the shaft. For muck removal, 12.5¬t (13.8-st) buckets were used. The capacity of the concrete-¬placement buckets was 4.6 m3 (162.4 ft3). One of the unique features of the shaft sinking operation was the use of a two-¬boom, electric-hydraulic drill jumbo permanently mounted in the shaft sinking stage. An in-the-hole (ITH) drill was used to drill a 200-mm (8-in.) cut hole for the 4.8-m (16 ft), full face rounds. This paper describes the performance obtained with the electric-hydraulic drilling equipment and the high-capacity muck removal and concreting equipment.
Citation

APA: W. R. Dengler W. M. Shaver R. Letourneau  (1994)  New Technology In Shaft Sinking The Craig Project

MLA: W. R. Dengler W. M. Shaver R. Letourneau New Technology In Shaft Sinking The Craig Project. Society for Mining, Metallurgy & Exploration, 1994.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account