Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Economic Analysis of Waste Crushing in Semi-Mobile In-Pit Crushing and Conveying Systems

    By M. Kumral, E. Dilhuydy, B. Ozdemir

    "In-pit crushing and conveyor (IPCC) systems have become increasingly popular in the mining industry as an alternative to truck-and-shovel systems. Deciding whether to haul waste rock by truck or IPCC

    Jan 1, 2017

  • CIM
    Development of the Twin Metals Minnesota Flowsheet Incorporating the Platsol™ Process

    By G. Barr

    "The Polymetallic Twin Metals Project deposits in Northern Minnesota are being developed by Twin Metals Minnesota. Amongst the flowsheet alternatives being examined at a prefeasibility study level is

    Jan 1, 2012

  • CIM
    Cone Crusher Technology - Factors of Performance

    By Ronald B. DeDiemar

    This paper will present the intrinsic factors of a cone crusher that affect performance, develop and define an ideal feed gradation for a cone crusher and, finally, bring out an important new developm

    Jan 1, 1979

  • CIM
    Phases and Phase Relations of the Platinum-Group Elements

    "3.1. IntroductionAmong the six platinum-group elements (POE), four have identical cubic symmetry, two identical hexagonal symmetry (Table 3.1). Despite crystallographic differences, there is a clear

    Jan 1, 1979

  • CIM
    Testing and Modelling a Novel Iron Control Concept in a Two-Stage Ferric Leach/Pressure Oxidation Process for the Sepon Copper Project

    By K. G. Baxter, D. G. Dixon

    The Sepon process plant utilises an autoclave to oxidize a flotation concentrate containing pyrite, residual copper minerals, and sulphur. The concentrate is produced from the residue of a preceding a

    Jan 1, 2004

  • CIM
    Effects of Ti-Ta Alloy Additions on Ti-46Al Castings

    By J. Zollinger, J. R. Kennedy, J. H. Park, D. Daloz

    "In order to improve the properties of cast Ti-Al alloys to replace Ni-based superalloys past the low pressure stages of aircraft engines investigations into inoculation for grain refinement were carr

    Jan 1, 2017

  • CIM
    Computer predictions of coal cleaning performance

    By Brian L. Beninger

    This paper discusses the application of the computer to coal preparation process predictions. In broad terms, the computer is used to perform two main functions. Firstly, the given float-sink analysis

    Jan 1, 1979

  • CIM
    Integrated Mining and Processing Systems Design for Eco-Efficiency

    By H. C. L. Reemeyer

    "The mining industry faces increasing economic, environmental and social challenges, as easier deposits deplete and ores become more difficult to mine and process; head grades decline; projects migrat

    Jan 1, 2017

  • CIM
    Selective Counter Current Leaching and Oxalate Precipitation of Rare Earth Elements in Chloride Media: The Case for Bastnasite and Ancylite Minerals.

    By H. W. Kasaini, E. Bourricaudy, T. Larochelle

    Rare Element Resources Inc., a U.S. based company, has developed a three-stage process for producing a +98% mixed REO powder from hard rock feedstock (-48 mesh, 2.9-4.8% REO) consisting of bastnaesite

    Jan 1, 2016

  • CIM
    Development of High-Strength and High-Toughness Plates for API X-100 and X-120 Linepipe Steels for the 21st Century

    By C. I. Garcia, G. Zhou, W. Gao, A. J. DeArdo

    The development of X-100 and X-120 linepipe steels was investigated using a series of low-carbon Mo-Nb-B steels. The laboratory steels were vacuum melted and processed using advanced thermomechanical

    Jan 1, 2005

  • CIM
    The Nature and Distribution of Tantalum Mineralization in Pegmatite Dikes, Lilypad Lakes Property, Fort Hope, Northwestern Ontario

    By J. A. Morgan, W. A. Barclay, J. C. Pedersen, I. C. Campbell, D. S. Bubar, R. P. Taylor

    "Abstract - The Lilypad Lakes property is host to a group of Ta-mineralized dikes that occur over an area of at least 10 km2. Field relationships are consistent with a syn- to late syn-tectonic timing

    Jan 1, 2005

  • CIM
    The Lead-Zinc Deposits of Pine Point

    By Neil Campbell

    "The gently-dipping Devonian dolomite beds south of Great Slave lake in northern Canada are nearly every-where concealed by a cover of glacial drift and muskeg. Nevertheless, in 1898 or earlier, four

    Jan 1, 1966

  • CIM
    An Experiment. in Reconnaissance Mapping

    By G. Shaw

    IN recent years, most of the reconnaissance work of the Geological Survey of Canada has been mapped on a scale of 1 inch to 4 miles. Topographic base maps, commonly made from aerial photographs, were

    Jan 1, 1943

  • CIM
    AC drive application issues

    By A. C. Stevenson

    "There are many critical application issues that affect all AC drives, but there are several that are absolutely mandatory for pulse width modulated (PWM) AC drives. If these rules are not followed, t

    Jan 1, 2000

  • CIM
    The Use of Steel Arches in Supporting Underground Roadways

    By Louis Frost

    The coal-mining industry of Nova Scotia, particularly of the island of Cape Breton, today faced as no other industry with economic problems calling for progressive engineering with production on an ec

    Jan 1, 1928

  • CIM
    Prognoses for Alberta thermal and metallurgical coal

    "Projections of demand for Alberta coal indicate a quadrupling of current production rates to some 70 million tonnes/year by the end of the century. About half of this output-comprised of subbituminou

    Jan 1, 1982

  • CIM
    Mining Methods and Costs at the Josephine Mine

    By Alan E. Gallie

    One of the requirements for the successful waging of war is an unlimited supply of iron ore. In the spring of 1941 the demand for iron ore was expected to exceed the supply. This was particularly so i

    Jan 1, 1947

  • CIM
    Dust collection

    By I. Tinto

    "IntroductionEnvironmental pollution problems, caused by gases or effluents, by high noise levels or from air borne dust, are placing increasing demands of the operators, from statutory authorities, a

    Jan 1, 1989

  • CIM
    Dissolution Behaviour of Karaçam Lateritic Nickel Ore in H2SO4 and HCl Media

    By E. Uzun

    "In this study, H2SO4 and HCl leaching behaviour of an ore sample containing 1.87% of Ni, obtained from the Karaçam (Eskisehir-Turkey) lateritic deposit that started operation recently was investigate

    Jan 1, 2017

  • CIM
    Managing Technology Risk

    By Chris Twigge-Molecey, John Peacey

    To meet the business objectives of a metallurgical project, there is often a need for new and untried technology or equipment, whose very novelty can present serious risks to meeting those objectives.

    Jan 1, 2015