                     Design And Construction Of The Sutong Bridge Foundations Design And Construction Of The Sutong Bridge FoundationsBy Robert B. Bittner The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations fo Jan 1, 2005 
- 
                     Soil Improvement Using Gravel-Sand Columns for a Highway Project in Germany Soil Improvement Using Gravel-Sand Columns for a Highway Project in GermanyBy Schmitz Stefan, Stephan Jee-Sun "Due to the reunion of Western and Eastern Germany in the late 80’s, a multitude of infrastructure projects had to be executed. A good portion of these projects required improvement of the motorway sy Jan 1, 2015 
- 
                     Design And Construction Of The Sutong Bridge Foundations Design And Construction Of The Sutong Bridge FoundationsBy Robert B. Bittner The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations fo Jan 1, 2007 
- 
                     Design And Construction Of The Sutong Bridge Foundations Design And Construction Of The Sutong Bridge FoundationsBy Robert B. Bittner The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations f Jan 1, 2013 
- 
                     Using Large Pile Driving Hammers For The Foundation Of Bridges And Windparks Using Large Pile Driving Hammers For The Foundation Of Bridges And WindparksBy Bernhard Bruggaier Outside the oil and gas industry there is an increasing demand to install big piles for the foundation of ports, bridges, and wind-energy plants. This article introduces the design and techniques in u Jan 1, 2002 
- 
                     No. 1 Queens Road - Melbourne, Australia No. 1 Queens Road - Melbourne, AustraliaBy Tom George "INTRODUCTIONNo. 1 Queens Rd was an existing 10-storey office building founded on large pad footings. This project involved the construction of a 6-level, 15m (50-ft.) deep basement excavated immediat Jan 1, 2005 
- 
                     Improved Drainage by Drilled Filter Drains, Dam Safety Upgrade, Case Study Improved Drainage by Drilled Filter Drains, Dam Safety Upgrade, Case StudyBy Carl-Oscar Nilsson, Åke B. Nilsson "The embankment dam at Storfinnforsen is 23 m high and was completed in 1954. The dam has an impervious zone with timber sheet piles and a support fill of glacial till. The pore water pressure in the Jan 1, 2016 
- 
                     Drilled Pier Foundations for Mercedes-Benz Stadium Drilled Pier Foundations for Mercedes-Benz StadiumBy Jean Wehbe, Daniel C. Brahana "The new Mercedes-Benz Stadium (MBS), home of the Atlanta Falcons, is part of a new era of stadium construction in the U.S. These new-age stadiums are larger and have more amenities than their predece Jan 1, 2016 
- 
                     Laboratory Validation Of In-Situ Tests - 1. Introduction Laboratory Validation Of In-Situ Tests - 1. IntroductionThis paper summarizes seven years of Italian experience with the use of large calibration chambers for the calibration, under closely controlled stress and strain conditions, of some in situ testing Jan 1, 1987 
- 
                     Deep Excavation with Well Point Dewatering in Soft Soil Deep Excavation with Well Point Dewatering in Soft SoilBy Mihir B. Roy "Coal transported by rail for Thermal Power Plant in Haldia, West Bengal, India, was to be received and stored in Coal Complex comprising of Wagon Tippler, Track Hopper, Junction Houses and network of Jan 1, 2015 
- 
                     TBM Recovery Shaft Construction - SR-99 Tunnel TBM Recovery Shaft Construction - SR-99 TunnelBy Lance Rasband, Richard Hanke, John Starcevich "The 17.4 meter (57 ft) diameter tunnel boring machine (TBM), the world’s largest at the time of her launch in 2012, locally referred to as “Bertha,” is stuck. Incapacitated due to mechanical failure Jan 1, 2016 
- 
                     Rehabilitation of the Kölnbrein Dam / Austria Rehabilitation of the Kölnbrein Dam / AustriaBy Frank Haehnig, Kurt Kogler "With a height of 200 m, a crown width of 626 m and a concrete volume of 1.6 million m³, the Kölnbrein Dam in the upper Malta valley in Carinthia / Austria is the largest concrete dam in Austria. Boas Jan 1, 2016 
- 
                     Soil Improvement Technique to Mitigate Extreme Settlements on Deep Compressible Deposits in the Bogota Valley Soil Improvement Technique to Mitigate Extreme Settlements on Deep Compressible Deposits in the Bogota ValleyBy Roger A. Archabal, Omar A. Conte, Gustavo Langoni This international case study focuses on the rigorous geotechnical interaction and results of a soil improvement program utilized to mitigate consolidation settlements of over 1.5 m [5.0 ft]. The extr Jan 1, 2018 
- 
                     Nailed It! The Great Wall of the Chinese Embassy Nailed It! The Great Wall of the Chinese EmbassyBy Fred Tarquinio, Giovanni Bonita, Lars Wagner "A new embassy for the Peoples Republic of China is under construction in Washington, DC. The 475,000 square feet (44,125 m2) structure has five levels below ground and four above, making it the large Jan 1, 2007 
- 
                     Analysis of Load Transfer along Large Diameter Bored Piles in Very Dense Sands Analysis of Load Transfer along Large Diameter Bored Piles in Very Dense SandsBy Nabil F. Ismael, Khalid Farraj "The axial load transfer along large diameter bored piles in very dense silty sand was examined by field tests. Two instrumented piles 1.2 m diameter and with embedded length of 18 m and 25 m were loa Jan 1, 2017 
- 
                     Nailed It! The Great Wall of the Chinese Embassy (dbde4e01-35b2-40e7-b641-e07610069e96) Nailed It! The Great Wall of the Chinese Embassy (dbde4e01-35b2-40e7-b641-e07610069e96)By Fred Tarquinio, Giovanni Bonita, Lars Wagner "A new embassy for the Peoples Republic of China is under construction in Washington, DC. The 475,000 square feet (44,125 m2) structure has five levels below ground and four above, making it the large Jan 1, 2007 
- 
                     Large Diameter Piles For Deep Foundation Of Orsang Aqueduct - Synopsis Large Diameter Piles For Deep Foundation Of Orsang Aqueduct - SynopsisBy A. B. Desai The construction of 1144 nos. of piles, each 1.5 m diameter, bored-cast-in-situ type and varying in depths from 6.5 to 23m, has been completed as foundation for 26 piers of 548 m long aqueduct across Jan 1, 1996 
- 
                     Special Aspects of Constructions with Deep Mixing Systems for Infrastructures Special Aspects of Constructions with Deep Mixing Systems for InfrastructuresBy Alexandra Weidle, Seffen Leppla, Rolf Katzenbach, Matthias Seip "A lot of different deep mixing systems have been developed in the last decades for a wide spectrum of applications, e.g. retaining and foundations systems, soil improvement, sealing of toxic substanc Jan 1, 2015 
- 
                     Design, Installation, and Testing of Hollow Bar Tiebacks Used as Excavation Support Design, Installation, and Testing of Hollow Bar Tiebacks Used as Excavation SupportBy Marco D. Boscardin, Kenneth A. Pidgeon, Adriane G. Boscardin "Hollow bar tiebacks can offer an economical alternative to conventional solid bar and strand tieback systems for use in temporary excavation support construction. However, the limitations associated Jan 1, 2016 
- 
                     Experimental Studies On Behaviour Of Single Pile Under Combined Uplift And Lateral Loads Experimental Studies On Behaviour Of Single Pile Under Combined Uplift And Lateral LoadsBy K. Madhusudan Reddy Pile response under combined uplift and lateral load is very important and it is imperative to evaluate the effect of combined loading and only few studies were reported on pile behavior under combine 