Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Float-In CofferdamsBy Robert B. Bittner
Large diameter piles (2 to 3 m diameter, both driven and drilled) are being used more frequently by designers of bridge foundations. The use of these large piles allows the pile cap to be positioned
Jan 1, 2013
-
FDOT Method of Independent Separation of Tip and Skin Capacities of Driven Concrete Pile with Embedded SensorsBy Sastry Putcha, Vamshi Vemula, Aneesh Goly, Kumar Allady
Current dynamic testing practice to obtain pile total capacity will not yield optimum capacity due to the strain incompatibility between the side and tip resistances during driving. Superposition of e
Jan 1, 2018
-
Design And Construction Considerations For The Use Of Slurry Walls To Construct Water Reservoirs In The Denver FormationBy Ken Andromalos
Continued population growth combined with limited water resources in the Denver area has resulted in the conversion of a number of mined out gravel pits in the area into municipal water storage facili
Jan 1, 2007
-
Recent Developments In Continuous Flight Auger PilingBy P. H. Derbyshire
The use of continuous flight auger piles has increased significantly in the U.K. to such an extent that it is now the most widely used method of constructing small diameter bored piles. This paper des
Jan 1, 1989
-
Site Management Towards Pile Execution At Qurashiya BridgeBy Emad W. Shublaq
Contractual site plans are implemented for executing pile foundations (5 x 5) at segmental concrete bridge. Project schedule demands have forced the contractor to find out the most economical procedur
Jan 1, 1992
-
The World In Steel Sheet Piling ? SynopsisBy M. Dondelinger
This paper presents a comprehensive review of steel sheet piling including internationally manufactured hot rolled sections, their history, applications, installation and driving techniques. The di
Jan 1, 2010
-
Diaphragm Walls for Seepage Control and Remediation: Three Case HistoriesBy Fabio Santillán, Mario Mauro, Raffaella Granata
"This paper presents the utilization of slurry walls methods for the recent remediation of three high hazard active dams in the United States. Tuttle Creek Dam, located in Manhattan, KS, required seis
Jan 1, 2016
-
Marine Foundation Retrofit For The Richmond - San Rafael BridgeBy Patrick E. Durnal
A joint venture of Ben C. Gerwick Inc., Sverdrup (now Jacobs) and DMJM (now DMJM Harris) designed the $779 mill seismic upgrade of the Richmond - San Rafael Bridge over the San Pablo Bay in the San Fr
Jan 1, 2013
-
Large Diameter Rock-Socketed Caissons For Vent Building No. 6 Central Artery/Tunnel Project, Boston - IntroductionBy P. A. Neill, O&apos
The caisson foundation for Vent Building No. 6, at the southern landfall of Boston's Third Harbor Tunnel, was installed inside an unbraced concrete cofferdam 250 feet in diameter and about 70 fee
Jan 1, 1994
-
Behavior Of Excavation With Sheet Piling In Soft Clay ? SynopsisBy G. X. Zeng
A calculation programme of finite element method has been developed in order to study the behavior of excavation with sheet piling in soft clay. Based on a series of isotropically consolidated-undrain
Jan 1, 2010
-
Inaccurate Interpretation Of Offshore Geotechnical Site Investigation Results And Risk Associated - A Case Study Of Conductors Collapse In DrivingBy Hodjat] [Shiri
A 4-legged jacket structure was installed by an Offshore Installation Contractor (OIC) in the Persian Gulf. In addition to four open-end pipe piles, six conductors were installed by OIC. During the in
Jan 1, 2006
-
Time-Dependent Bond Regain In Driven Piles In Permafrost ? SynopsisBy B. Ladanyi
The design philosophies for piles in unfrozen and frozen soils are compared, and their similarities and differences are underlined. It is shown that in frozen soils, the long term behavior of a pile i
Jan 1, 2010
-
A Case Study Supporting The Need For A Rational Method For Design And Installation Of Vibratory Driven PilesBy Franklin M. Grynkewicz
The subject of bearing pile performance installed by vibratory hammers has been a matter of increasing study and continued controversy. A recent case study from a major bridge replacement project is d
Jan 1, 1991
-
Axial Pile Analyses For The New East Span Of The San Francisco-Oakland Bay BridgeBy Jacob Chacko
The east span of the San Francisco-Oakland Bay Bridge (SFOBB), which is one of the most heavily traveled bridges in the world, will be replaced due to seismic safety concerns. The majority of the new
Jan 1, 2002
-
Driven Piles In Glacial Deposits Exhibiting Time Dependent CapacityBy Upendra L. Karna
The pile capacity gain with time evaluated and implemented for the construction of the Route 21 Viaduct in Newark, NJ, U.S.A is discussed in this paper. The project consisted of the replacement of mor
Jan 1, 2006
-
Underground Parking Facilities In RotterdamBy Henk E. Brassinga
In Rotterdam a number of underground parking facilities have been built and are under development in the inner city, and in the suburbs. These parking facilities are located at already densely built a
Jan 1, 2006
-
Reinforcement Project For The Shopping Centre "Grand Littoral" In MarseillesBy J. -M. Rescoussier
Due to Important settlements inducing major structural damages, the western part of the Grand Littoral shopping centre has been closed in 1997. The present paper describes the project of underpinnin
Jan 1, 2002
-
Caisson Design And Construction, Upstream Guide Wall, Locks And Dam No. 26By E. C. Demsky
This paper describes the large diameter caisson foundation for the upstream guidewall at the Lock and Dam No. 26 (Replacement) Project. The guidewall is supported on two rows of 1.8-m diameter concret
Jan 1, 1989
-
Modern Procedures For The Design Of Driven Pile FoundationsBy G. G. Goble
Significant progress has been made in the past decade in determining the load bearing capacity of pile foundations. Developments in the means of prediction of pile capacity as limited by soil strength
Jan 1, 1988
-
Development of New Shaft Resistance Models for Piles Driven in the Puget Sound LowlandsBy Armin W. Stuedlein, Youssef Bougataya
Early stage design of driven piles primarily relies on static analysis based on one or a combination of total and effective stress approaches, the latter known as the method to estimate axial capaci
Jan 1, 2018