Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Journal: Vibration Control Through Better Predictions

    By Keith Best

    It has been said that when a person does something right no one remembers but when they do something wrong no one forgets. This statement, when applied to the explosives industry, has never been truer

    Jan 1, 2008

  • ISEE
    Evaluation of Emergent Electronic Detonators and Modern Non-Electric Shocktube Detonators Accuracy

    By J Silva Castro, W C. Wedding, B T. Lusk, J Calnan, E G. Morris

    The emergence of electronic detonators for use in production mine blasting has enabled mining professionals to rethink the traditional blast design methodologies that pertain to timing. In many ways,

    Jan 1, 2012

  • ISEE
    New Methodology in Measuring Experimental Results of Linear Shaped Charges Using Digital Software

    By Kevin Phelps, Jason Baird, Philip Mulligan, Dominique Nolan

    Determining the transitions from run-up to optimal cut length and optimal cut length to run down, without bias, from the penetration of a linear shaped charge (LSC) is difficult. The stresses applied

    Jan 1, 2013

  • ISEE
    A full-field solution to predict vibrations in the presence of a free surface

    By J. A. Sanchidrián, P. Segarra, S. Gómez

    Blasting is a common activity in mining that can cause significant damage in the remaining rock mass. The most commonly used method for predicting vibrations is the Swedish or Holmberg-Persson approac

    Jan 1, 2024

  • ISEE
    Using Dry ANFO in the Pacific Northwest Rainforest: Washington State

    By William C. Lane

    The Pacific Northwest has an abundance of seamy, coarse granite and basalt rock. It is used primarily for road construction. Small quarries are opened nearest the road work to cut the cost of hauling.

    Jan 1, 1986

  • ISEE
    Cumberland Gap Tunnels; Controlled Excavation With Complex Geology

    By Tom Short

    The contract to drive twin 4,100 foot (1250.5m) long tunnels under the existing Cumberland Gap highway was awarded to a Joint Venture of S.A. Healy of Chicago, Illinois and Lodigiani USA of Fairfax, V

    Jan 1, 1993

  • ISEE
    Kanalku Falls Blasting for Fish Habitat Improvement in Alaska

    By Catherine T. Aimone-Martin, Kristen Kolden

    In August of 2013 the USDA Forest Service (USFS) blasted bedrock at the base of a waterfall in Kanalku Creek within the Kootznoowoo Wilderness Area on Admiralty Island in the Tongass National Forest l

    Jan 1, 2015

  • ISEE
    Removing Booster Influences from Toxic Fumes

    By Michael S. Wieland

    "This report investigates whether it is tractable and thereupon reasonable to remove the boosterinfluences when ranking the toxic fumes of non-cap-sensitive mining explosives. The hazard potential is

    Jan 1, 1999

  • ISEE
    ANFO’S Behavior in Height-To-Detonation and other Thermal Stimulus Tests

    By E. Contestabile, B. von Rosen, P. Lightfoot

    As part of an accident investigation ANFO was subjected to various abusive tests. A tractor-trailer carrying 18,000 kg of blasting explosives, caught fire, burned for approximately 30 minutes, and the

    Jan 1, 2001

  • ISEE
    Reactivity and Spontaneous Detonation

    By Alastair Torrance, Italo Onederra, Do Sun Kim, Kush Patel, Gary Cavanough

    Reactivity of ammonium nitrate-based explosives is associated with the presence of sulphide in the ground reacting with explosive products and in some instances causing spontaneous reactions which can

    Jan 1, 2019

  • ISEE
    Natural Cavities in Iron Ore Deposits in Brazilian Northern Region: Challenges and Strategies

    By Anderson Meireles, Leonardo Soares Chaves, Raul Carretero Hoz, Carlos Eduardo Soares Feliciano, Renato Jacome Costa

    The large iron deposits in the northern region of Brazil located in the Amazon Craton have in common the presence of natural cavities. These cavities primarily occur in the upper layer of the ore body

    Jan 21, 2025

  • ISEE
    Drilling and Blasting Optimization

    By Jorge Flores, Benjamin Cebrian

    Blast Optimization at a high altitude mine operation involves not only the selection of the right drilling designs and explosives but also the circumstances of operators working at low oxygen levels a

    Jan 1, 2015

  • ISEE
    Tunneling in Thinly Foliated Rockmass Conditions

    By G. C. Naveen

    Punatsangchu Hydroelectric Project Authority is constructing 1020 MW underground hydroelectric project in Bhutan. The project envisages construction of concrete dam, Desilting Chamber, Head Race Tunne

  • ISEE
    Cast Blasting Advances and Challenges at Arco's Black Thunder Mine

    By Robert L. Martin, Brian W. Stump

    "The Black Thunder Mine is located in the Powder River Basin of Northeastern Wyoming. Over 39.2million tons of coal were produced at the Black Thunder Mine in 1996. Just over 100 million pounds ofANFO

    Jan 1, 1997

  • ISEE
    Deltadet System from Delta Cap

    By Kevin Dunfield

    The Deltadet System is composed of: The Deltadet II electronic Detonator. A Field Terminal to create, modify or simply execute an existing blasting sequence. The radio remote controlled option is comp

    Jan 1, 2004

  • ISEE
    Paper or Electronic Records – Ways to Improve Blast Documentation and Recordkeeping

    By Travis A. Davidson, Ralph E. Burnham, Cathy Aimone-Martin, J. Kelly Ratliff

    Blasters face a long list of tasks to execute daily—from vehicle inspections to blast design and layout, hole loading and tie-in, securing the site, and finally, safely executing the blast. Good pract

    Jan 21, 2025

  • ISEE
    Considerations in Pre-Split Blasting for Mines and Quarries

    By J Lyall Workman, Peter N. Calder

    "Presplitting is a technique mines and quarries may use to produce high quality final pitwalls. Damage from backbreak can be minimized, thereby insuring the final pit walls standat the designed angle.

    Jan 1, 1993

  • ISEE
    Implementation of Blast Vibration Frequency Control Technology at R & F Coal Company

    By Doug Johnson

    This paper reviews the field implementation of R & F Coal's blasting optimization work concerning analysis, prediction, and control of overburden blasting vibrations using site specific measurements a

    Jan 1, 1988

  • ISEE
    A Blasting Efficiency Descriptor "Bed" (for surface blasting)

    By Evan Jannoulakis, Wilfrid Comeau

    Using the Scaled Distance (SD) and the vector sum Peak Particle Velocity (PPVvs) from a single delay, preferably single blasthole, in a shot, a number is derived which has shown itself to be consisten

    Jan 1, 1998

  • ISEE
    Journal: Blastserve A Discussion Forum for ISEE Members / Effects of Line or Channel Drilling on Vibration

    Hello, everyone. Way back in 1965, Devine and others at the US Bureau of Mines showed that a presplit fracture plane did not affect vibration levels transmitted across the plane (RI 6695).

    Jan 1, 2010