Integration of Landslide Slope Movement Data for Design of an Anchored Stabilization Wall
By Paul J. Sabatini, Robert C. Bachus, Terence P. Holman, Panos Andonyadis
A recent landslide comprising approximately 12 acres (4.86 hectare) and a displaced volume of more than 500,000 cy (382,000 m3) caused the shutdown of a four-lane state highway and two high-capacity f
Jan 1, 2017
-
Micropile Performance Variability: A Fundamental Case Study
By Walter E. Vanderpool
Type 1B micropiles (Bruce and Juran, 1997) can be installed rapidly and efficiently. During an 85-day period, 536 micropiles were installed to depths of 61 meters within a site 41 meters by 43 meters.
Jan 1, 2002
-
Seismic Stability Analysis of Seepage Control Measures for Levees in Central Valley, California
By Zia Zafir
"Levees in the central valley of California are primarily for flood control purposes and thus are subjected to infrequent hydraulic loading. The primary concern for these levees is their instability d
Jan 1, 2016
-
Quality Control and Testing of Jet Grouting and its Interpretation in Relation to the Christchurch Town Hall Restoration Project.
By David Chadwick, Paul Marsden, Chris Hughes, Mathias Delapille
"Following damage caused by the 2011 Christchurch earthquakes, the NZ$127.5million Christchurch Town Hall Restoration project is due for completion in 2018. The building is undergoing extensive repair
Jan 1, 1900
-
Lessons Learned From Construction Of A Tire Plant In Karst, Ns2 Tires, White, Ga
By Robert L. Goehring, Fred Munene
This case history for three major additions to a tire manufacturing plant in north Georgia discusses the impact of highly variable Karst (sinkhole) geology on both foundation design and construction.
-
PMF Remediation of Oxford Dam
By Scott Dodds
"The Oxford Hydroelectric Station was a unique project that incorporated a variety of dam strengthening methods to stabilize the facility in order to meet the standards required by Federal Energy Regu
Jan 1, 2005
-
Session 13 "Jet Grouting III"
By Peter Iovino
Unfortunately, I don't know the unit cost per cubic yard of treatment. I reflected on that yesterday and I don't think that we considered the use of micropiles. They could have been an optio
Feb 10, 2003
-
Adapting Multiple Ground Improvement Techniques for Uniform Performance over Heterogeneous Natural and Modified Overburden
By Michael J. Marasa
"Geotechnical engineering and construction primarily relies on the subsurface characteristics of the particular site; however, obtaining both accurate and precise information on those features is chal
Jan 1, 2017
-
Improvements to Commonly Used Cutoff Wall Specifications
By Michael Kynett, Francke Walberg, Richard Millet, Khaled Chowdhury, Mary Perlea
"Cutoff walls are the most common seepage improvement measure for levee flood control projects throughout California’s Central Valley. Cutoff walls are widely used because they can be implemented with
Jan 1, 2015
-
Cooperative Effort Overcomes Problems With Pier And Cofferdam Construction Caused By Rock Slope
By Herbert F. ?Buck? Darling
A bridge replacement project in Rochester, NY, encountered difficulties when it was determined that rock below one pier was sloping downward toward the river at an angle of 42 degrees versus anticipat
Jan 1, 2013
-
Dynamic Pile Testing for the Five Mates Bridge
By Jonathan G. Cannon
"This paper will describe dynamic pile testing conducted during installation of driven octagonal precast prestressed concrete piles used as the foundation for this bridge. The piles were long and henc
Jan 1, 1900
-
Installation Of Augered Cast-In-Place Piles
By Michael Moran
Typical ACIP Pile Rig [ ] Hollow Stem Auger ? Continuous flight auger ? 3 inch inside diameter pipe ? Auger diameters: 12, 14, 16, 18, 20, 22, 24, 30, and 36 inches ? Auger section lengths:
Jan 1, 2005
-
Automated Pile Load Test Monitoring
By Joel L. Volterra
Since 1910, Mueser Rutledge Consulting Engineers (MRCE) has regularly provided professional engineering services including inspection of pile load tests. Historically, such services included on-site
Jan 1, 2008
-
Drilling and Grouting For the Rehabilitation of Contaminated Areas: An Italian Case History
By Raffaella Granata, Daniele Vanni
"This paper presents the drilling and grouting program performed at two abandoned landfills located into former calcarenite rock quarries in Manfredonia, Italy. Tests performed after the abandonment o
Jan 1, 2016
-
Alameda Corridor-East: San Gabriel Trench Project
By David Peterson, Terry Tucker, Rafael Serrano
"The Alameda Corridor-East (ACE) Construction Authority awarded a $172.6 million contract to Walsh Construction Company (Walsh) for the construction of a 2.2 mi (3.5 km) long grade separation includin
Jan 1, 2017
-
Virginia Route 340 Bridges: Challenges in Karst Terrain
By Chaz Weaver, James Sheahan, Michael Mo
"The Virginia Department of Transportation (VDOT) undertook a program to replace four bridges along approximately 4 mi (6.4 km) of US 340 in Northwest Virginia. Two of these bridges, which span Compto
Jan 1, 2017
-
Numerical Evaluation of Top of Rock Profile, Rock Strength and Conductivity.
By Zhang Wengang, L. John Endicott
The properties of many geological materials are variable. This is especially true for variations in elevation of the top of rock profile, strength of weathered rock, and conductivity of rock masses. O
Jan 1, 2019
-
Performance Of Cast-In-Place Piles Installed With A Fixed Mast Drilling Platform In Claystone ? Glenrock WY
By Brent Wilkins
The project team was tasked with the design and installation of a deep foundation system to support an expansion to a power generating station in Glenrock WY. Cast-in-place piles installed by a fixed
Jan 1, 2009
-
Terminology and Evaluation Criteria of Crosshole Sonic Logging (CSL) as applied to Deep Foundations
By Greg Canivan, Bernie Hertlein, Les Chernauskas, Joram Amir, Garland Likins, E. Anna Sellountou, Tim Kovacs, Peter Kandaris
Nondestructive testing of drilled shaft foundations via Crosshole Sonic Logging (CSL) is often performed as part of the quality assurance process to assess the soundness of concrete. The intent of CSL
Jan 1, 2019
-
Design And Construction Of The Large Bored Piles For A Bridge Over The Yellow River ? Synopsis
By Y. Z. Wang
Zhengzhou Yellow River Highway Bridge, which is under construction, has a total length of 5550 meters with bored cast-in-place concrete piles as the foundations of its piers which have a diameter of 2
Jan 1, 2010